Overview
Overview
Overview
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Affinity BrundaavanaExtended to 01-04-2027 | AFFINITY PROJECTS | Apartment | 775–1,609 sqft carpet (as filed) | Apr 2027 |
| Alpine Pyramid - IrisActive · 42% built | ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED | Apartment | 729–1,004 sqft carpet (as filed) | Apr 2028 |
| Amigo EstellaCompleted · OC 06-04-2023 | AMIGOESTELLA INDIA LLP | Apartment | – | Completed |
| Arvind SporciaCompleted · OC 23-03-2018 | Arvind SmartSpaces Limited | Apartment | 3,768 sqft carpet (as filed) | Completed |
| Assetz Soho & Sky Phase 1bActive · 85% built | APG IMPERIAL HOMES PRIVATE LIMITED | Apartment | 1,370–1,886 sqft carpet (as filed) | Dec 2027 |
| Baldota SignatureCompleted · OC 29-12-2022 | BALDOTA BUILDERS AND DEVELOPERS | Apartment | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
| Completed |
| BlissCompleted · OC 15-04-2023 | FINELINE INFRA PRIVATE LIMITED | Apartment | 758 sqft carpet (as filed) | Completed |
| Boulevard ResidencesCompleted · OC 27-01-2023 | SILVERTREE PROJECTS LLP | Apartment | 678–1,039 sqft carpet (as filed) | Completed |
8 of 39 other projects in Rachenahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Ncnakshaya is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Sumadhura Epitome | about 0.5 km, to a locality centre | Locked | |
|---|---|---|---|
| Sumadhura Solea | about 0.5 km, to a locality centre | Locked | |
| Sobha City Athena | about 1 km, to a locality centre | Locked | |
| Brr North Excellency Phase I | about 1.5 km, to a locality centre | Locked |
| Ncnakshaya This project | This project is the point the others are measured from | Not on the filing | Not filed | Not verified yet |
|---|---|---|---|---|
| Sumadhura Epitome | about 0.5 km, to a locality centre | 31 Dec 2027 | 58% (152 of 262) | Locked |
| Sumadhura Solea | about 0.5 km, to a locality centre | 30 Jun 2029 | 14% (32 of 233) | Locked |
| Nearest storm drain | about 0.5 km from the locality centre, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 1 km from the locality centre, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km from the locality centre, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | Not verified yet | |
| Landfill or waste transfer station | None within 3 km of the locality centre | |
|---|---|---|
| Sewage treatment plant | about 2 km from the locality centre, named Rachenahalli 10MLD Sewage Treatment Planet on OpenStreetMap | |
| Quarry | about 1 km from the locality centre | |
| Crematorium | None within 3 km of the locality centre | |
| Prison | None within 3 km of the locality centre | |
| Electrical substation | about 1 km from the locality centre |
| Assetz Soho & Sky Phase 1b | about 1.5 km, to a locality centre | Locked |
|---|
| Sattva La Vita | about 2 km, to a locality centre | Locked |
|---|
| Mirabelle Phase 2 | about 2 km, to a locality centre | Locked |
|---|
| Lodha Mirabelle | about 2 km, to a locality centre | Locked |
|---|
| Cumins Sanctum | about 2 km, to a locality centre | Locked |
|---|
| Assetz Soho & Sky | about 3 km, to a locality centre | Locked |
|---|
| Nava Skanda Bellavita | about 3.5 km, to a locality centre | Locked |
|---|
| The Pearl Paradise | about 3.5 km, to a locality centre | Locked |
|---|
| Sobha City Athena | about 1 km, to a locality centre | 30 Sep 2027 | 100% (72 of 72) | Locked |
|---|
| Brr North Excellency Phase I | about 1.5 km, to a locality centre | 31 Dec 2029 | 33% (34 of 104) | Locked |
|---|
| Assetz Soho & Sky Phase 1b | about 1.5 km, to a locality centre | 31 Dec 2027 | 100% (120 of 120) | Locked |
|---|
| Sattva La Vita | about 2 km, to a locality centre | 12 Jul 2026 | 32% (20 of 63) | Locked |
|---|