Overview
Overview
Overview
Taken 1 Apr 2026| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
Part of the full report. Unlock all 3 sections
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 82 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Locked |
| Location & risks | – | 1 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Engrace Vista in the interactive atlas
| Survey | Land converted | Sale deed | Khata | Extent |
|---|---|---|---|---|
| Survey 38 | ||||
| 38/1 | 15 Jun 2023DC Office, bengaluru | 18 Jul 2022 | 21 Dec 2023E Khatha · Village Panchayat | 25 Guntas |
| 38/2 | 15 Jun 2023DC Office, Bengaluru | 26 Sep 2022in favour of Modern Spaaces Ventures | 21 Dec 2023E Khatha · Village Panchayat | 3 Acres 12 Guntas |
| 38/3 | 15 Jun 2023DC Office Bengaluru | 29 Sep 2014 | 21 Dec 2023E Khatha · Village Panchayat | 27 Guntas |
| 38/4 | 15 Jun 2023DC Offie Bengaluru | 7 Jul 2023in favour of Modern Spaaces Ventures | 21 Dec 2023E Khatha · Village Panchayat | 28 Guntas |
| 42/2 | 15 Jun 2023DC Offie Bengaluru | 10 Nov 2022in favour of Modern Spaaces Ventures | 21 Dec 2023E Khatha · Village Panchayat | 2 Acres 30 Guntas |
K-RERA filing, land schedule
Deeds read, and the whole project
Transfer of the land
Title deed executed
Sy 38/3; 38/1, Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 9 · See it in Documents
Transfer of the land
Title deed registered
No. SRJ-1-02063-2020-21 · Book 1 · executed 28 Sep 2020
Title deed filed with K-RERA, pp. 1, 6 · See it in Documents
Transfer of the land
Title deed registered
No. ANK-1-03438-2022-23 · Book 1 · executed 18 Jul 2022 · Consideration ₹34.4 L · Sy 38/1, Sarjapura hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 4, 8, 13 · See it in Documents
Transfer of the land
Title deed registered
No. SRJ-1-05273-2022-23 · Book 1 · executed 26 Sep 2022 · Consideration ₹2.05 Cr · Sy 38/2, Kada Agrahara village, Sarjapura hobli, Anekal taluk · 3 Acre 12 Guntas
Title deed filed with K-RERA, pp. 1, 5, 6, 9 · See it in Documents
Transfer of the land
Title deed registered
No. SRJ-1-06498-2022-23 · Book 1 · executed 9 Nov 2022 · Consideration ₹4.10 Cr
Title deed filed with K-RERA, pp. 1, 13, 16
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 5 Feb 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: Conversion Sketch, 1 page, not in English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 38/1, 38/2, 38/3, 38/4, 42/2 | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 32,577 sq m | |
| Khata | E Khatha · Village Panchayat · 21 Dec 2023 | |
| Sale deed | Dated 29 Sep 2014, 18 Jul 2022, 26 Sep 2022 and 2 more | |
| Sale deed in favour of | Modern Spaaces Ventures | |
| Building plan (Local Planning Authority) | Sanctioned 18 Jan 2024 · No. AYP/CC/1100/2023-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/317/2023 · issued 29 Dec 2023 · building height 44.95 m | Clear |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Dec 2028 |
| Land conversion | 5 of 5 parcels converted | |
|---|---|---|
| Sy 38/1, 38/2 | Converted 15 Jun 2023 · DC Office, bengaluru | |
| Sy 38/3 | Converted 15 Jun 2023 · DC Office Bengaluru | |
| Sy 38/4, 42/2 | Converted 15 Jun 2023 · DC Offie Bengaluru | |
| Survey numbers | 38/1 · 38/2 · 38/3 · 38/4 · 42/2 |
₹99 for this report opens Valuation, Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs and Disputes & cases for this project, yours to read for good.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 7 km, Gunjur | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | Review |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Piped Gas, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.32 (516 covered spaces for 392 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported itPossession date in the agreement
Taken 1 Apr 2026| Main structure | 60% · planned by 1 Jan 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 1 Aug 2028 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 60% | |
| Completion, accountant | 53.6% of the estimated cost spent | |
| Possession, agreement | 30 Dec 2028 | |
|---|---|---|
| Schedule end | 31 Dec 2028 | |
| RERA completion date | 30 Dec 2028 | |
| Work began, as filed | 20 Feb 2024 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 44.95 m on the fire NOC · 44.95 m filed, 7 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 50 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/317/2023 · issued 29 Dec 2023 · building height 44.95 m | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Site inspected 10 Jan 2024 | |
| Engineer's certificate, registration | Dated 31 Jan 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹78.20 Cr 22.1%Development · ₹275.60 Cr 77.9%
| Estimated cost | ₹355.80 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹275.60 Cr | |
| Estimated cost, Form 4 Q1 2026-27 | ₹345.64 Cr | |
| Cost incurred | ₹185.29 Cr (53.6% of the estimate) | |
| Cost left | ₹160.35 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹50.49 Cr | |
| Land cost revision | Not verified yet | |
Sold (181) 46.2%Unsold (211) 53.8%
| Sold, Q3 2025-26 | 173 / 392 · 219 available | |
|---|---|---|
| Sold, Q4 2025-26 | 178 / 392 · 214 available | |
| Sold, Q1 2026-27 | 178 / 392 · 214 available | |
| Sold, Q2 2026-27 | 181 / 392 · 211 available | |
| Unsold, Q2 2026-27 | 211 | |
| Sold in Q4 2025-26 | 5 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 3 |
| Escrow bank | Industrial Development Bank of India · M G Road | |
|---|---|---|
| Designated account, collected | ₹5.42 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 (0% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 9 | |
|---|---|---|
| Marked completed | 5 | |
| Past promised date, not completed | 3 | Clear |
| Complaints filed against the promoter | 0 | |
| Other phases under this promoter name | 5 | |
| With a filed extension or completion | 5 (5 completed, 0 extended) | |
| Average schedule slip | 6 months |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 5 Feb 2024 | Review |
| Building plan | Sanctioned 18 Jan 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Industrial Development Bank of India · M G Road | |
Taken 1 Apr 2026Transfer of the land
Title deed executed
Sy 38/3; 38/1, Anekal taluk
Title deed filed with K-RERA, pp. 1, 36 · See it in Documents
Transfer of the land
Title deed registered
No. SRJ-1-02635-2023-24 · Book 1 · executed 7 Jul 2023 · Consideration ₹76.5 L · Sy 38/4; 38/1, Sarjapura hobli
Title deed filed with K-RERA, pp. 1, 4, 7, 13 · See it in Documents
Approval or registration
Building plan sanctioned
Local Planning Authority · plan AYP/CC/1100/2023-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/060324/006691
K-RERA registration ·
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Yamare Village Panchayat) | |
| Nearest city water main | Not verified yet | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | about 9 km, Bommasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 51 | 38 |
| MG Road (CBD) | 28 | 21.5 |
| Manyata Tech Park | 32 | 25.5 |
| ITPL, Whitefield | 17.5 | 14 |
| Ecospace, Bellandur ORR | 16.5 | 11 |
| Electronic City Ph 1 | 14 | 9.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |