Elements Of Nature Happy Hive Phase - 2 full report… | DOSL
39 44 38 96 27 24 45 23 25 39 33 26 22 41 29 40 38 35 28 39 31 92 59 90 60 93 94 30 95 37 32 142 38 36 136 137 100 m !
Review
Canterbury Meadows Phase 2 Applied for completion 30/10/2024 Arunapanchami Estates Private Limited Plot ~1,160–1,500 sqft (estimate: filed carpet plus 25%) Nov 2023
Other projects in North Bengaluru, A to Z
8 of 43 other projects in North Bengaluru, A to Z. Status is taken from each project's own filing.
Not verified yet
Boundaries Schedule in the EC vs KGIS neighbours Encumbrance certificate, Form 15 Survey sketch Survey sketch filed with K-RERA Sketch, sanction and mutation vs KGIS map Land record The RTC of each filed survey Ownership Joint development agreement
Agreement for sale
Form 4 certified totals Registered deeds Transactions in this project The area Price trend North Bengaluru, past year Not verified yet
Bengaluru, past year Not verified yet
North since 2022 Not verified yet
This project vs North Bengaluru Not verified yet
Price per sq ft, super built-up Registered sales around Registered sale price per sq ft, by year Transactions around this project Comparable projects Carpet price, projects within 4 km Nearest 12 with filed prices Nearest projects This project vs the nearest with filed prices Unsold stock nearby Months to sell unsold stock Around it Water Groundwater, Hosakote taluk average 0 m 10 m 20 m 30 m 40+ m 10 to 20 20 to 40 Ten-year July mean for Hosakote: 62 m Hosakote taluk average, July 2023 22.6 m below ground 0 m 10 m 20 m 30 m 40+ m 5 to 10 10 to 20 20 to 40 Ten-year July mean for Hosakote: 62 m Hosakote taluk average, July 2023 22.6 m below ground 0 m 10 m 20 m 30 m 40+ m 2 to 5 5 to 10 10 to 20 20 to 40 Ten-year July mean for Hosakote: 62 m Hosakote taluk average, July 2023 22.6 m below ground 0 m 10 m 20 m 30 m 40+ m 2 to 5 5 to 10 10 to 20 20 to 40 Ten-year July mean for Hosakote: 62 m Hosakote taluk average, July 2023 22.6 m below ground Ten-year July mean for this taluk: 62 m
Across Hosakote, the water table sat 22.6 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 62 m, and it recovered 4.9 m over the year.
Connectivity Road distance from the site Kempegowda Airport Kempegowda Airport: 23.2 km by road 23.2 km MG Road (CBD) MG Road (CBD): 33.0 km by road 33.0 km Manyata Tech Park Manyata Tech Park: 32.5 km by road 32.5 km ITPL, Whitefield ITPL, Whitefield: 23.5 km by road 23.5 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 34.1 km by road 34.1 km Electronic City Ph 1 Electronic City Ph 1: 47.8 km by road 47.8 km
Kempegowda Airport
Specified structure What the promoter specified · not an inspection Specification sheet, page 1 Specified finishes Specification sheet · brands "or equivalent" Certificates Engineer, architect and fire certificates Structural safety certificate
No K-RERA filing
1 km 3 km 2 km 39 44 38 96 27 24 45 23 25 39 33 26 22 41 29 40 38 35 28 39 31 92 59 90 60 93 94 30 95 37 32 142 38 36 136 137 100 m 500 m 500 m Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Storm drain, primary Storm drain, smaller Lake or tank Metro line (dashed: planned) High-tension line, 765, 400, 220 and 66 kV Its corridor, to scale Buried cable The siteKempegowda Airport: 23.2 km by road 23.2 km MG Road (CBD) MG Road (CBD): 33.0 km by road 33.0 km Manyata Tech Park Manyata Tech Park: 32.5 km by road 32.5 km ITPL, Whitefield ITPL, Whitefield: 23.5 km by road 23.5 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 34.1 km by road 34.1 km Electronic City Ph 1 Electronic City Ph 1: 47.8 km by road 47.8 km Kempegowda Airport Kempegowda Airport: 23.2 km by road 23.2 km MG Road (CBD) MG Road (CBD): 33.0 km by road 33.0 km Manyata Tech Park Manyata Tech Park: 32.5 km by road 32.5 km ITPL, Whitefield ITPL, Whitefield: 23.5 km by road 23.5 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 34.1 km by road 34.1 km Electronic City Ph 1 Electronic City Ph 1: 47.8 km by road 47.8 km
Kempegowda Airport Kempegowda Airport: 23.2 km by road 23.2 km MG Road (CBD) MG Road (CBD): 33.0 km by road 33.0 km Manyata Tech Park Manyata Tech Park: 32.5 km by road 32.5 km ITPL, Whitefield ITPL, Whitefield: 23.5 km by road 23.5 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 34.1 km by road 34.1 km Electronic City Ph 1 Electronic City Ph 1: 47.8 km by road 47.8 km
Six city anchors · OSRM, no traffic