Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Aadya SereneExtended to 24-03-2028 | M/s. JUST NATURAL | Apartment | – | Mar 2028 |
| Akasha By Essem18Active · 32% built | Essem18 Developers Private Limited | Apartment | 592–1,229 sqft carpet (as filed) | May 2029 |
| Amigo AmparoExtended to 30-12-2026 | AMIGO PROPERTIES INDIA LLP | Apartment | 906–1,062 sqft carpet (as filed) | Dec 2026 |
| Antaliea HomesLapsed · completion date passed | VNG Developers | Apartment | 2,217 sqft carpet (as filed) | Jul 2019 |
| Aparna MapleCompleted · OC 21-04-2022 | Aparna Constructions And Estates Pvt Ltd | Apartment | 721 sqft carpet (as filed) | Completed |
| Assetz Zen & SatoActive · 60% built | APG TOWNSHIPS PRIVATE LIMITED | Apartment | 267–1,962 sqft carpet (as filed) | May 2030 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 15 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | 1 | – | – | Red flag |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Baldota SummitActive · 18% built | BALDOTA BUILDERS AND DEVELOPERS | Apartment | 976–986 sqft carpet (as filed) | Mar 2030 |
| Bhartiya City Nikoo Homes 1Completed (regulator flag) | Bhartiya City | Apartment | 620–2,800 sqft | Completed |
8 of 72 other projects in Thanisandra, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sri Balaji Signature in the interactive atlas
Approval or registration
Land use converted
SPECIAL DEPUTY COMMISIONER, BANGALORE DISTRICT · Survey 25/6
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · ASSISTANT REVENUE OFFICER, MAHADEVAPURA · Survey 25/6
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan 0444/21-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/260522/004922
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 25/6 | |
|---|---|---|
| Land extent, Sy 25/6 | 1 ACRE 30 1/2 GUNTAS | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 7,132 sq m | |
| Khata | A Khatha · ASSISTANT REVENUE OFFICER, MAHADEVAPURA · 17 Nov 2021 | |
| Building plan (BBMP) | Sanctioned 13 Dec 2021 · No. 0444/21-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 31 Jan 2022 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Jun 2024 |
| Land conversion | Converted 17 Dec 2002 · SPECIAL DEPUTY COMMISIONER, BANGALORE DISTRICT | |
|---|---|---|
| Survey numbers | 25/6 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Residential apartment of 2BHK · avg 81 m² 55%Residential apartment of 3BHK · avg 101 m² 45%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Residential apartment of 2BHK | 88 | 870 |
| Residential apartment of 3BHK | 72 | 1,083 |
| Brr North Excellency Phase I | about 0.5 km | Locked | |
|---|---|---|---|
| Lodha Mirabelle | about 1.5 km | Locked | |
| Mirabelle Phase 2 | about 1.5 km | Locked | |
| Sumadhura Solea | about 1.5 km | Locked | |
| Sumadhura Epitome | about 2 km |
| Sri Balaji Signature This project | This project is the point the others are measured from | 30 Jun 2024 | Not filed | Not verified yet |
|---|---|---|---|---|
| Brr North Excellency Phase I | about 0.5 km | 31 Dec 2029 | 33% (34 of 104) | Locked |
| Lodha Mirabelle | about 1.5 km | 30 Jun 2028 | 96% (418 of 437) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 0.5 km, Telecom layout, Ashwathnagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 1 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.00 (0 covered spaces for 160 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | Jun 2023 | |
|---|---|---|
| Schedule end | 31 Dec 2023 | |
| RERA completion date | 30 Jun 2024 | Red flag |
| Completion date, agreement | Jun 2023 | |
| Grace period for possession | 3 months | |
| Work began, as filed | 13 Dec 2021 |
| Structure | RCC framed structure | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC windows | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 8 Feb 2022 · site inspected 2 Feb 2022 | |
| Engineer's certificate, registration | Dated 8 Feb 2022 | |
Land · ₹2.00 Cr 4.5%Development · ₹42.08 Cr 95.5%
| Estimated cost | ₹44.08 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹44.08 Cr, same as the filing | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Axis Bank · Hennur Road | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Other phases under this promoter name | 263 | |
|---|---|---|
| With a filed extension or completion | 120 (86 completed, 34 extended) | |
| Average schedule slip | 10 months |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 13 Dec 2021 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · Hennur Road | |
| Locked |
| Vkk Grand | about 2 km | Locked |
|---|
| SOBHA Victoria Park Phase 1 | about 2.5 km | Locked |
|---|
| Nava Skanda Bellavita | about 2.5 km | Locked |
|---|
| Sobha City Athena | about 3 km | Locked |
|---|
| Sattva La Vita | about 3 km | Locked |
|---|
| Assetz Soho & Sky Phase 1b | about 3 km | Locked |
|---|
| The Pearl Paradise | about 3.5 km | Locked |
|---|
| Mirabelle Phase 2 |
|---|
| about 1.5 km |
| 31 May 2030 |
| 61% (173 of 284) |
| Locked |
| Sumadhura Solea | about 1.5 km | 30 Jun 2029 | 14% (32 of 233) | Locked |
|---|
| Sumadhura Epitome | about 2 km | 31 Dec 2027 | 58% (152 of 262) | Locked |
|---|
| Vkk Grand | about 2 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
|---|
| Projects within 4 km, counted | 51 (51 with an approximate location) | |
|---|---|---|
| Flats in them | 10,236 | |
| Booked | 5,963 of 10,236 (58%) | |
| Unsold | 4,273 | |
| Booked a month, pooled | 133 flats | |
| Months to sell, pooled | 32 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 2 km, Nagawara | |
| Kempegowda Airport | 25 | 18 |
| MG Road (CBD) | 11.5 | 9.5 |
| Manyata Tech Park | 4 | 2 |
| ITPL, Whitefield | 19 | 13 |
| Ecospace, Bellandur ORR | 24 | 15 |
| Electronic City Ph 1 | 33 | 24 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |