| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| A B AnanthaActive · 84% built | Amaravathi Builders | Apartment | 753–972 sqft carpet (as filed) | Jan 2027 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 56 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | 1 | 1 | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | – | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| M/s.Abhee Developers |
| Plot |
| – |
| Completed |
| Abhee PrideCompleted · OC 18-04-2026 | ABHEE VENTURES PRIVATE LIMITED | Apartment | 688–842 sqft carpet (as filed) | Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
8 of 235 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Life By The Greens in the interactive atlas
Approval or registration
Land use converted
DC office Bangalore Dist · Survey 327/2, 327/4, 327/5, 327/6, 327
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Local Planning Authority · plan STRRPA/TP/CC/102/24-25
K-RERA filing, approvals
Approval or registration
Khata issued
A Khatha · BLR · Survey 327/2, 327/4, 327/5, 327/6, 327
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/070325/007558
K-RERA registration ·
Approval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 31 Dec 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: ADLR Certified survey sketch, 1 page.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 327/2, 327/4,327/5,327/6 & 327 | |
|---|---|---|
| Land extent, Sy 327/2, 327/4,327/5,327/6 & 327 | 2 Acre 32 GUNTAS | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 10,761 sq m | |
| Khata | A Khatha · BLR · 2 Dec 2024 | |
Valid as of this reportValidity ended
| Building plan (Local Planning Authority) | Sanctioned 18 Oct 2024 · No. STRRPA/TP/CC/102/24-25 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-128224 · issued 26 Jul 2024 · valid until 25 Jul 2029 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Mar 2028 |
| Land conversion | Converted 27 Dec 2019 · DC office Bangalore Dist | |
|---|---|---|
| Survey numbers | 327/2, 327/4,327/5,327/6 & 327 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
4BHK · avg 278 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 4BHK | 50 | 2,988 |
| Sold, Q1 2026-27 | 13 / 50 | |
|---|---|---|
| Unsold, Q1 2026-27 | 37 | |
| Months to sell, derived from filed bookings | 17 months |
| Shriram 107southeast - Phase 3 | about 0.5 km | Locked | |
|---|---|---|---|
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | about 2.5 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 3, W5 | about 2.5 km | Locked |
| Life By The Greens This project | This project is the point the others are measured from | 31 Mar 2028 | 26% (13 of 50) | Not verified yet |
|---|---|---|---|---|
| Shriram 107southeast - Phase 3 | about 0.5 km | 7 Jan 2027 | 100% (1,055 of 1,055) | Locked |
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | about 2.5 km | 31 Dec 2027 | 100% (99 of 99) | Locked |
| Rent per sq ft, 3 km | ₹24.7 /mo, as listed · 5 listings with a size | |
|---|---|---|
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 15.6 km, G K LAYOUT | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 220 m to the south, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Parks, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 2.20 (110 covered spaces for 50 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not declared | |
As the promoter reported itPossession date in the agreement

| Main structure | 40% · planned by 30 Jan 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 30 Jan 2028 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 48% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 31 Mar 2028 | |
|---|---|---|
| Schedule end | 31 Mar 2028 | |
| RERA completion date | 31 Mar 2028 | |
| Work began, as filed | 1 Jan 2025 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 9.9 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC windows | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jun 2026, Jun 2026, Jul 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jun 2026, Jun 2026, Jul 2026 (3 filed) | |
| Architect's certificate, registration | Site inspected 18 Dec 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹8.17 Cr 12.4%Development · ₹57.97 Cr 87.6%
| Estimated cost | ₹66.14 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (13) 26%Unsold (37) 74%
| Sold, Q3 2025-26 | 0 / 50 · 50 available | |
|---|---|---|
| Sold, Q4 2025-26 | 7 / 50 · 43 available | |
| Sold, Q1 2026-27 | 13 / 50 · 37 available | |
| Unsold, Q1 2026-27 | 37 | |
| Sold in Q4 2025-26 | 7 | |
| Sold in Q1 2026-27 | 6 |
| Escrow bank | HDFC · BENGALURU RICHMOND ROAD | |
|---|---|---|
| Designated account, collected | ₹8.26 Cr in Q1 2026-27 | |
| Designated account, withdrawn | ₹8.26 Cr in Q1 2026-27 (100% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 31 Dec 2024 | |
| Building plan | Sanctioned 18 Oct 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · BENGALURU RICHMOND ROAD | |

Map of 1 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: SOBHA Townpark, price locked.
| Sobha Brooklyn Towers - Town Park Phase 4, W4 | about 2.5 km | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | about 2.5 km | Locked |
|---|
| SOBHA Townpark | 2.5 km | Locked |
|---|
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 | about 2.5 km | Locked |
|---|
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 | about 2.5 km | Locked |
|---|
| Columbia Aaltius | about 3 km, to a locality centre | Locked |
|---|
| Sobha Hamptons -Townpark Phase 1 W4 To 6 | about 3 km | Locked |
|---|
| Sobha Madison Heights-Townpark Phase 1 W5 To 7 | about 3 km | Locked |
|---|
| Sobha Madison Heights-Townpark Phase 2 W1 To 4 | about 3 km | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 3, W5 | about 2.5 km | 30 Jun 2029 | 100% (99 of 99) | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 4, W4 | about 2.5 km | 30 Jun 2029 | 100% (99 of 99) | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | about 2.5 km | 30 Jun 2028 | 100% (261 of 261) | Locked |
|---|
| SOBHA Townpark | 2.5 km | 30 Jun 2033 | 51% (250 of 492) | Locked |
|---|
| Projects within 4 km, counted | 21 (15 with an approximate location) | |
|---|---|---|
| Flats in them | 7,012 | |
| Booked | 5,029 of 7,012 (72%) | |
| Unsold | 1,983 | |
| Booked a month, pooled | 97 flats | |
| Months to sell, pooled | 20 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | 11.8 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | 9.4 km, Bommasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 65.3 | 71 | 47.7 |
| MG Road (CBD) | 31.0 | 39 | 28.5 |
| Manyata Tech Park | 41.6 | 49 | 33.9 |
| ITPL, Whitefield | 34.8 | 40 | 23.8 |
| Ecospace, Bellandur ORR | 29.1 | 36 | 19.2 |
| Electronic City Ph 1 | 13.3 | 17 | 11.7 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 2.0 km to the west, named Attibele on OpenStreetMap |