Overview
Emerald & Luminaire Block At Brigade El Dorado
Part ofBrigade El Dorado2 phases, 1,871 flats
Overview
Part ofBrigade El Dorado2 phases, 1,871 flats
Overview
Part ofBrigade El Dorado2 phases, 1,871 flats

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | 1 | – | 3 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 3 Little BirdsRegistered · no quarterly update yet | Zenso Little Birds Projects LLP | Apartment | 724 sqft carpet (as filed) | Sep 2026 |
| Adarsh Palm Acres - Phase 1-Part ALapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 1,604 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part AFiled as completed · no completion certificate on record | Bangalore Best Realty Private Limited | Apartment | – | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part BLapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 2,906 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres - Phase 1-Part BLapsed · completion date passed | Bangalore Best Realty Private Limited | Apartment | 2,906 sqft carpet (as filed) | Nov 2023 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 59 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adarsh Palm Acres - Phase 2-Part ALapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | – | Nov 2023 |
| Adarsh Palm Acres - Phase 2-Part BLapsed · completion date passed | Adarsh Nivaas Private Limited | Apartment | 3,111 sqft carpet (as filed) | Nov 2023 |
| Adarsh Palm Acres (Phase III)Active · 3% built | Adarsh Developers | Villa | 3,150–5,687 sqft | 2028 |
8 of 67 other projects in Bagalur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Emerald & Luminaire Block At Brigade El Dorado in the interactive atlas
Approval or registration
Land use converted
Chief Minister of Karnataka · Survey 150200201200321111
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of Brigade Tetrarch Private Limited · Survey 150200201200321111
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
KIADB · plan KIADB/DO-3&EE/458/2019-20
K-RERA filing, approvals
Approval or registration
Khata issued
E Khatha · Bagaluru Grama Panchayat · Survey 150200201200321111
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/190722/005089
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 23 Jan 2020 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 150200201200321111 | |
|---|---|---|
| Land extent, Sy 150200201200321111 | 2,02,344 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 38,196 sq m | |
| Khata | E Khatha · Bagaluru Grama Panchayat · 12 Dec 2019 | |
| Sale deed | Dated 2 Mar 2019 | |
| Sale deed in favour of | Brigade Tetrarch Private Limited | |
Valid as of this reportValidity ended
| Building plan (KIADB) | Sanctioned 22 Aug 2019 · No. KIADB/DO-3&EE/458/2019-20 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC (1 of 3) | KSFES/NOC/257/2019 · issued 12 Feb 2020 | Clear |
| Fire NOC (2 of 3) | KSFES/NOC/245/2021 · issued 27 Jun 2022 | Clear |
| Fire NOC (3 of 3) | KSFES/NOC/019/2023 · issued 8 May 2023 | |
| Environmental clearance | SEIAA 134 CON 2018 · issued 18 May 2019 | Clear |
| Airport height NOC (1 of 2) | issued 28 Aug 2017 · validity ended 27 Aug 2025 | |
| Airport height NOC (2 of 2) | issued 1 Sep 2017 · validity ended 31 Aug 2025 | |
| Pollution board (CFE) | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 2 | |
| RERA completion date | 31 Dec 2026 |
| Land conversion | Converted 19 Feb 2011 · Chief Minister of Karnataka | |
|---|---|---|
| Survey numbers | 150200201200321111 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
3BHK · 58 m² 56.2%2BHK · 43 m² 28.8%3BHK · 60 m² 14.9%1BHK · 36 m² 0.1%
| 1BHK | 1 | 388 |
| 2BHK | 356 | 463 |
| 3BHK | 695 | 624 |
| 3BHK | 184 | 646 |
| Sold, Q2 2026-27 | 1,005 / 1,007 | |
|---|---|---|
| Unsold, Q2 2026-27 | 2 |
| Assetz Sora & Saki Phase 2 | about 1 km | Locked | |
|---|---|---|---|
| Assetz Sora & Saki Phase 3 | about 1.5 km | Locked | |
| Kumar Plumeria | about 3 km | Locked | |
| Birla Trimaya | about 5 km | Locked | |
| Birla Trimaya Phase-2 |
| Emerald & Luminaire Block At Brigade El Dorado This project | This project is the point the others are measured from | 31 Dec 2026 | 100% (1,005 of 1,007) | Not verified yet |
|---|---|---|---|---|
| Assetz Sora & Saki Phase 2 | about 1 km | 31 Jul 2029 | 38% (242 of 634) | Locked |
| Assetz Sora & Saki Phase 3 | about 1.5 km | 30 Apr 2029 | 30% (92 of 304) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 9.5 km, Shankrappa Layout, MAruthi nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 1 km, Ponnaiyar, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Indoor Sports facility · Gym · Water and Sanitation | |
|---|---|---|
| Electricity, built | 100% | |
| Outdoor Sports facility, built | 100% | |
| Swimming Pool, built | 100% | |
| Gas, built | 100% | |
| Air Conditioning And incerntion, built | 100% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.79 (978 covered spaces for 1,236 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not declared | |
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB, Local authority (Local Authority), Other | |
| Nearest city water main | Not verified yet | |
As the promoter reported it

| Main structure | 100% · planned by 30 Jun 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 31 Dec 2024 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Mar 2025 | |
| RERA completion date | 31 Dec 2026 | |
| Work began, as filed | 13 Jul 2022 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety (1 of 3) | KSFES/NOC/257/2019 · issued 12 Feb 2020 | |
| Fire safety (2 of 3) | KSFES/NOC/245/2021 · issued 27 Jun 2022 | |
| Fire safety (3 of 3) | KSFES/NOC/019/2023 · issued 8 May 2023 | |
| Environmental clearance | SEIAA 134 CON 2018 · issued 18 May 2019 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Chartered accountant, Form 4 | Dated 10 Jul 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost | ₹380.55 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (1,005) 99.8%Unsold (2) 0.2%
| Sold, Q3 2025-26 | 1,006 / 1,007 · 1 available | |
|---|---|---|
| Sold, Q4 2025-26 | 1,004 / 1,007 · 3 available | |
| Sold, Q1 2026-27 | 1,001 / 1,007 · 6 available | |
| Sold, Q2 2026-27 | 1,005 / 1,007 · 2 available | |
| Unsold, Q2 2026-27 | 2 | |
| Sold in Q4 2025-26 | 2 bookings cancelled or corrected (1,006 → 1,004 sold) | |
| Sold in Q1 2026-27 | 3 bookings cancelled or corrected (1,004 → 1,001 sold) | |
| Sold in Q2 2026-27 | 4 |
| Escrow bank | Axis Bank · Malleshwaram | |
|---|---|---|
| Designated account, collected | ₹13.02 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹5.84 Cr in Q2 2026-27 (45% of that quarter's deposits) | |
| Amount deposited in the quarter, Form 4 | ₹13,05,00,000 | |
| Escrow account, Q3 2025-26 | ₹13.05 Cr deposited from sales | |
| Share of collections deposited in escrow | 70% | |
| Sale proceeds realised, Q3 2025-26 | ₹18,65,00,000 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 2 | |
| K-RERA registrations under this promoter | 10 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 3 | |
| Complaints filed against the promoter | 9 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 23 Jan 2020 | Review |
| Building plan (KIADB) | Sanctioned 22 Aug 2019 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · Malleshwaram | |

| about 5 km |
| Locked |
| Birla Trimaya Phase-3 | about 5.5 km | Locked |
|---|
| Ekta Elements | about 5.5 km | Locked |
|---|
| Varnam Phase 1c | about 5.5 km | Locked |
|---|
| Assetz Zen & Sato | about 6 km | Locked |
|---|
| Barca II At Godrej Msr City | about 6 km | Locked |
|---|
| Sattva City | about 6.5 km | Locked |
|---|
| Godrej MSR City | about 6.5 km | Locked |
|---|
| Kumar Plumeria | about 3 km | 31 Dec 2028 | 5% (5 of 100) | Locked |
|---|
| Birla Trimaya | about 5 km | 15 Dec 2031 | 90% (494 of 548) | Locked |
|---|
| Birla Trimaya Phase-2 | about 5 km | 20 Jun 2029 | 99% (470 of 473) | Locked |
|---|
| Birla Trimaya Phase-3 | about 5.5 km | 31 Aug 2030 | 95% (439 of 463) | Locked |
|---|
| Projects within 4 km, counted | 16 (16 with an approximate location) | |
|---|---|---|
| Flats in them | 13,774 | |
| Booked | 10,155 of 13,774 (74%) | |
| Unsold | 3,619 | |
| Booked a month, pooled | 219 flats | |
| Months to sell, pooled | 13 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1 km, Ponnaiyar, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 6 km, Airport City | |
| Kempegowda Airport | 12 | 6.5 |
| MG Road (CBD) | 24.5 | 21 |
| Manyata Tech Park | 18 | 13 |
| ITPL, Whitefield | 29.5 | 18.5 |
| Ecospace, Bellandur ORR | 35.5 | 24.5 |
| Electronic City Ph 1 | 45 | 34 |
| Landfill or waste transfer station | about 2 km, named Bagalur Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 3 km to the north-east, named 40MLD Tertiary Treatment Plant on OpenStreetMap | |
| Quarry | about 1.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Bagalur Substation on OpenStreetMap |