Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | 1 | – | 2 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| A B AnanthaActive · 84% built | Amaravathi Builders | Apartment | 753–972 sqft carpet (as filed) | Jan 2027 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 63 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. 2 of 3 filed survey numbers matched, 1 found no plot, 1 plot has no filed extent to check against.
| Location & risks | – | 1 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| M/s.Abhee Developers |
| Plot |
| – |
| Completed |
| Abhee PrideCompleted · OC 18-04-2026 | ABHEE VENTURES PRIVATE LIMITED | Apartment | 688–842 sqft carpet (as filed) | Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
8 of 235 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Ds Max Sky Sampadha in the interactive atlas
Approval or registration
Land use converted
DC Bengaluru · Survey 32/1
K-RERA filing, land schedule
Covers 35/2 only
Approval or registration
Land use converted
DC Bengaluru · Survey 35/2
K-RERA filing, land schedule
Transfer of the land
Title deed registered
No. SRJ-1-08966-2024-25 · Book 1 · executed 31 Dec 2024 · Consideration ₹15.50 Cr · Sy 32/1, Manchenahalli village, Attibele hobli; Sy 35/2, Attibele hobli · 35 guntas; and 1 more item
Title deed filed with K-RERA, pp. 1, 4, 9, 19, 20 · See it in Documents
Transfer of the land
Title deed registered
No. SRJ-1-08966-2024-25 · Book 1 · executed 31 Dec 2024 · Consideration ₹15.50 Cr · Sy 32/1, Manchenahalli village, Attibele hobli; Sy 35/2, Attibele hobli · 35 guntas; and 1 more item
Title deed filed with K-RERA, pp. 1, 4, 9, 19, 20 · See it in Documents
Transfer of the land
Sale deed
in favour of DS MAX PROPERTIES PVT. LTD · Survey 32/1, 35/2, 35/4
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of DS MAX PROPERTIES PVT. LTD · Survey 32/1, 35/2, 35/4
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Panchayath · Survey 32/1, 35/2, 35/4
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Panchayath · Survey 32/1, 35/2, 35/4
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Satellite Town Ring Road Planning Authority · plan STRRPA/TP/CC/77/2025-26
K-RERA filing, approvals
Covers 35/4 only
Approval or registration
Land use converted
DC Bengaluru · Survey 35/4
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/291225/008366
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 23 Dec 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: ADLR - SKETCH, 1 page.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. 2 of 3 filed survey numbers matched, 1 found no plot, 1 plot has no filed extent to check against.
| Survey numbers | 32/1, 35/2, 35/4 | |
|---|---|---|
| Land extent, Sy 32/1 | 1A 18G | |
| Land extent, Sy 35/2 | 35 Guntas | |
| Land extent, Sy 35/4 | 1 Acre 8 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 14,264 sq m | |
| Khata | E Khatha · Panchayath · 16 May 2025 | |
| Sale deed | Dated 31 Dec 2024 | |
| Sale deed in favour of | DS MAX PROPERTIES PVT. LTD | |
| Survey | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|
| Sy. No. 32/1 | 2 | 1 acre 18 guntas | Yes | 0 | ||
| Sy. No. 35/2 | 4 | 35 guntas | 35 guntas | Differs: 1 acre 7 guntas apart | 0 |
Valid as of this reportValidity ended
| Building plan (Satellite Town Ring Road Planning Authority) | Sanctioned 9 Jul 2025 · No. STRRPA/TP/CC/77/2025-26 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/099/2025 · issued 29 May 2025 · building height 69 m | Clear |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-350326 · issued 28 Aug 2025 · valid until 27 Aug 2030 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 1 | |
| RERA completion date | 31 Oct 2030 |
| Land conversion | 3 of 3 parcels converted | |
|---|---|---|
| Sy 32/1 | Converted 2 Apr 2009 · DC Bengaluru | |
| Sy 35/2 | Converted 21 Dec 2023 · DC Bengaluru | |
| Sy 35/4 | Converted 21 Dec 2025 · DC Bengaluru | |
| Survey numbers | 32/1 · 35/2 · 35/4 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 88 m² 80%2BHK · avg 72 m² 20%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 110 | 775 |
| 3BHK | 440 | 951 |
| Sold, Q2 2026-27 | 39 / 550 | |
|---|---|---|
| Unsold, Q2 2026-27 | 511 | |
| Months to sell, derived from filed bookings | 118 months |
| Shriram 107southeast - Phase 3 | about 0.5 km | Locked | |
|---|---|---|---|
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | about 1.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 3, W5 | about 1.5 km | Locked |
| Ds Max Sky Sampadha This project | This project is the point the others are measured from | 31 Oct 2030 | 7% (39 of 550) | Not verified yet |
|---|---|---|---|---|
| Shriram 107southeast - Phase 3 | about 0.5 km | 7 Jan 2027 | 100% (1,055 of 1,055) | Locked |
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | about 1.5 km | 31 Dec 2027 | 100% (99 of 99) | Locked |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 14.8 km, G K LAYOUT | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 160 m to the north, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Piped Gas, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.10 (603 covered spaces for 550 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported itPossession date in the agreement

| Main structure | Not started · planned by 21 Nov 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 16 Sep 2030 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 10% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 31 Oct 2030 | |
|---|---|---|
| Schedule end | 31 Oct 2030 | |
| RERA completion date | 31 Oct 2030 | |
| Work began, as filed | 1 Jan 2026 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 69 m on the fire NOC · 69 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 37.16 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/099/2025 · issued 29 May 2025 · building height 69 m | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 9 Oct 2025 · site inspected 8 Oct 2025 | |
| Engineer's certificate, registration | Dated 9 Oct 2025 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹19.97 Cr 15.5%Development · ₹108.77 Cr 84.5%
| Estimated cost | ₹128.64 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹106.25 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (39) 7.1%Unsold (511) 92.9%
| Sold, Q3 2025-26 | 0 / 550 · 550 available | |
|---|---|---|
| Sold, Q4 2025-26 | 22 / 550 · 528 available | |
| Sold, Q1 2026-27 | 32 / 550 · 518 available | |
| Sold, Q2 2026-27 | 39 / 550 · 511 available | |
| Unsold, Q2 2026-27 | 511 | |
| Sold in Q4 2025-26 | 22 | |
| Sold in Q1 2026-27 | 10 | |
| Sold in Q2 2026-27 | 7 | |
| Flats booked, Form 4 Q1 2026-27 | 32 |
| Escrow bank | Indian Bank · KALYANNAGAR | |
|---|---|---|
| Designated account, collected | ₹2.04 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹2.02 Cr in Q2 2026-27 (99% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 1 | |
| K-RERA registrations under this promoter | 46 | |
|---|---|---|
| Marked completed | 26 | |
| Past promised date, not completed | 6 | |
| Complaints filed against the promoter | 19 | |
| Other phases under this promoter name | 39 | |
| With a filed extension or completion | 22 (19 completed, 3 extended) | |
| Average schedule slip | 22 months |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 23 Dec 2025 | |
| Building plan | Sanctioned 9 Jul 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Indian Bank · KALYANNAGAR | |

Map of 1 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: SOBHA Townpark, price locked.
| Sobha Brooklyn Towers - Town Park Phase 4, W4 | about 1.5 km | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | about 1.5 km | Locked |
|---|
| SOBHA Townpark | 1.7 km | Locked |
|---|
| Columbia Aaltius | about 2 km, to a locality centre | Locked |
|---|
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 | about 2 km | Locked |
|---|
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 | about 2 km | Locked |
|---|
| Sobha Hamptons -Townpark Phase 1 W4 To 6 | about 2.5 km | Locked |
|---|
| Sobha Madison Heights-Townpark Phase 1 W5 To 7 | about 2.5 km | Locked |
|---|
| Sobha Madison Heights-Townpark Phase 2 W1 To 4 | about 2.5 km | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 3, W5 | about 1.5 km | 30 Jun 2029 | 100% (99 of 99) | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 4, W4 | about 1.5 km | 30 Jun 2029 | 100% (99 of 99) | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | about 1.5 km | 30 Jun 2028 | 100% (261 of 261) | Locked |
|---|
| SOBHA Townpark | 1.7 km | 30 Jun 2033 | 51% (250 of 492) | Locked |
|---|
| Rent, 2BHK, 3 km | ₹23,000 /mo · 5 listings | |
|---|---|---|
| Rent per sq ft, 3 km | ₹23.8 /mo, as listed · 6 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 21 (15 with an approximate location) | |
|---|---|---|
| Flats in them | 6,779 | |
| Booked | 5,145 of 6,779 (76%) | |
| Unsold | 1,634 | |
| Booked a month, pooled | 101 flats | |
| Months to sell, pooled | 16 months |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (Panchayath) | |
| Nearest city water main | 10.9 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | 8.4 km, Bommasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 63.9 | 69 | 47.6 |
| MG Road (CBD) | 29.6 | 37 | 27.7 |
| Manyata Tech Park | 40.2 | 47 | 33.4 |
| ITPL, Whitefield | 33.4 | 37 | 23.7 |
| Ecospace, Bellandur ORR | 27.6 | 34 | 18.6 |
| Electronic City Ph 1 | 11.9 | 14 | 10.8 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 3.0 km to the north | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 930 m to the north-west, named Attibele on OpenStreetMap |