Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | 1 | 2 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | |
Part of the full report. Unlock all 3 sections
| 4square Park SierraActive · 29% built | 4SQUARE ESTATES | Apartment | 1,083 sqft carpet (as filed) | Dec 2029 |
| Adithya TranquilLapsed · completion date passed | ADITHYA DEVELOPERS | Apartment | – | Jan 2023 |
| Affinity GardeniaActive · 95% built | AFFINITY PROPERTIES LLP | Apartment | 682–853 sqft carpet (as filed) | Dec 2026 |
| After the RainCompleted · OC 30-04-2022 | Total Environment | Villa | 3,184–5,182 sqft | Completed |
| After the Rain - Phase II ACompleted · OC 10-01-2024 | Total Environment Building Systems Private Limited | Mixed development | 290–2,669 sqft carpet (as filed) | Completed |
| After the Rain Phase IIIActive · 3% built | TOTAL ENVIRONMENT BUILDING SYSTEMS PVT LTD | Apartment |
Title & ownership
Approvals
Disputes & cases
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 50 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | 1 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | 1 | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 2,643–6,964 sqft carpet (as filed) |
| Apr 2032 |
| After The Rain-Phase IibLapsed · completion date passed | Total Environment Building Systems Private Limited | Apartment | – | Aug 2026 |
| After the Rain-Phase IicActive · 48% built | Total Environment Building Systems Private limited | Villa | 3,535 sqft carpet (as filed) | Apr 2028 |
8 of 120 other projects in Yelahanka, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Tnm Lakeview in the interactive atlas
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 18 Nov 2023 · No. BBMP/AD.COM/YLK/0747/2023-34 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-125625 · issued 19 Dec 2023 · valid until 18 Dec 2028 | Clear |
| Water and sewerage NOC (BWSSB) | issued 22 Feb 2024 |
| RERA extensions | Granted · Approved 9 Dec 2025 | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Oct 2026 |
| Land conversion | Converted 3 Mar 2023 · BANGALORE DC OFFICE | |
|---|---|---|
| Survey numbers | 135/*/5 |
| Due on signing | Not verified yet | |
|---|---|---|
| Due within 15 days | Not verified yet | |
| Each construction stage | Not verified yet | |
| Floors in payment plan | Not verified yet | |
| Late-payment interest | Rate prescribed in the Rules | |
| Interest the builder pays on late possession | Rate prescribed in the Rules | |
₹99 for this report opens Valuation, Title & ownership and Disputes & cases for this project, yours to read for good.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 2.5 km, Shankrappa Layout, MAruthi nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | Review |
| Electricity, built | 0% | |
| Swimming Pool, built | 0% | |
| Power Backup, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.53 (55 covered spaces for 36 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported itPossession date in the agreement

| Main structure | 100% · planned by 30 Aug 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 70% · planned by 2 Aug 2025 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 31 Aug 2025 | |
|---|---|---|
| Schedule end | 2 Aug 2025 | |
| RERA completion date | 31 Oct 2026 | |
| Work began, as filed | 1 Jan 2024 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 11.49 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 30 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, May 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jan 2026, May 2026, Jul 2026, Oct 2026 (4 filed) | |
| Engineer's certificate, registration | Dated 18 Jan 2024 | |
| Chartered accountant's certificate, registration | Dated 19 Jan 2024 | |
| Chartered accountant, Form 4 | Dated 7 Jul 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹6.00 Cr 37.5%Development · ₹10.01 Cr 62.5%
| Estimated cost | ₹16.01 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹9.52 Cr | |
| Estimated cost, chartered accountant's certificate | ₹16.01 Cr, same as the filing | |
| Estimated cost, Form 4 Q1 2026-27 | ₹10.01 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (36) 100%
| Sold, Q3 2025-26 | 20 / 36 · 16 available | |
|---|---|---|
| Sold, Q4 2025-26 | 2 / 36 · 34 available | |
| Sold, Q1 2026-27 | 28 / 36 · 8 available | |
| Sold, Q2 2026-27 | 36 / 36 · 0 available | |
| Unsold, Q2 2026-27 | 0 | |
| Sold in Q4 2025-26 | 18 bookings cancelled or corrected (20 → 2 sold) | |
| Sold in Q1 2026-27 | 26 | |
| Sold in Q2 2026-27 | 8 |
| Escrow bank | STATE BANK OF INDIA · MG ROAD | |
|---|---|---|
| Designated account, collected | ₹7.0 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹7.0 L in Q2 2026-27 | |
| Net amount withdrawable, Form 4 | ₹2,11,62,576 | |
| Escrow account, Q1 2026-27 | Opened at ₹15.3 L, ₹1.10 Cr withdrawn | |
| Escrow account to date, Q1 2026-27 | ₹7.23 Cr deposited from sales, ₹7.16 Cr withdrawn | |
| Share of collections deposited in escrow | 70% | |
| Sale proceeds realised, Q1 2026-27 | ₹1,44,63,500 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 18 Nov 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · MG ROAD | |

Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 1 km, Bagalur Cross | |
| Kempegowda Airport | 18.5 | 12.5 |
| MG Road (CBD) | 19 | 16.5 |
| Manyata Tech Park | 11.5 | 8.5 |
| ITPL, Whitefield | 27.5 | 19.5 |
| Ecospace, Bellandur ORR | 32.5 | 22.5 |
| Electronic City Ph 1 | 39 | 32 |
| Landfill or waste transfer station | about 2 km | |
|---|---|---|
| Sewage treatment plant | about 3 km to the south-west | |
| Quarry | about 1.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Hinduja Ecopolis Substation on OpenStreetMap |