| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | 1 | – | 2 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | |
Part of the full report. Unlock all 2 sections
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Survey |
|---|
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 69 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | 2 | 1 | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 379 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Godrej Parkshire (Hoskote) in the interactive atlas
| Land converted |
|---|
| Sale deed |
|---|
| Khata |
|---|
| Extent |
|---|
| Survey 36 | ||||
|---|---|---|---|---|
| 36/1 | 27 Nov 2018DC Office, Bangalore Rural | 30 May 2002 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 9 Guntas |
| 36/2, 36/3, 36/4A1 | 27 Nov 2018DC Office, Bangalore Rural | 7 Jul 2001 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 26.04 Guntas + 12 Guntas + 11 Guntas |
| 36/4A2 | 11 Jun 2025DC Office, Bangalore Rural | 12 Dec 1997 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 18.08 Guntas |
| 36/4B1 | 27 Nov 2018DC Office, Bangalore Rural | 12 Dec 1997 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 12 Guntas |
| 36/4B2 | 4 Jun 2025DC Office, Bangalore Rural | 12 Dec 1997 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 15.08 Guntas |
| 36/5 | 25 Sep 2025DC Office, Bangalore Rural | 8 Oct 1996 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 10 Guntas |
| 36/6 | 31 Oct 2018DC Office, Bangalore Rural | 11 Mar 2002 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 27.08 Guntas |
| 36/7 | 25 Sep 2025DC Office, Bangalore Rural | 30 May 2002 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 10.08 Guntas |
| 36/8 | 31 Oct 2018DC Office, Bangalore Rural | 12 Dec 1997 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 27.12 Guntas |
| 36/9 | 4 Jun 2025DC Office, Bangalore Rural | 12 Dec 1997 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 1 Acre 5 Guntas |
| Survey 66 | ||||
|---|---|---|---|---|
| 66/1 | 25 Sep 2025DC Office, Bangalore Rural | 12 Dec 1997 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 1 Acre 4.08 Guntas |
| 66/2 | 15 Mar 2025DC Office, Bangalore Rural | 12 Dec 1997 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 32.12 Guntas |
| 66/3 | 6 Mar 2025DC Office, Bangalore Rural | 12 Dec 1997 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 14.12 Guntas |
| Survey 67 | ||||
|---|---|---|---|---|
| 67/1A1 | 31 Oct 2018DC Office, Bangalore Rural | 12 Dec 1997 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 12 Guntas |
| 67/1A2 | 27 Nov 2018DC Office, Bangalore Rural | 12 Dec 1997 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 23 Guntas |
| 67/1A3 | 27 Nov 2018DC Office, Bangalore Rural | 7 Jul 2001 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 11 Guntas |
| 67/1B1 | 31 Oct 2018DC Office, Bangalore Rural | 12 Dec 1997 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 15 Guntas |
| 67/1B2 | 27 Nov 2018DC Office, Bangalore Rural | 12 Dec 1997 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 20.08 Guntas |
| 67/1B3 | 27 Nov 2018DC Office, Bangalore Rural | 7 Jul 2001 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 11.08 Guntas |
| 67/2 | 31 Oct 2018DC Office, Bangalore Rural | 12 Dec 1997 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 26 Guntas |
| 67/3 | 27 Nov 2018DC Office, Bangalore Rural | 12 Dec 1997 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 20.08 Guntas |
| 67/4 | 27 Nov 2018DC Office, Bangalore Rural | 7 Jul 2001 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 11.08 Guntas |
| Survey 68 | ||||
|---|---|---|---|---|
| 68/1, 68/2 | 27 Nov 2018DC Office, Bangalore Rural | 7 Jul 2001 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 21.12 Guntas + 19 Guntas |
| 68/3 | 4 Jun 2025DC Office, Bangalore Rural | 12 Dec 1997 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 19 Guntas |
| 68/4 | 27 Nov 2018DC Office, Bangalore Rural | 7 Jul 2001 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 15.04 Guntas |
| 68/5 | 4 Jun 2025DC Office, Bangalore Rural | 12 Dec 1997 | 27 Oct 2025E Khatha · Doddagattiganabbe Grama Panchayath | 1 Gunta |
K-RERA filing, land schedule
The whole project
Approval or registration
Building plan sanctioned
Hoskote Planning Authority · plan CC/445/2025-26
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/304/PR/090126/008393
K-RERA registration
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 6 Jan 2026 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 36/1, 36/2, 36/3, 36/4A1, 36/4A2, 36/4B1 and 23 more | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 55,037 sq m | |
| Khata | E Khatha · Doddagattiganabbe Grama Panchayath · 27 Oct 2025 | |
| Sale deed | Dated 8 Oct 1996, 12 Dec 1997, 7 Jul 2001 and 2 more | |
| Title deed | Kasaba hobli | |
Valid as of this reportValidity ended
| Building plan (Hoskote Planning Authority) | Sanctioned 29 Dec 2025 · No. CC/445/2025-26 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/448/2025 · issued 17 Nov 2025 | Clear |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-350740 · issued 25 Sep 2025 · valid until 24 Sep 2030 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 4 | |
| RERA completion date | 31 Dec 2030 |
| Land conversion | 29 of 29 parcels converted | |
|---|---|---|
| Sy 36/1, 36/2, 36/3, 36/4A1, 36/4B1,… | Converted 27 Nov 2018 · DC Office, Bangalore Rural | |
| Sy 36/4A2 | Converted 11 Jun 2025 · DC Office, Bangalore Rural | |
| Sy 36/4B2, 36/9, 68/3, 68/5 | Converted 4 Jun 2025 · DC Office, Bangalore Rural | |
| Sy 36/5, 36/7, 66/1 | Converted 25 Sep 2025 · DC Office, Bangalore Rural | |
| Sy 36/6, 36/8, 67/1A1, 67/1B1, 67/2 | Converted 31 Oct 2018 · DC Office, Bangalore Rural | |
| Sy 66/2 | Converted 15 Mar 2025 · DC Office, Bangalore Rural | |
| Other parcels | 1 more groups on the filing | |
| Survey numbers | 36/1 · 36/2 · 36/3 · 36/4A1 · 36/4A2 · 36/4B1 · 36/4B2 · 36/5 · 36/6 · 36/7 · 36/8 · 36/9 · 66/1 · 66/2 · 66/3 · 67/1A1 · 67/1A2 · 67/1A3 · 67/1B1 · 67/1B2 and 9 more parcels |
₹99 for this report opens Valuation and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation and Disputes & cases for this project, yours to read for good.
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | 83% Residential (main), 13% Water body | Review |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 400 kV, 120 m from the site | Clear |
| Nearest government-flagged flood location | 6.0 km, SIDDHARTHA LAYOUT KADUGODI | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 800 m to the south-west, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 150 m to the south-west, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| CCTV Surveillance, built | 0% | |
| Community Hall, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.07 (1,206 covered spaces for 1,132 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | Not started · planned by 10 Mar 2029 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 9 Jul 2030 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 7% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Dec 2030 | |
| RERA completion date | 31 Dec 2030 | |
| Work began, as filed | 1 Mar 2026 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 86.75 m filed, 5 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 10 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/448/2025 · issued 17 Nov 2025 | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | |
| Architect's certificate, registration | Dated 28 Nov 2025 · site inspected 28 Nov 2025 | |
| Engineer's certificate, registration | Dated 5 Jan 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹24.68 Cr 2.6%Development · ₹940.17 Cr 97.4%
| Estimated cost | ₹964.85 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹762.00 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (614) 54.2%Unsold (518) 45.8%
| Sold, Q4 2025-26 | 564 / 1,054 · 490 available | |
|---|---|---|
| Sold, Q1 2026-27 | 594 / 1,132 · 538 available | |
| Sold, Q2 2026-27 | 614 / 1,132 · 518 available | |
| Unsold, Q2 2026-27 | 518 | |
| Sold in Q1 2026-27 | 30 | |
| Sold in Q2 2026-27 | 20 |
| Escrow bank | Axis Bank · M G Road, Bangalore | |
|---|---|---|
| Designated account, collected | ₹85.62 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹37.84 Cr in Q2 2026-27 (44% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 4 | |
| K-RERA registrations under this promoter | 25 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 2 | |
| Complaints filed against the promoter | 65 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 6 Jan 2026 | |
| Building plan | Sanctioned 29 Dec 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · M G Road, Bangalore | |

Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 62 m
Across Hosakote, the water table sat 22.6 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 62 m, and it recovered 4.9 m over the year.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.6 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (Doddagattiganabbe Grama panchayath) | |
| Nearest city water main | 3.1 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 800 m to the south-west, Dakshina Pinakini, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 6.5 km, Whitefield | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 34.6 | 34 | 19.1 |
| MG Road (CBD) | 27.9 | 26 | 21.6 |
| Manyata Tech Park | 27.5 | 28 | 18.1 |
| ITPL, Whitefield | 12.5 | 13 | 8.6 |
| Ecospace, Bellandur ORR | 23.1 | 26 | 17.7 |
| Electronic City Ph 1 | 36.9 | 41 | 25.9 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 2.8 km to the north, named Hoskote on OpenStreetMap |