Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 4 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 73 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Akruti ArkLapsed · completion date passed | Akruti Homes Bangalore Private Limited | Apartment | – | Jul 2024 |
| Arun ConstructionsCompleted (regulator flag) | ARUN CONSTRUCTIONS | Apartment | 854 sqft carpet (as filed) | Completed |
| Assetz Canvas & Cove - Phase 1 Wing A & BActive · 100% built | APG HABITAT PRIVATE LIMITED | Apartment | 266–820 sqft carpet (as filed) | Apr 2027 |
| Assetz Canvas & Cove 2.0 - Block AActive · 65% built | APG HABITAT PRIVATE LIMITED | Apartment | 298–1,143 sqft carpet (as filed) | Apr 2029 |
| Assetz Canvas & Cove 2.0 – Block B & CActive · 74% built | APG HABITAT PRIVATE LIMITED | Apartment | 277–1,141 sqft carpet (as filed) | Oct 2028 |
| Aswani SunshineLapsed · completion date passed | Aswani Properties India Pvt Ltd | Apartment | 377 sqft carpet (as filed) | Jul 2019 |
| Blossom ParkCompleted (regulator flag) | Elita Enterprises LLP | Plot | ~1,200 sqft (estimate: filed carpet plus 25%) | Completed |
| BrindavanLapsed · completion date passed | Sri Krishna Group | Apartment | 575 sqft carpet (as filed) | Dec 2024 |
8 of 64 other projects in Hosur Road, A to Z. Status is taken from each project's own filing.
All 70 projects in Hosur Road → · SNN Estates's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open SNN Estates Duomont in the interactive atlas
Transfer of the land
Sale deed
Survey [number withheld]
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commissioner, Bangalore District · Survey [number withheld]
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · BBMP · Survey [number withheld]
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDSOUTH/0051/24-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/240925/008118
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 5 Sep 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of the survey sketch. Filed with K-RERA: ADLR Sketch- Hongasandra- Sy No 49-3.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | [number withheld] | |
|---|---|---|
| Land extent, Sy [number withheld] | 9,327 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 9,326 sq m | |
| Khata | E Khatha · BBMP · 22 Apr 2025 | |
| Sale deed | Dated 31 May 1986 | |
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 2 Sep 2025 · No. BBMP/Addl.Dir/JDSOUTH/0051/24-25 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/477/2024 · issued 29 Jan 2025 · building height 49.95 m | Clear |
| Environmental clearance | SEIAA 43 CON 2024 · EC identification no. EC24C3801KA5320168N · issued 1 Feb 2025 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-343086 · issued 22 Apr 2024 · valid until 19 Apr 2029 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2030 |
| Land conversion | Converted 19 Jun 2023 · Deputy Commissioner, Bangalore District | |
|---|---|---|
| Survey numbers | [number withheld] |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
3BHK · avg 147 m² 49.1%4BHK · avg 191 m² 49.1%1BHK 1.8%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 1BHK | 2 | 1,216 |
| 3BHK | 56 | 88,372 |
| 4BHK | 56 | 1,14,862 |
| Sold, Q2 2026-27 | 23 / 114 | |
|---|---|---|
| Unsold, Q2 2026-27 | 91 | |
| Months to sell, derived from filed bookings | 75 months |
| Dhiraan Lotus | about 1 km | Locked | |
|---|---|---|---|
| Abhee Riviera Royale | about 1.5 km | Locked | |
| Mahindra NewHaven | 1.8 km | Locked | |
| Mahindra Zen | 1.8 km | Locked |
| SNN Estates Duomont This project | This project is the point the others are measured from | 31 Dec 2030 | 20% (23 of 114) | Not verified yet |
|---|---|---|---|---|
| Dhiraan Lotus | about 1 km | 31 Dec 2027 | 56% (20 of 36) | Locked |
| Abhee Riviera Royale | about 1.5 km | 28 Feb 2027 | 59% (57 of 96) | Locked |
| Mahindra NewHaven |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (general), at the filed pin | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 250 m, B.T.R GARDEN LAYOUT | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 210 m to the north-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 110 m to the west, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 2.01 (229 covered spaces for 114 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | 560 m | |
As the promoter reported it

| Main structure | Not started · planned by 1 Aug 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 1 Sep 2030 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 6% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 1 Sep 2030 | |
| RERA completion date | 31 Dec 2030 | |
| Work began, as filed | 5 Sep 2025 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 49.95 m on the fire NOC · 49.95 m filed, 4 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 51.19 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/477/2024 · issued 29 Jan 2025 · building height 49.95 m | |
| Environmental clearance | SEIAA 43 CON 2024 · EC identification no. EC24C3801KA5320168N · issued 1 Feb 2025 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹139.90 Cr 35.5%Development · ₹254.10 Cr 64.5%
| Estimated cost | ₹394.00 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (23) 20.2%Unsold (91) 79.8%
| Sold, Q3 2025-26 | 12 / 114 · 102 available | |
|---|---|---|
| Sold, Q4 2025-26 | 14 / 114 · 100 available | |
| Sold, Q1 2026-27 | 16 / 114 · 98 available | |
| Sold, Q2 2026-27 | 23 / 114 · 91 available | |
| Unsold, Q2 2026-27 | 91 | |
| Sold in Q4 2025-26 | 2 | |
| Sold in Q1 2026-27 | 2 | |
| Sold in Q2 2026-27 | 7 |
| Escrow bank | STATE BANK OF INDIA · SME BRANCH JAYANAGAR | |
|---|---|---|
| Designated account, collected | ₹3.67 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹3.95 Cr in Q2 2026-27 | |
| Amount withdrawable, Form 4 | ₹1,54,96,99,149 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 10 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 1 | Clear |
| Complaints filed against the promoter | 0 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 5 Sep 2025 | |
| Building plan (BBMP) | Sanctioned 2 Sep 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · SME BRANCH JAYANAGAR | |

Map of 7 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Mahindra NewHaven, price locked; Mahindra Zen, price locked; Assetz Canvas & Cove 2.0 - Block A, price locked; K&T's Sai Sannidhi, price locked; Assetz Mizumi Reserve Tower A1 A2 A4, price locked; Pacific Legacy, price locked; Azur Tower D, price locked.
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 2 km | Locked |
|---|
| Assetz Canvas & Cove 2.0 - Block A | 2.2 km | Locked |
|---|
| K&T's Sai Sannidhi | 2.2 km | Locked |
|---|
| Assetz Mizumi Reserve Tower A1 A2 A4 | 2.3 km | Locked |
|---|
| Azur Phase 2 | about 2.5 km | Locked |
|---|
| Pacific Legacy | 3.7 km | Locked |
|---|
| Azur Tower D | 3.9 km | Locked |
|---|
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 4 km | Locked |
|---|
| 1.8 km |
| 28 Dec 2029 |
| 89% (106 of 119) |
| Locked |
| Mahindra Zen | 1.8 km | 31 Dec 2028 | 100% (227 of 228) | Locked |
|---|
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 2 km | 30 Apr 2027 | 100% (272 of 273) | Locked |
|---|
| Assetz Canvas & Cove 2.0 - Block A | 2.2 km | 30 Apr 2029 | 98% (238 of 244) | Locked |
|---|
| Rent, 4BHK, 3 km | ₹96,000 /mo · 11 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹65,000 /mo · 181 listings | |
| Rent, 2BHK, 3 km | ₹35,000 /mo · 358 listings | |
| Rent, 1BHK, 3 km | ₹20,000 /mo · 184 listings | |
| Rent per sq ft, 3 km | ₹33.9 /mo, as listed · 314 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 39 (19 with an approximate location) | |
|---|---|---|
| Flats in them | 9,823 | |
| Booked | 6,124 of 9,823 (62%) | |
| Unsold | 3,699 | |
| Booked a month, pooled | 124 flats | |
| Months to sell, pooled | 29 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 210 m to the north-east, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 210 m, Kudlu Gate | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 45.3 | 50 | 35.3 |
| MG Road (CBD) | 11.0 | 18 | 10.6 |
| Manyata Tech Park | 21.6 | 28 | 17.6 |
| ITPL, Whitefield | 23.3 | 30 | 15.1 |
| Ecospace, Bellandur ORR | 10.7 | 17 | 6.0 |
| Electronic City Ph 1 | 9.1 | 11 | 6.8 |
| Landfill or waste transfer station | 1.0 km to the north-east, named Karnataka Compost Development Centre - KCDC on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | 500 m to the south, named Chikkabeguru Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | 1.1 km to the north-east, named Kudlu Crematorium on OpenStreetMap | |
| Prison | 2.7 km to the east, named Bangalore Central Jail on OpenStreetMap | |
| Electrical substation | 1.7 km to the north-east, named HSR Layout Substation on OpenStreetMap |