| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 37 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | 2 | – | Review |
|---|
| Construction & progress | – | 1 | – | Review |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Aditya Palm GroveApplied for completion 05/12/2019 |
| SRI ADITYA HOMES PRIVATE LIMITED |
| Plot |
| – |
| Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
| Aeropolis, A Project Of Sattva GroupLapsed · completion date passed | TRINAYANI REALTOR PRIVATE LIMITED | Apartment | 280–635 sqft carpet (as filed) | Jul 2026 |
| Aira HillsApplied for completion 17/02/2026 | Vaarahi Developers Pvt Ltd | Plot | – | Dec 2024 |
| Ajmal Flora Valley Phase -IIApplied for completion 01/10/2024 | M/s. Ajmal Flora Valley | Plot | ~2,140 sqft (estimate: filed carpet plus 25%) | May 2017 |
8 of 252 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open SLV Sri Radhakrishna Gardens in the interactive atlas
Covers 54/1 only
Approval or registration
Land use converted
DC Office, Bengaluru Rural · Survey 73/2, 54/1, 22/2, 22/3 and 1 more
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office, Bengaluru Rural · Survey 73/2, 54/1, 22/2, 22/3 and 1 more
K-RERA filing, land schedule
Covers 22/2, 22/3, 22/4 only
Approval or registration
Land use converted
DC Office, Bengaluru Rural · Survey 73/2, 54/1, 22/2, 22/3 and 1 more
K-RERA filing, land schedule
Covers 22/5 only
Approval or registration
Land use converted
DC Office, Bengalurur Rural · Survey 22/5
K-RERA filing, land schedule
Covers 54/2 only
Approval or registration
Land use converted
DC office, Bangalore Rural · Survey 54/2
K-RERA filing, land schedule
Covers 54/2 only
Approval or registration
Khata issued
A Khatha · 0 · Survey 54/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BIAPPA · plan BIAAPA/TP/LAO/47/2018-19
K-RERA filing, approvals
Covers 54/1 only
Approval or registration
Khata issued
A Khatha · 0 · Survey 73/2, 54/1, 22/2, 22/3 and 2 more
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · 0 · Survey 73/2, 54/1, 22/2, 22/3 and 2 more
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · 0 · Survey 73/2, 54/1, 22/2, 22/3 and 2 more
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1250/303/PR/100222/004693
K-RERA registration
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 54/2, 73/2, 54/1, 22/2, 22/3, 22/4 and 1 more | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Khata | A Khatha · 0 · 12 Aug 2020; A Khatha · 0 · 5 Feb 2022 | |
| Sale deed | 28 Jun 2007 | |
| Title deed | Executed 28 Jun 2007 · Sy 54/1, Kasaba hobli; Sy 73/2 · 1 Acre | |
| Building plan (BIAPPA) | Sanctioned 9 Dec 2021 · No. BIAAPA/TP/LAO/47/2018-19 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Mar 2022 |
| Land conversion | 7 of 7 parcels converted | |
|---|---|---|
| Sy 54/2 | Converted 10 Jan 2019 · DC office, Bangalore Rural | |
| Sy 73/2, 54/1, 22/2, 22/3, 22/4 | Converted 10 Jan 2019 · DC Office, Bengaluru Rural | |
| Sy 22/5 | Converted 10 Jan 2019 · DC Office, Bengalurur Rural | |
| Survey numbers | 54/2 · 73/2 · 54/1 · 22/2 · 22/3 · 22/4 · 22/5 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 0.5 km | Locked | |
|---|---|---|---|
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 0.5 km | Locked | |
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 0.5 km | Locked |
| SLV Sri Radhakrishna Gardens This project | This project is the point the others are measured from | 31 Mar 2022 | Not filed | Not verified yet |
|---|---|---|---|---|
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 0.5 km | 31 Dec 2026 | 100% (30 of 30) | Locked |
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 0.5 km | 30 Jun 2027 | 100% (30 of 30) | Locked |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture, at the filed pin | Review |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 16.6 km, Shankrappa Layout, MAruthi nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 540 m to the north, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 190 m to the north, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 Mar 2022 | Review |
| Work began, as filed | 8 Oct 2019 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 3 Jan 2022 | |
| Engineer's certificate, registration | Dated 3 Jan 2022 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹25.79 Cr 78.8%Development · ₹6.94 Cr 21.2%
| Estimated cost | ₹32.74 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹6.94 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Industrial Development Bank of India · SARAKKI LAKE | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BIAPPA) | Sanctioned 9 Dec 2021 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Industrial Development Bank of India · SARAKKI LAKE | |
Map of 2 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Sattva Vasanta Cove, price locked; Sattva Vasanta Skye, price locked.
| Aeropolis, A Project Of Sattva Group | about 3 km | Locked |
|---|
| Sattva Vasanta Cove | 3.7 km | Locked |
|---|
| Sattva Vasanta Skye | 3.8 km | Locked |
|---|
| Varnam Phase 1c | about 5 km | Locked |
|---|
| Godrej MSR City | 5.0 km | Locked |
|---|
| Birla Trimaya Phase-3 | 5.1 km | Locked |
|---|
| Barca II At Godrej Msr City | about 5 km | Locked |
|---|
| Ekta Elements | 5.3 km | Locked |
|---|
| Birla Trimaya | about 5.5 km | Locked |
|---|
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 0.5 km | 31 Dec 2027 | 100% (20 of 20) | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 3 km | 9 Jul 2026 | 95% (949 of 1,001) | Locked |
|---|
| Sattva Vasanta Cove | 3.7 km | 27 Dec 2030 | 14% (28 of 200) | Locked |
|---|
| Sattva Vasanta Skye | 3.8 km | 6 May 2031 | 28% (301 of 1,077) | Locked |
|---|
| Projects within 4 km, counted | 12 (9 with an approximate location) | |
|---|---|---|
| Flats in them | 3,661 | |
| Booked | 1,822 of 3,661 (50%) | |
| Unsold | 1,839 | |
| Booked a month, pooled | 31 flats | |
| Months to sell, pooled | 60 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 32.6 m
Across Devanahalli, the water table sat 19.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 10.2 m over the year.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 19.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (Village Panchayat, Kannamangala) | |
| Nearest city water main | 12.0 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 540 m to the north, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 4.3 km, Airport City | |
| Kempegowda Airport | 10.2 | 14 | 5.1 |
| MG Road (CBD) | 35.6 | 37 | 30.1 |
| Manyata Tech Park | 30.8 | 33 | 22.1 |
| ITPL, Whitefield | 45.7 | 43 | 28.5 |
| Ecospace, Bellandur ORR | 56.3 | 56 | 34.5 |
| Electronic City Ph 1 | 55.5 | 62 | 44.1 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | 790 m to the east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 2.5 km to the south |