Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 28 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | 1 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 77 SkyWithdrawn | DivyaSree Infrastruture Projects Private Limited | Mixed development | – | Dec 2018 |
| Century RegaliaActive · 74% built | Century Real Estate | Apartment | 2,375–4,780 sqft | Apr 2029 |
| Century Regalia (Project 2)Active · 32% built | Suruchi Properties Private Limited | Apartment | 1,266–2,153 sqft carpet (as filed) | Feb 2030 |
| Chick Cottage ResidencesLapsed · completion date passed | Tree of Life Dwellings LLP | Apartment | – | Aug 2020 |
| Construction Of 336 (G+3) Houses At ShanthinagarRegistered · no quarterly update yet | karnataka slum development board | Apartment | 323 sqft carpet (as filed) | Oct 2026 |
| Diamond District | India Builders Corporation (IBC) | Apartment | 1,150–3,000 sqft | – |
| DivyaSree 77 East | DivyaSree Developers | Villa | 5,851–6,154 sqft | – |
| DivyaSree 77 Place | DivyaSree Developers | Apartment | 1,901–5,055 sqft | – |
8 of 20 other projects in Old Airport Road, A to Z. Status is taken from each project's own filing.
All 21 projects in Old Airport Road → · DivyaSree Developers's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open DivyaSree 77 Life in the interactive atlas
Covers 157/2, 157/3A only
Approval or registration
Land use converted
Special DC, Bengaluru · Survey 157/2, 157/3A, 159/1B
K-RERA filing, land schedule
Approval or registration
Land use converted
Special DC, Bengaluru · Survey 157/2, 157/3A, 159/1B
K-RERA filing, land schedule
Covers 157/3B only
Approval or registration
Land use converted
Special DC, Bengaluru · Survey 157/3B
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of DivyaSree Infrastructure Projects Private Limited · Survey 157/2, 157/3B, 157/3A, 159/1B
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of DivyaSree Infrastructure Projects Private Limited · Survey 157/2, 157/3B, 157/3A, 159/1B
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Sy 5/3; 5; 6/1; 6, Mandalakunte village, Yelahanaka hobli, Bangalore North taluk
Title deed filed with K-RERA, pp. 1, 28 · See it in Documents
Approval or registration
Khata issued
A Khatha · Maratahalli, Bengaluru · Survey 157/2, 157/3B, 157/3A, 159/1B
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Maratahalli, Bengaluru · Survey 157/2, 157/3B, 157/3A, 159/1B
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan JTDP/LP/64/2010-11
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/211222/005551
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | IndusInd Bank Limited · ₹40.00 Cr disbursed | |
| Mortgage on the project land | Declared by the promoter | Review |
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Encumbrance -157-3B.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 157/2, 157/3b, 157/3a, 159/1b | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 9,172 sq m | |
| Khata | A Khatha · Maratahalli, Bengaluru · 31 Mar 2017 | |
| Sale deed | Dated 12 Sep 2012 | |
| Sale deed in favour of | DivyaSree Infrastructure Projects Private Limited | |
| Building plan (BBMP) | Sanctioned 27 Apr 2022 · No. JTDP/LP/64/2010-11 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/137/2025 · issued 17 Jun 2025 · building height 90.94 m | Clear |
| Environmental clearance | SEIAA 141 CON 2025 · EC identification no. EC25C3801KA5657522N · issued 9 Jul 2025 | Clear |
| Airport height NOC | NOC ID BIAL/SOUTH/B/091124/1221831 | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2025 |
| Land conversion | 4 of 4 parcels converted | |
|---|---|---|
| Sy 157/2, 157/3a, 159/1b | Converted 9 May 2003 · Special DC, Bengaluru | |
| Sy 157/3b | Converted 24 Feb 2005 · Special DC, Bengaluru | |
| Survey numbers | 157/2 · 157/3b · 157/3a · 159/1b |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
| Transfer fee | Not verified yet | |
|---|---|---|
| Holding charge | Not verified yet | |
| Maintenance included | Not verified yet | |
| Defect liability | 5 years | |
3BHK · avg 193 m² 61.7%4BHK · avg 240 m² 33.1%Ews 1BHK 5.3%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 3BHK | 82 | 1,70,167 |
| 4BHK | 44 | 1,13,527 |
| Ews 1BHK | 7 | 3,068 |
| Sold, Q3 2025-26 | 121 / 133 | |
|---|---|---|
| Unsold, Q3 2025-26 | 12 |
| Adarsh Parkland | 2.0 km | Locked | |
|---|---|---|---|
| SOBHA Neopolis | 2.9 km | Locked | |
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 3 km | Locked | |
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 3 km | Locked |
| DivyaSree 77 Life This project | This project is the point the others are measured from | 31 Dec 2025 | 91% (121 of 133) | Not verified yet |
|---|---|---|---|---|
| Adarsh Parkland | 2.0 km | Not on the filing | Not filed | Locked |
| SOBHA Neopolis | 2.9 km | 31 Dec 2028 | 95% (570 of 600) | Locked |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | 77% Residential (main), 23% Valley / drain buffer | Review |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 750 m, Deepa nursing home | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 80 m to the west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 130 m to the north-west, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 100% | |
| Swimming Pool, built | 100% | |
| Parks, built | 100% | |
| Piped Gas, built | 100% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.00 (133 covered spaces for 133 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |

| Main structure | 100% · planned by 18 Nov 2023 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 30 Dec 2025 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Dec 2025 | |
| RERA completion date | 31 Dec 2025 | |
| Completion date, agreement | 30 Jun 2031 | |
| Work began, as filed | 1 Aug 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 90.94 m on the fire NOC · 44.8 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 98.17 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026 | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/137/2025 · issued 17 Jun 2025 · building height 90.94 m | |
| Environmental clearance | SEIAA 141 CON 2025 · EC identification no. EC25C3801KA5657522N · issued 9 Jul 2025 | |
| Architect, quarterly | Form 5 · Jan 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹66.24 Cr 22.5%Development · ₹227.88 Cr 77.5%
| Estimated cost | ₹294.12 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (121) 91%Unsold (12) 9%
| Sold, Q3 2025-26 | 121 / 133 · 12 available | |
|---|---|---|
| Unsold, Q3 2025-26 | 12 |
| Escrow bank | INDUSIND BANK · M.G ROAD | |
|---|---|---|
| Designated account, collected | ₹44.27 Cr in Q3 2025-26 | |
| Designated account, withdrawn | ₹30.51 Cr in Q3 2025-26 (69% of that quarter's deposits) | |
| Share of collections deposited in escrow | 75.17% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | IndusInd Bank Limited · ₹40.00 Cr disbursed | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 27 Apr 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | INDUSIND BANK · M.G ROAD | |

Map of 6 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Adarsh Parkland, price locked; SOBHA Neopolis, price locked; Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58, price locked; Adarsh Rosewood, price locked; Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24, price locked; SOBHA Ayana, price locked.
| SOBHA Neopolis Phase 3 - W 1, 2, 10 & 11 | about 3 km | Locked |
|---|
| SOBHA Neopolis Phase 4 - 3, 4, 8 & 9 | about 3 km | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22 | about 3.5 km | Locked |
|---|
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58 | 3.6 km | Locked |
|---|
| Adarsh Rosewood | 3.6 km | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | 3.6 km | Locked |
|---|
| Sobha Sentosa Phase 1 Wing 7 | about 3.5 km | Locked |
|---|
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 3.5 km | Locked |
|---|
| about 3 km |
| 31 Dec 2030 |
| 98% (220 of 225) |
| Locked |
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 3 km | 31 Dec 2031 | 96% (289 of 302) | Locked |
|---|
| SOBHA Neopolis Phase 3 - W 1, 2, 10 & 11 | about 3 km | 31 Dec 2029 | 90% (335 of 374) | Locked |
|---|
| SOBHA Neopolis Phase 4 - 3, 4, 8 & 9 | about 3 km | 31 Dec 2031 | 85% (319 of 374) | Locked |
|---|
| Rent, 4BHK, 3 km | ₹86,000 /mo · 8 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹60,500 /mo · 178 listings | |
| Rent, 2BHK, 3 km | ₹36,000 /mo · 269 listings | |
| Rent, 1BHK, 3 km | ₹19,000 /mo · 227 listings | |
| Rent per sq ft, 3 km | ₹36.1 /mo, as listed · 258 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 45 (23 with an approximate location) | |
|---|---|---|
| Flats in them | 12,245 | |
| Booked | 6,794 of 12,245 (55%) | |
| Unsold | 5,451 | |
| Booked a month, pooled | 197 flats | |
| Months to sell, pooled | 28 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB, Other | |
| Nearest city water main | 470 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 80 m to the west, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 650 m, Kodibeesanahalli | |
| Kempegowda Airport | 45.6 | 47 | 27.8 |
| MG Road (CBD) | 12.0 | 18 | 10.4 |
| Manyata Tech Park | 18.3 | 25 | 13.3 |
| ITPL, Whitefield | 12.4 | 15 | 6.2 |
| Ecospace, Bellandur ORR | 5.7 | 12 | 3.0 |
| Electronic City Ph 1 | 20.3 | 29 | 12.3 |
| Landfill or waste transfer station | 2.8 km to the north-east | |
|---|---|---|
| Sewage treatment plant | 320 m to the east, named Kadabeesanahalli Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 530 m to the east |