| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 4 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
Part of the full report. Unlock all 4 sections
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
Title & ownership
Approvals
Disputes & cases
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 30 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Valuation |
|---|
| – |
| – |
| – |
| Locked |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adarsh ParadiseActive · 87% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
| Adithya RicaCompleted (regulator flag) | ADITHYA CONSTRUCTIONS | Apartment | 769 sqft carpet (as filed) | Completed |
8 of 264 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Assetz Sun & Sanctum - Phase 2 in the interactive atlas
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 23 Feb 2024 · No. BBMP/Addl.Dir/JDNORTH/0064/22-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/1238/2018 · building height 26.95 m (WING 4), 38.95 m (WING 5) | Clear |
| Environmental clearance | SEIAA 55 CON 2018 · issued 16 May 2018 | Clear |
| Airport height NOC | issued 18 May 2018 · permissible top elevation 981.87 m above mean sea level · validity ended 17 May 2026 | |
| Pollution board (CFE) | consent order W-347260 · issued 27 Jan 2025 · valid until 30 Jun 2029 | Clear |
| Water and sewerage NOC (BWSSB) | issued 20 Jul 2023 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Jul 2026 |
| Land conversion | Converted 16 Jan 2015 · Deputy Commissioner Bangalore Urban | |
|---|---|---|
| Survey numbers | 58-1 |
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, VINAYAKA LAYOUT NEAR BASAVANAPURA MAIN ROAD | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 95% | |
| Electricity, built | 100% | |
| Outdoor Sports facility, built | 95% | |
| Swimming Pool, built | 100% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 100% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.71 (120 covered spaces for 70 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |

| Main structure | 100% · planned by 30 Apr 2025 | |
|---|---|---|
| Electrical and plumbing finishing | 95% · planned by 30 Jul 2026 | |
| Internal roads | Not verified yet | |
| Club house | 95% | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 31 Jul 2026 | |
|---|---|---|
| Schedule end | 31 Jul 2026 | |
| RERA completion date | 31 Jul 2026 | |
| Work began, as filed | 28 Aug 2023 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 26.95 m (WING 4), 38.95 m (WING 5) on the fire NOC · filed: WING 4 26.95 m, WING 5 32.95 m | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Mar 2026 | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/1238/2018 · building height 26.95 m (WING 4), 38.95 m (WING 5) | |
| Environmental clearance | SEIAA 55 CON 2018 · issued 16 May 2018 | |
| Architect, quarterly | Form 5 · Mar 2026 | |
| Architect's certificate, registration | Dated 4 Mar 2024 · site inspected 1 Jan 2024 | |
| Engineer's certificate, registration | Dated 5 Mar 2024 | |
| Chartered accountant's certificate, registration | Dated 5 Mar 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹14.17 Cr 24.2%Development · ₹44.29 Cr 75.8%
| Estimated cost | ₹58.46 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹58.46 Cr, same as the filing | |
| Estimated cost, engineer's certificate | ₹33.94 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹7.46 Cr | |
| Land cost revision | Not verified yet | |
Sold (70) 100%
| Sold, Q3 2025-26 | 70 / 70 · 0 available | |
|---|---|---|
| Unsold, Q3 2025-26 | 0 |
| Escrow bank | HDFC · Richmond Road | |
|---|---|---|
| Designated account, collected | ₹3.48 Cr in Q3 2025-26 | |
| Designated account, withdrawn | ₹2.49 Cr in Q3 2025-26 (72% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹28,53,489 | |
| Withdrawn from the escrow account to date | ₹58,66,16,145 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | Altico Capital India Ltd · ₹33.98 Cr disbursed | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 23 Feb 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · Richmond Road | |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 3 km, Mahadevapura | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 33 | 19.5 |
| MG Road (CBD) | 15.5 | 12 |
| Manyata Tech Park | 11.5 | 9.5 |
| ITPL, Whitefield | 8.5 | 5.5 |
| Ecospace, Bellandur ORR | 15 | 11 |
| Electronic City Ph 1 | 30.5 | 20.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named KR Puram Phase I 20MLD Sewage Treatment Planet on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the south-west, named ITI on OpenStreetMap |