Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
Part of the full report. Unlock all 4 sections
| Advaitha AkshaCompleted · OC 10-03-2022 | Advaitha ventures Pvt Ltd | Apartment | 1,567 sqft carpet (as filed) | Completed |
| Arihant VilayaLapsed · completion date passed | ARIHANT FOUNDATIONS AND HOUSING LIMITED | Apartment | – | Dec 2023 |
| BelakuLapsed · completion date passed | Millennial Luxury Estates Private Limited | Apartment | 2,284–2,621 sqft carpet (as filed) | Mar 2026 |
| Gp AdityaCompleted · OC 16-01-2024 | VIJAYA LAKSHMI CONSTRUCTIONS | Apartment | 891 sqft carpet (as filed) | Completed |
| Green FontanaLapsed · completion date passed | GREEN CARS PVT LTD | Apartment | – | Dec 2019 |
| Hamiton TowersCompleted · OC 12-02-2024 | Pelagsus Infrastructures Pvt Ltd | Apartment | 2,160 sqft carpet (as filed) | Completed |
Title & ownership
Approvals
Disputes & cases
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 61 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Valuation |
|---|
| – |
| – |
| – |
| Locked |
| Location & risks | – | 1 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Heavie HalcyonActive · 21% built | Sentient Devcon LLP | Apartment | 1,013–1,495 sqft carpet (as filed) | Aug 2027 |
| Kolte-Patil 24K GrazioLapsed · completion date passed | Kolte-Patil Developers | Apartment | 1,931–2,604 sqft | – |
8 of 21 other projects in Koramangala, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aydin Infra Signature 3 in the interactive atlas
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
| Building plan (BBMP) | Sanctioned 8 Nov 2023 · No. BBMP/Ad.Com./SUT/1077/23-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 5 Aug 2027 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | [number withheld] |
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Parks & open space, at the filed pin | Review |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 960 m, SRINIVAGILU TANK BED LAYOUT | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 50 m to the east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 30 m to the north, K100 | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 25% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.08 (13 covered spaces for 12 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported itPossession date in the agreement

| Main structure | 100% · planned by 1 May 2026 | |
|---|---|---|
| Electrical and plumbing finishing | 50% · planned by 10 Dec 2026 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 85% | |
| Completion, accountant | 56.9% of the estimated cost spent | |
| Possession, agreement | 5 Aug 2027 | |
|---|---|---|
| Schedule end | 25 Dec 2026 | |
| RERA completion date | 5 Aug 2027 | |
| Completion date, agreement | 5 Aug 2027 | |
| Work began, as filed | 5 Apr 2024 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 11.49 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 4 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹5.07 Cr 34.8%Development · ₹9.50 Cr 65.2%
| Estimated cost | ₹14.57 Cr | |
|---|---|---|
| Cost incurred | ₹8.29 Cr (56.9% of the estimate) | |
| Cost left | ₹6.28 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹6.30 Cr | |
| Land cost revision | Not verified yet | |
Sold (6) 50%Unsold (6) 50%
| Sold, Q3 2025-26 | 6 / 12 · 6 available | |
|---|---|---|
| Sold, Q4 2025-26 | 6 / 12 · 6 available | |
| Sold, Q1 2026-27 | 6 / 12 · 6 available | |
| Sold, Q2 2026-27 | 6 / 12 · 6 available | |
| Unsold, Q2 2026-27 | 6 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 | |
| Flats booked, Form 4 Q4 2025-26 | 6 |
| Escrow bank | KOTAK MAHINDRA BANK · Cunningham road | |
|---|---|---|
| Designated account, collected | ₹20.0 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹14.9 L in Q2 2026-27 (74% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 8 Nov 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | KOTAK MAHINDRA BANK · Cunningham road | |

Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Other | |
| Nearest city water main | 80 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 50 m to the east, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 940 m, Agara | |
| Kempegowda Airport | 40.9 | 45 | 30.8 |
| MG Road (CBD) | 8.6 | 14 | 6.8 |
| Manyata Tech Park | 17.2 | 23 | 13.1 |
| ITPL, Whitefield | 21.1 | 25 | 12.1 |
| Ecospace, Bellandur ORR | 8.4 | 14 | 4.2 |
| Electronic City Ph 1 | 15.5 | 20 | 10.7 |
| Landfill or waste transfer station | 2.1 km to the north-west | |
|---|---|---|
| Sewage treatment plant | 520 m to the north-west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 360 m to the south |