Taken 9 Apr 2026| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
Part of the full report. Unlock all 4 sections
| Aashirvad Siddhi PriyaFiled as completed · no completion certificate on record | SEENAPPA P | Plot | ~600–1,240 sqft (estimate: filed carpet plus 25%) | Nov 2024 |
| Aditya OrchardLapsed · completion date passed | Mangala Raghavan | Plot | ~1,200–1,800 sqft (estimate: filed carpet plus 25%) | May 2024 |
| Aprameya Brindavanam EliteCompleted (regulator flag) | Aprameya Properties Pvt Ltd | Plot | – | Completed |
| Ashwasurya Atharva RitewayCompleted (regulator flag) | RITEWAY & KUBERA PROMOTERS | Plot | ~1,200–2,400 sqft (estimate: filed carpet plus 25%) | Completed |
| Axis Banyan CountyCompleted (regulator flag) | R.Harish babu | Plot | – | Completed |
| Birla Apple SpireLapsed · completion date passed | Apple spire India LLP | Apartment |
Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 53 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Valuation |
|---|
| – |
| – |
| – |
| Locked |
| Location & risks | – | 1 | 1 | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | 1 | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 1,667 sqft carpet (as filed) |
| Sep 2019 |
| BloomfieldsActive · 85% built | Shravan Gupta | Plot | ~600–2,400 sqft (estimate: filed carpet plus 25%) | Apr 2029 |
| BlossomCompleted · OC 11-07-2024 | BRUHASPATI BUILDERS LLP | Apartment | 309 sqft carpet (as filed) | Completed |
8 of 101 other projects in Mysore Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Good Earth Ochre in the interactive atlas
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BDA) | Sanctioned 28 Feb 2024 · No. BDA/PS/EM/EO-3/TA-2/S25/2023-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-126460 · issued 20 Feb 2024 · valid until 6 Feb 2029 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Oct 2027 |
| Land conversion | 2 of 2 parcels converted | |
|---|---|---|
| Sy 191/2 | Converted 3 Nov 2023 · Deputy Commissioner, Bangalore Urban District | |
| Sy 230/2 | Converted 13 Sep 2023 · Special Deputy Commissioner, Bangalore Urban District | |
| Survey numbers | 191/2 · 230/2 |
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Map of the ground within about 1.1 km of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 2.2 km, Kengeri Yellamma temple | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 300 m to the north-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 120 m to the south, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · Community Hall · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 2.00 (76 covered spaces for 38 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it
Taken 9 Apr 2026| Main structure | 68% · planned by 31 Dec 2025 | |
|---|---|---|
| Electrical and plumbing finishing | 2% · planned by 31 Aug 2027 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 48% | |
| Completion, accountant | 42% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Oct 2027 | |
| RERA completion date | 31 Oct 2027 | |
| Work began, as filed | 1 May 2024 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 11.49 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 100 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Mar 2026, Apr 2026, Jul 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Mar 2026, Apr 2026, Jul 2026 (3 filed) | |
| Architect's certificate, registration | Site inspected 19 Mar 2024 | |
| Engineer's certificate, registration | Dated 10 Apr 2024 | |
| Chartered accountant's certificate, registration | Dated 18 Apr 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹25.55 Cr 11.8%Development · ₹190.71 Cr 88.2%
| Estimated cost | ₹216.26 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹74.21 Cr | |
| Estimated cost, engineer's certificate | ₹74.42 Cr | |
| Cost incurred | ₹90.75 Cr (42% of the estimate) | |
| Cost left | ₹125.51 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹110.25 Cr | |
| Land cost revision | Not verified yet | |
Sold (35) 92.1%Unsold (3) 7.9%
| Sold, Q3 2025-26 | 31 / 38 · 7 available | |
|---|---|---|
| Sold, Q4 2025-26 | 34 / 38 · 4 available | |
| Sold, Q1 2026-27 | 35 / 38 · 3 available | |
| Unsold, Q1 2026-27 | 3 | |
| Sold in Q4 2025-26 | 3 | |
| Sold in Q1 2026-27 | 1 |
| Escrow bank | State Bank of Mauritius Ltd. · ULSOOR ROAD, BENGALURU 560042 | |
|---|---|---|
| Designated account, collected | ₹14.69 Cr in Q1 2026-27 | |
| Designated account, withdrawn | ₹10.56 Cr in Q1 2026-27 (72% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 28 Feb 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | State Bank of Mauritius Ltd. · ULSOOR ROAD, BENGALURU 560042 | |
Taken 9 Apr 2026Map of storm drains, lakes and government-flagged flood locations within about 1.1 km of the site.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | 2.3 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 300 m to the north-east, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 1.3 km, Challaghatta | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 53.6 | 57 | 43.3 |
| MG Road (CBD) | 20.8 | 26 | 17.6 |
| Manyata Tech Park | 31.1 | 36 | 24.2 |
| ITPL, Whitefield | 38.0 | 44 | 31.3 |
| Ecospace, Bellandur ORR | 34.6 | 36 | 23.6 |
| Electronic City Ph 1 | 31.4 | 27 | 23.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.5 km to the north-east, named Doddabele 40MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 590 m to the south-east, named Provident Sunworth Substation on OpenStreetMap |