Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | 1 | – | 2 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | |
Part of the full report. Unlock all 2 sections
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 52 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Akira Apartment (Nanjundeshwara Enclave)Lapsed · completion date passed | S V CONSULTANTS AND ENGINEERS | Apartment | – | Dec 2020 |
| Akshaya EnclaveRegistered · no quarterly update yet | AKSHAYA BUILDERS | Apartment | 646–1,084 sqft carpet (as filed) | Dec 2027 |
| Anika Redwood HomesWithdrawn | Anika Developers | Mixed development | 918 sqft carpet (as filed) | Dec 2019 |
| Anika Redwood HomesCompleted · OC 13-01-2022 | Anika Developers | Apartment | – | Completed |
| Atri NestLapsed · completion date passed | A3 Developers | Apartment | 617 sqft carpet (as filed) | Mar 2023 |
| Ds Max SplendidCompleted · OC 20-12-2018 | DS MAX PROPERTIES PVT LTD | Apartment | – | Completed |
| Govianu NakshathraCompleted · OC 29-07-2025 | Mahesh Govindaraju | Apartment | 858 sqft carpet (as filed) | Completed |
| Kbr Navarathna ResidencyCompleted · OC 14-08-2023 | KBR Homes India Private Limited | Apartment | 741–844 sqft carpet (as filed) | Completed |
8 of 43 other projects in Magadi Road, A to Z. Status is taken from each project's own filing.
All 47 projects in Magadi Road → · Birla Estates's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Birla Tisya in the interactive atlas
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Area on the KGIS map | Not verified yet | |
|---|---|---|
| Land area of this registration | 19,121 sq m | |
| Title deed | Executed 2 Dec 2019 | |
| Joint development agreement number | 3074 of Book 1, 2020-21 | |
|---|---|---|
| Landowner share | Not verified yet | |
| Developer share | Not verified yet | |
| Sale deed signed by | Not verified yet | |
| Building plan (BDA) | Not verified yet | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/232/2020 · issued 7 Nov 2020 · building height 102 m | Clear |
| Environmental clearance | SEIAA 79 CON 2020 · issued 31 Aug 2020 | Clear |
| Airport height NOC | NOC ID BIAL/SOUTH/B/091020/479936 · permissible top elevation 1012.25 m above mean sea level | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 1 | |
| RERA completion date | 31 Dec 2026 |
₹99 for this report opens Valuation and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Valuation and Disputes & cases for this project, yours to read for good.
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (general) | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 870 m, Sanguruvanahalli | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 60 m to the north-east, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 970 m to the north-east, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
| Club House, built | 75% | |
|---|---|---|
| Electricity, built | 50% | |
| Swimming Pool, built | 100% | |
| Power Backup, built | 100% | |
| Kitchen handover | Not verified yet | |
| Sewage plant | Not verified yet | |
| Power backup | Not verified yet | |
Ten-year July mean for this taluk: 26.8 m
Across Bengaluru North, the water table sat 22.7 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 26.8 m, and it fell 4.9 m over the year.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.7 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Self development | |
| Nearest city water main | 290 m | |
As the promoter reported it

| Main structure | 100% · planned by 18 Mar 2025 | |
|---|---|---|
| Electrical and plumbing finishing | 70% · planned by 15 Oct 2026 | |
| Internal roads | Not verified yet | |
| Club house | 75% | |
| Completion | 100% | |
| Completion, accountant | 99% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 28 Nov 2026 | |
| RERA completion date | 31 Dec 2026 | |
| Work began, as filed | 1 Jan 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 102 m on the fire NOC | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/232/2020 · issued 7 Nov 2020 · building height 102 m | |
| Environmental clearance | SEIAA 79 CON 2020 · issued 31 Aug 2020 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹228.00 Cr 40.9%Development · ₹330.00 Cr 59.1%
| Estimated cost | ₹558.00 Cr | |
|---|---|---|
| Estimated cost, Form 4 Q1 2026-27 | ₹543.02 Cr | |
| Cost incurred | ₹537.68 Cr (99% of the estimate) | |
| Cost left | ₹5.34 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹161.65 Cr | |
| Land cost revision | Not verified yet | |
Sold (392) 100%
| Sold, Q3 2025-26 | 392 / 392 · 0 available | |
|---|---|---|
| Sold, Q4 2025-26 | 392 / 392 · 0 available | |
| Sold, Q1 2026-27 | 392 / 392 · 0 available | |
| Sold, Q2 2026-27 | 392 / 392 · 0 available | |
| Unsold, Q2 2026-27 | 0 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | KOTAK MAHINDRA BANK · 1ST PHASE PEENYA | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 | |
| Net amount withdrawable, Form 4 | ₹1,41,93,95,326 | |
| Withdrawn from the escrow account to date | ₹3,95,74,51,657 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 1 | |
| K-RERA registrations under this promoter | 8 | |
|---|---|---|
| Marked completed | 1 | |
| Past promised date, not completed | 0 | |
| Complaints filed against the promoter | 1 |
| Developer's project loan |
|---|
| Not verified yet |
| Records searched to | Not verified yet | |
|---|---|---|
| Building plan | Not verified yet | |
|---|---|---|
| Unregistered agreements, over 10% paid | Not verified yet | |
|---|---|---|
| Sale deed in favour of | Not verified yet | |
|---|---|---|
| Escrow bank | KOTAK MAHINDRA BANK · 1ST PHASE PEENYA |
|---|

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 60 m to the north-east, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 1.4 km, Sri Balagangadharanatha Swamiji Stn., Hoshahalli | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 39.0 | 41 | 30.1 |
| MG Road (CBD) | 9.7 | 12 | 7.0 |
| Manyata Tech Park | 16.5 | 20 | 11.3 |
| ITPL, Whitefield | 27.0 | 30 | 21.6 |
| Ecospace, Bellandur ORR | 21.5 | 28 | 16.8 |
| Electronic City Ph 1 | 25.8 | 32 | 22.1 |
| Landfill or waste transfer station | 2.1 km to the south | |
|---|---|---|
| Sewage treatment plant | 2.8 km to the east | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 370 m to the south, named Vijaya Nagar on OpenStreetMap |