Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 4 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 3 Little BirdsRegistered · no quarterly update yet | Zenso Little Birds Projects LLP | Apartment | 724 sqft carpet (as filed) | Sep 2026 |
| Adarsh Palm Acres - Phase 1-Part ALapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 1,604 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part AFiled as completed · no completion certificate on record | Bangalore Best Realty Private Limited | Apartment | – | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part BLapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 2,906 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part BLapsed · completion date passed | Bangalore Best Realty Private Limited | Apartment | 2,906 sqft carpet (as filed) | Nov 2023 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 23 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adarsh Palm Acres - Phase 2-Part ALapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | – | Nov 2023 |
| Adarsh Palm Acres - Phase 2-Part BLapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 3,111 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres (Phase III)Active · 3% built | Adarsh Developers | Villa | 3,150–5,687 sqft | 2028 |
8 of 67 other projects in Bagalur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Assetz Kvn Niwa & Neo in the interactive atlas
Approval or registration
Khata issued
E Khatha · Village Development and Panchayat Raj De · Survey 9
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of Elite Projects · Survey 9
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
KIADB · plan DO3-KIADB-00021/26-27/BP
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/472/PR/220726/008831
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 21 Apr 2026 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | R 9 D3 | |
|---|---|---|
| Land extent, Sy R 9 D3 | 22,946 Sq mts | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 22,946 sq m | |
| Khata | E Khatha · Village Development and Panchayat Raj De · 20 Jan 2025 | |
| Sale deed | Dated 31 Jan 2025 | |
| Sale deed in favour of | Elite Projects | |
Valid as of this reportValidity ended
| Building plan (KIADB) | Sanctioned 20 Jun 2026 · No. DO3-KIADB-00021/26-27/BP | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/249/2026 · issued 11 Jun 2026 · building height 89.4 m (TOWER A), 92.4 m (TOWER B, TOWER C) | Clear |
| Environmental clearance | SEIAA 92 CON 2026 · EC identification no. EC26C3801KA5620864N · issued 5 Jun 2026 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-354717 · issued 9 Jul 2026 · valid until 4 Jun 2036 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Sep 2031 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | R 9 D3 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK2t · avg 92 m² 40.1%Ews · avg 17 m² 20%2BHK2t · avg 87 m² 20%3BHK3t · avg 103 m² 19.3%1BHK 0.6%
| 1BHK | 5 | 2,077 |
| 2BHK2t | 169 | 1,58,240 |
| 3BHK2t | 339 | 3,35,651 |
| 3BHK3t | 163 | 1,81,167 |
| Ews | 169 | 31,097 |
| Sold, Q2 2026-27 | 0 / 845 | |
|---|---|---|
| Unsold, Q2 2026-27 | 845 |
| Assetz Sora & Saki Phase 2 | about 0.5 km | Locked | |
|---|---|---|---|
| Assetz Sora & Saki Phase 3 | about 1 km | Locked | |
| Kumar Plumeria | about 3 km | Locked | |
| Birla Trimaya | about 4.5 km | Locked | |
| Birla Trimaya Phase-2 |
| Assetz Kvn Niwa & Neo This project | This project is the point the others are measured from | 30 Sep 2031 | 0% (0 of 845) | Not verified yet |
|---|---|---|---|---|
| Assetz Sora & Saki Phase 2 | about 0.5 km | 31 Jul 2029 | 38% (242 of 634) | Locked |
| Assetz Sora & Saki Phase 3 | about 1 km | 30 Apr 2029 | 30% (92 of 304) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 9.5 km, Shankrappa Layout, MAruthi nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 1.5 km, Ponnaiyar, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.92 (775 covered spaces for 845 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (KIADB) | |
| Nearest city water main | Not verified yet | |
| Main structure | Not started · planned by 31 Oct 2029 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Oct 2029 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 2% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 30 Sep 2031 | |
|---|---|---|
| Schedule end | 30 Sep 2031 | |
| RERA completion date | 30 Sep 2031 | |
| Work began, as filed | 15 Sep 2026 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 89.4 m (TOWER A), 92.4 m (TOWER B, TOWER C) on the fire NOC · filed: TOWER A 89.4 m, TOWER B 92.4 m, TOWER C 92.4 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 205.32 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Oct 2026 | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/249/2026 · issued 11 Jun 2026 · building height 89.4 m (TOWER A), 92.4 m (TOWER B, TOWER C) | |
| Environmental clearance | SEIAA 92 CON 2026 · EC identification no. EC26C3801KA5620864N · issued 5 Jun 2026 | |
| Architect, quarterly | Form 5 · Oct 2026 | |
| Architect's certificate, registration | Dated 8 Jul 2026 · site inspected 1 Jul 2026 | |
| Engineer's certificate, registration | Dated 8 Jul 2026 | |
| Chartered accountant's certificate, registration | Dated 10 Jul 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹36.71 Cr 4.9%Development · ₹713.11 Cr 95.1%
| Estimated cost | ₹749.83 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹436.37 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Unsold (845) 100%
| Sold, Q2 2026-27 | 0 / 845 · 845 available | |
|---|---|---|
| Unsold, Q2 2026-27 | 845 |
| Escrow bank | YES BANK · Kasturba Road | |
|---|---|---|
| Designated account, collected | ₹3.96 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 (0% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 14 | |
|---|---|---|
| Marked completed | 3 | |
| Past promised date, not completed | 8 | Review |
| Complaints filed against the promoter | 0 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 21 Apr 2026 | |
| Building plan (KIADB) | Sanctioned 20 Jun 2026 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | YES BANK · Kasturba Road | |
| about 4.5 km |
| Locked |
| Ekta Elements | about 5 km | Locked |
|---|
| Birla Trimaya Phase-3 | about 5 km | Locked |
|---|
| Varnam Phase 1c | about 5 km | Locked |
|---|
| Assetz Zen & Sato | about 5.5 km | Locked |
|---|
| Barca II At Godrej Msr City | about 5.5 km | Locked |
|---|
| Sattva City | about 5.5 km | Locked |
|---|
| Godrej MSR City | about 6 km | Locked |
|---|
| Kumar Plumeria | about 3 km | 31 Dec 2028 | 5% (5 of 100) | Locked |
|---|
| Birla Trimaya | about 4.5 km | 15 Dec 2031 | 90% (494 of 548) | Locked |
|---|
| Birla Trimaya Phase-2 | about 4.5 km | 20 Jun 2029 | 99% (470 of 473) | Locked |
|---|
| Ekta Elements | about 5 km | 31 Dec 2027 | Not filed | Locked |
|---|
| Projects within 4 km, counted | 16 (16 with an approximate location) | |
|---|---|---|
| Flats in them | 13,936 | |
| Booked | 11,160 of 13,936 (80%) | |
| Unsold | 2,776 | |
| Booked a month, pooled | 219 flats | |
| Months to sell, pooled | 13 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1.5 km, Ponnaiyar, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 5.5 km, Airport City | |
| Kempegowda Airport | 12.5 | 6.5 |
| MG Road (CBD) | 24 | 21 |
| Manyata Tech Park | 17.5 | 13 |
| ITPL, Whitefield | 28.5 | 19 |
| Ecospace, Bellandur ORR | 35 | 24.5 |
| Electronic City Ph 1 | 44 | 34.5 |
| Landfill or waste transfer station | about 1 km, named Bagalur Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 1 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Bagalur Substation on OpenStreetMap |