Overview
Aratt Avant Twilight - Phase I
Part ofAratt Avant Twilight2 phases, 255 flats
Overview
Part ofAratt Avant Twilight2 phases, 255 flats
Overview
Part ofAratt Avant Twilight2 phases, 255 flats

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 56 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | 1 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | 1 | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adarsh ParadiseActive · 87% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
| Adithya RicaCompleted (regulator flag) | ADITHYA CONSTRUCTIONS | Apartment | 769 sqft carpet (as filed) | Completed |
8 of 264 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aratt Avant Twilight - Phase I in the interactive atlas
Approval or registration
Land use converted
DC · Survey 59/2
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of Arattukulam Infrastructure Constructions Private Limited · Survey 59/2
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Manduru Grama Panchayat · Survey 59/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BMRDA · plan CC/115/2023-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/301223/006522
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | ICICI bank · ₹14.00 Cr disbursed | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 59/2 | |
|---|---|---|
| Land extent, Sy 59/2 | 01 Acre 12 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 5,261 sq m | |
| Khata | E Khatha · Manduru Grama Panchayat · 1 Apr 2023 | |
| Sale deed | Dated 10 Nov 2022 | |
| Sale deed in favour of | Arattukulam Infrastructure Constructions Private Limited | |
| Building plan (BMRDA) | Sanctioned 25 May 2023 · No. CC/115/2023-24 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Jan 2028 |
| Land conversion | Converted 13 Sep 2022 · DC | |
|---|---|---|
| Survey numbers | 59/2 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
Residential Apartments · avg 80 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Residential Apartments | 93 | 858 |
| Sold, Q2 2026-27 | 76 / 93 | |
|---|---|---|
| Unsold, Q2 2026-27 | 17 | |
| Months to sell, derived from filed bookings | 6 months |
| Godrej Woodscapes | about 1.5 km | Locked | |
|---|---|---|---|
| Sattva Songbird | about 1.5 km | Locked | |
| One Residences At Sobha One World Ph4 W7 And 8 | about 2 km | Locked | |
| One Residences At Sobha One World Ph5 W9,10,11 | about 2 km | Locked |
| Aratt Avant Twilight - Phase I This project | This project is the point the others are measured from | 31 Jan 2028 | 82% (76 of 93) | Not verified yet |
|---|---|---|---|---|
| Godrej Woodscapes | about 1.5 km | 31 Jan 2029 | 100% (2,165 of 2,168) | Locked |
| Sattva Songbird | about 1.5 km | 6 May 2029 | 51% (704 of 1,379) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 6 km, TRIVENI NAGAR NEAR KR PURAM | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 1.5 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | Review |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.00 (93 covered spaces for 93 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | 95% · planned by 31 Jan 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 30 Jun 2027 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 89% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Dec 2027 | |
| RERA completion date | 31 Jan 2028 | |
| Work began, as filed | 1 Feb 2024 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 30 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹6.47 Cr 12.3%Development · ₹46.04 Cr 87.7%
| Estimated cost | ₹52.51 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | ₹13.80 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (76) 81.7%Unsold (17) 18.3%
| Sold, Q3 2025-26 | 50 / 93 · 43 available | |
|---|---|---|
| Sold, Q4 2025-26 | 53 / 93 · 40 available | |
| Sold, Q1 2026-27 | 66 / 93 · 27 available | |
| Sold, Q2 2026-27 | 76 / 93 · 17 available | |
| Unsold, Q2 2026-27 | 17 | |
| Sold in Q4 2025-26 | 3 | |
| Sold in Q1 2026-27 | 13 | |
| Sold in Q2 2026-27 | 10 | |
| Flats booked, Form 4 Q4 2025-26 | 53 |
| Escrow bank | ICICI Bank · ULSOOR ROAD | |
|---|---|---|
| Designated account, collected | ₹9.26 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹6.68 Cr in Q2 2026-27 (72% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹6,44,13,923 | |
| Escrow account, Q4 2025-26 | Opened at ₹65.8 L, ₹3.36 Cr deposited from sales, ₹33,762 other deposits, ₹4.02 Cr withdrawn | |
| Withdrawn from the escrow account to date | ₹32,26,79,950 | |
| Share of collections deposited in escrow | 100% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | ICICI bank · ₹14.00 Cr disbursed | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BMRDA) | Sanctioned 25 May 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · ULSOOR ROAD | |

| One Residences At Sobha One World Ph6 W12,13,14 | about 2 km | Locked |
|---|
| Neighbourhood Tree Park | about 2 km | Locked |
|---|
| Chaithanya Sankhya | about 2.5 km | Locked |
|---|
| Definer Upper Deck | about 3 km | Locked |
|---|
| Godrej Parkshire (Hoskote) | about 3.5 km | Locked |
|---|
| Assetz Bloom & Dell - Phase 2 | about 4 km | Locked |
|---|
| Riqueza Siri | about 5 km | Locked |
|---|
| Sowparnika Euphoria in the East | about 5 km | Locked |
|---|
| One Residences At Sobha One World Ph4 W7 And 8 |
|---|
| about 2 km |
| 30 Sep 2033 |
| 22% (98 of 440) |
| Locked |
| One Residences At Sobha One World Ph5 W9,10,11 | about 2 km | 28 Feb 2033 | 62% (449 of 721) | Locked |
|---|
| One Residences At Sobha One World Ph6 W12,13,14 | about 2 km | 31 Aug 2032 | 63% (452 of 721) | Locked |
|---|
| Neighbourhood Tree Park | about 2 km | 31 Dec 2028 | 27% (25 of 93) | Locked |
|---|
| Projects within 4 km, counted | 45 (45 with an approximate location) | |
|---|---|---|
| Flats in them | 15,815 | |
| Booked | 8,768 of 15,815 (55%) | |
| Unsold | 7,047 | |
| Booked a month, pooled | 277 flats | |
| Months to sell, pooled | 25 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Manduru Grama Panchayat) | |
| Nearest city water main | Not verified yet | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 1.5 km, Dakshina Pinakini, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 7.5 km, Whitefield | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 26.5 | 16.5 |
| MG Road (CBD) | 23 | 19.5 |
| Manyata Tech Park | 22.5 | 15 |
| ITPL, Whitefield | 12 | 8.5 |
| Ecospace, Bellandur ORR | 22.5 | 17 |
| Electronic City Ph 1 | 38 | 26 |
| Landfill or waste transfer station | about 2.5 km to the west, named Cheemasandra BBMP Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 0.5 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the south, named Kondaspura on OpenStreetMap |