Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
| Aeropolis, A Project Of Sattva GroupLapsed · completion date passed | TRINAYANI REALTOR PRIVATE LIMITED |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 18 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | 1 | – | Review |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Apartment |
| 280–635 sqft carpet (as filed) |
| Jul 2026 |
| Aira HillsApplied for completion 17/02/2026 | Vaarahi Developers Pvt Ltd | Plot | – | Dec 2024 |
| Ajmal Flora Valley Phase -IIApplied for completion 01/10/2024 | M/s. Ajmal Flora Valley | Plot | ~2,140 sqft (estimate: filed carpet plus 25%) | May 2017 |
8 of 252 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Under The Sun – Luxury Villa Lifestyle By Fortius in the interactive atlas
Approval or registration
Land use converted
District Magistrate Bangalore Rural · Survey 64/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Local Planning Authority · plan STRRPA/TP/LAO/11/2017-18
K-RERA filing, approvals
Approval or registration
Khata issued
E Khatha · Panchayati Raj and Gramina Ilake · Survey 64/2
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1250/303/PR/270922/005276
K-RERA registration
Approval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 2 Jul 2022 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Page 1
Page 1 of 3 of the survey sketch. Filed with K-RERA: Hissa Phody and Survey Sketch, 3 pages.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 64/2 | |
|---|---|---|
| Land extent, Sy 64/2 | 7 Acre, 24 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Khata | E Khatha · Panchayati Raj and Gramina Ilake · 24 Mar 2022 | |
| Building plan (Local Planning Authority) | Sanctioned 8 Aug 2018 · No. STRRPA/TP/LAO/11/2017-18 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Sep 2026 |
| Land conversion | Converted 26 Feb 2018 · District Magistrate Bangalore Rural | |
|---|---|---|
| Survey numbers | 64/2 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 0.5 km | Locked | |
|---|---|---|---|
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 0.5 km | Locked | |
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 0.5 km | Locked | |
| Aeropolis, A Project Of Sattva Group | about 3 km | Locked |
| Under The Sun – Luxury Villa Lifestyle By Fortius This project | This project is the point the others are measured from | 30 Sep 2026 | Not filed | Not verified yet |
|---|---|---|---|---|
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 0.5 km | 31 Dec 2026 | 100% (30 of 30) | Locked |
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 0.5 km | 30 Jun 2027 | 100% (30 of 30) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 16.5 km, Shankrappa Layout, MAruthi nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Across Devanahalli, the water table sat 19.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 10.2 m over the year.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 19.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | 30 Sep 2026 | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 30 Sep 2026 | Review |
| Grace period for possession | 6 months | |
| Work began, as filed | 1 Oct 2022 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Site inspected 18 Mar 2022 | |
| Engineer's certificate, registration | Dated 16 Aug 2022 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹5.52 Cr 83.6%Development · ₹1.08 Cr 16.4%
| Estimated cost | ₹6.60 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹15.77 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | KOTAK MAHINDRA BANK · Infantry Road | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 2 Jul 2022 | Review |
| Building plan | Sanctioned 8 Aug 2018 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | KOTAK MAHINDRA BANK · Infantry Road | |
| Sattva Vasanta Cove | about 4 km | Locked |
|---|
| Sattva Vasanta Skye | about 4 km | Locked |
|---|
| Varnam Phase 1c | about 5 km | Locked |
|---|
| Godrej MSR City | about 5 km | Locked |
|---|
| Birla Trimaya Phase-3 | about 5 km | Locked |
|---|
| Barca II At Godrej Msr City | about 5.5 km | Locked |
|---|
| Ekta Elements | about 5.5 km | Locked |
|---|
| Birla Trimaya | about 5.5 km | Locked |
|---|
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 0.5 km | 31 Dec 2027 | 100% (20 of 20) | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 3 km | 9 Jul 2026 | 95% (949 of 1,001) | Locked |
|---|
| Sattva Vasanta Cove | about 4 km | 27 Dec 2030 | 14% (28 of 200) | Locked |
|---|
| Sattva Vasanta Skye | about 4 km | 6 May 2031 | 28% (301 of 1,077) | Locked |
|---|
| Projects within 4 km, counted | 12 (12 with an approximate location) | |
|---|---|---|
| Flats in them | 3,661 | |
| Booked | 1,822 of 3,661 (50%) | |
| Unsold | 1,839 | |
| Booked a month, pooled | 31 flats | |
| Months to sell, pooled | 60 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 4.5 km, Airport City | |
| Kempegowda Airport | 10.5 | 5 |
| MG Road (CBD) | 35.5 | 30 |
| Manyata Tech Park | 31 | 22 |
| ITPL, Whitefield | 46 | 28.5 |
| Ecospace, Bellandur ORR | 56.5 | 34.5 |
| Electronic City Ph 1 | 55.5 | 44 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 1 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the south |