| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 5 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
| Aeropolis, A Project Of Sattva GroupLapsed · completion date passed | TRINAYANI REALTOR PRIVATE LIMITED |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 64 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Apartment |
| 280–635 sqft carpet (as filed) |
| Jul 2026 |
| Aira HillsApplied for completion 17/02/2026 | Vaarahi Developers Pvt Ltd | Plot | – | Dec 2024 |
| Ajmal Flora Valley Phase -IIApplied for completion 01/10/2024 | M/s. Ajmal Flora Valley | Plot | ~2,140 sqft (estimate: filed carpet plus 25%) | May 2017 |
8 of 252 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Surya Serene Skyline in the interactive atlas
Approval or registration
Land use converted
Deputy Commissioner · Survey 48/1
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 48/1
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Anneshwara Grama Panchayath · Survey 48/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BIAPPA · plan BIAAP/TP/CC/325/2024-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/303/PR/090525/007731
K-RERA registration
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 21 Mar 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | Aditya Birla Housing Finance Ltd · ₹30.00 Cr disbursed | |
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey , 1 page, not in English.
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 13,139 sq m | |
| Extent the filed land schedule names for these survey numbers | 8,195 sq m | |
| Plot area against the filed extent | 1.6 times | |
| Land area filed with K-RERA | 7,515 sq m | |
| Village, hobli and taluk on the KGIS map | Chikkasanne, Kasaba hobli, Devanahalli taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Survey numbers | 48/1 | |
|---|---|---|
| Land extent, Sy 48/1 | 2 Acre- 01 Gunta | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 7,515 sq m | |
| Khata | E Khatha · Anneshwara Grama Panchayath · 16 Nov 2024 | |
| Sale deed | Dated 8 Nov 2005 | |
| Survey | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|
| Sy. No. 48/1 | 1 | 2 acres 1 gunta | 2 acres 1 gunta | Differs: 1 acre 9 guntas apart | 0 |
Valid as of this reportValidity ended
| Building plan (BIAPPA) | Sanctioned 19 Mar 2025 · No. BIAAP/TP/CC/325/2024-25 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/411/2024 · issued 19 Dec 2024 | Clear |
| Environmental clearance | SEIAA 177 CON 2024 · EC identification no. EC24C3801KA5544057N · issued 28 Jan 2025 | Clear |
| Airport height NOC | valid until 31 Jul 2032 | Clear |
| Pollution board (CFE) | consent order CTE-344877 · issued 27 Aug 2024 · valid until 30 Jul 2029 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2028 |
| Land conversion | Converted 29 Apr 2005 · Deputy Commissioner | |
|---|---|---|
| Survey numbers | 48/1 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
2 BHK & 3 BHK Units · avg 79 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2 BHK & 3 BHK Units | 117 | 850 |
| Sold, Q2 2026-27 | 17 / 117 | |
|---|---|---|
| Unsold, Q2 2026-27 | 100 | |
| Months to sell, derived from filed bookings | 180 months |
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 1.5 km | Locked | |
|---|---|---|---|
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 1.5 km | Locked | |
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 1.5 km | Locked | |
| Aeropolis, A Project Of Sattva Group | about 3 km | Locked |
| Surya Serene Skyline This project | This project is the point the others are measured from | 31 Dec 2028 | 15% (17 of 117) | Not verified yet |
|---|---|---|---|---|
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 1.5 km | 31 Dec 2026 | 100% (30 of 30) | Locked |
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 1.5 km | 30 Jun 2027 | 100% (30 of 30) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 17 km, Shankrappa Layout, MAruthi nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.61 (188 covered spaces for 117 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 32.6 m
Across Devanahalli, the water table sat 19.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 10.2 m over the year.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 19.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
As the promoter reported itPossession date in the agreement

| Main structure | Not started · planned by 31 Dec 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Dec 2028 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 44% | |
| Completion, accountant | 43.5% of the estimated cost spent | |
| Possession, agreement | 31 Dec 2028 | |
|---|---|---|
| Schedule end | 31 Dec 2028 | |
| RERA completion date | 31 Dec 2028 | |
| Work began, as filed | 19 Mar 2025 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 45 m filed, 2 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 10 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Mar 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/411/2024 · issued 19 Dec 2024 | |
| Environmental clearance | SEIAA 177 CON 2024 · EC identification no. EC24C3801KA5544057N · issued 28 Jan 2025 | |
| Architect, quarterly | Form 5 · Mar 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 20 Mar 2025 · site inspected 15 Mar 2025 | |
| Engineer's certificate, registration | Dated 28 Mar 2025 | |
| Chartered accountant's certificate, registration | Dated 13 Jan 2025 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹81.0 L 2.5%Development · ₹31.00 Cr 97.5%
| Estimated cost | ₹31.81 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹15.50 Cr | |
| Estimated cost, engineer's certificate | ₹31.00 Cr | |
| Estimated cost, Form 4 Q1 2026-27 | ₹44.01 Cr | |
| Cost incurred | ₹19.13 Cr (43.5% of the estimate) | |
| Cost left | ₹24.88 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹20.89 Cr | |
| Land cost revision | Not verified yet | |
Sold (17) 14.5%Unsold (100) 85.5%
| Sold, Q3 2025-26 | 12 / 117 · 105 available | |
|---|---|---|
| Sold, Q4 2025-26 | 17 / 117 · 100 available | |
| Sold, Q1 2026-27 | 17 / 117 · 100 available | |
| Sold, Q2 2026-27 | 17 / 117 · 100 available | |
| Unsold, Q2 2026-27 | 100 | |
| Sold in Q4 2025-26 | 5 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | HDFC · Whitefield Main Road Branch | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹37.6 L in Q2 2026-27 | |
| Withdrawn from the escrow account to date | ₹34,39,576 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | Aditya Birla Housing Finance Ltd · ₹30.00 Cr disbursed | |
|---|---|---|
| Records searched to | 21 Mar 2025 | |
| Building plan (BIAPPA) | Sanctioned 19 Mar 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · Whitefield Main Road Branch | |

| Sattva Vasanta Cove | about 4.5 km | Locked |
|---|
| Sattva Vasanta Skye | about 4.5 km | Locked |
|---|
| Varnam Phase 1c | about 5 km | Locked |
|---|
| Birla Trimaya Phase-3 | about 5 km | Locked |
|---|
| Birla Trimaya | about 5 km | Locked |
|---|
| Ekta Elements | about 5.5 km | Locked |
|---|
| Birla Trimaya Phase-2 | about 5.5 km | Locked |
|---|
| Godrej MSR City | about 5.5 km | Locked |
|---|
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 1.5 km | 31 Dec 2027 | 100% (20 of 20) | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 3 km | 9 Jul 2026 | 95% (949 of 1,001) | Locked |
|---|
| Sattva Vasanta Cove | about 4.5 km | 27 Dec 2030 | 14% (28 of 200) | Locked |
|---|
| Sattva Vasanta Skye | about 4.5 km | 6 May 2031 | 28% (301 of 1,077) | Locked |
|---|
| Projects within 4 km, counted | 16 (16 with an approximate location) | |
|---|---|---|
| Flats in them | 4,735 | |
| Booked | 3,537 of 4,735 (75%) | |
| Unsold | 1,198 | |
| Booked a month, pooled | 56 flats | |
| Months to sell, pooled | 21 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 3.5 km, Airport City | |
| Kempegowda Airport | 8 | 4 |
| MG Road (CBD) | 33.5 | 30 |
| Manyata Tech Park | 28.5 | 22 |
| ITPL, Whitefield | 43.5 | 27.5 |
| Ecospace, Bellandur ORR | 54 | 34 |
| Electronic City Ph 1 | 53 | 43.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 0.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km |