Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Kr Grand View HeightsCompleted · OC 02-03-2022 | K R Constructions | Mixed development | – | Completed |
| La VidaLapsed · completion date passed | UNISHIRE BUILDERS PRIVATE LIMITED | Apartment | – | Apr 2022 |
| Legacy SavieroExtended to 30-06-2027 | Chitrakut Estates Private Limited | Apartment | 994–1,256 sqft carpet (as filed) | Jun 2027 |
| Mashri PrajavaniLapsed · completion date passed | Mashri Buildtech LLP | Apartment | – | Mar 2022 |
| Nava Subha SamruddhiCompleted · OC 29-08-2023 | M/S NAVA JYOTHI SHELTERS PRIVATE LIMITED | Apartment | – | Completed |
| Nava Vaibhava ‘b’ And ‘c’ BlockCompleted · OC 10-12-2021 | NAVAJYOTHI CONSTRUCTIONS | Apartment | 844–1,072 sqft carpet (as filed) | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 56 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | 1 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nava Vaibhava A BlockCompleted · OC 26-11-2020 | M/S NAVAJYOTHI CONSTRUCTIONS REPRESENTED BY K MURALI BABU | Apartment | – | Completed |
| Nithya Infra SunshineActive · 87% built | Nithya Infra Sunshine | Apartment | 658–1,163 sqft carpet (as filed) | Dec 2027 |
8 of 10 other projects in Central Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Needs 3 Project 168 in the interactive atlas
Approval or registration
Land use converted
SPECIAL DEPUTY COMMISSIONER · Survey 98/3A
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of M/S VORA REALTY PVT LTD · Survey 98/3A
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · ASST REVENUE OFFICER, HORAMAVU CIRCLE · Survey 98/3A
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan PRJ/11950/21-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/151222/005522
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 98/3A | |
|---|---|---|
| Land extent, Sy 98/3A | 2 (unit not stated) | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 7,944 sq m | |
| Khata | A Khatha · ASST REVENUE OFFICER, HORAMAVU CIRCLE · 25 Aug 2021 | |
| Sale deed | Dated 12 Apr 2012 | |
| Sale deed in favour of | M/S VORA REALTY PVT LTD | |
| Joint development agreement number | 8369 of Book 1, 2021-22 | |
|---|---|---|
| Landowner share | Not verified yet | |
| Developer share | Not verified yet | |
| Sale deed signed by | Not verified yet | |
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 29 Jul 2022 · No. PRJ/11950/21-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/199/2021 · issued 25 Nov 2021 · building height 44.95 m | Clear |
| SEIAA | Filed with the registration | |
| Airport height NOC | NOC ID BIAL/SOUTH/B/081021/566848 · issued 6 Sep 2021 · valid until 5 Sep 2029 | Clear |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2026 |
| Land conversion | Converted 14 Nov 2008 · SPECIAL DEPUTY COMMISSIONER | |
|---|---|---|
| Survey numbers | 98/3A |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 97 m² 66.1%2BHK · avg 73 m² 33.9%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 43 | 788 |
| 3BHK | 84 | 1,049 |
| Sold, Q2 2026-27 | 4 / 119 | |
|---|---|---|
| Unsold, Q2 2026-27 | 115 |
| Legacy Saviero | about 0.5 km | Locked | |
|---|---|---|---|
| Vkk Grand | about 2.5 km | Locked | |
| SOBHA Victoria Park Phase 1 | about 3.5 km | Locked | |
| Assetz Sun & Sanctum - Phase 2 | about 4.5 km | Locked | |
| Nava Skanda Bellavita |
| Needs 3 Project 168 This project | This project is the point the others are measured from | 31 Dec 2026 | 3% (4 of 119) | Not verified yet |
|---|---|---|---|---|
| Legacy Saviero | about 0.5 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
| Vkk Grand | about 2.5 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
| SOBHA Victoria Park Phase 1 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 0.5 km, Hoysala nagar in Hormavu | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Horamavu | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | Review |
| Electricity, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Gym, built | 0% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.28 (162 covered spaces for 127 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | 70% · planned by 1 Aug 2024 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 15 Sep 2025 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 60% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Dec 2026 | |
| RERA completion date | 31 Dec 2026 | |
| Work began, as filed | 1 Oct 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 44.95 m on the fire NOC | |
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 12 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/199/2021 · issued 25 Nov 2021 · building height 44.95 m | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Feb 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
Land · ₹32.84 Cr 31.8%Development · ₹70.52 Cr 68.2%
| Estimated cost | ₹103.36 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (4) 3.4%Unsold (115) 96.6%
| Sold, Q3 2025-26 | 4 / 119 · 115 available | |
|---|---|---|
| Sold, Q4 2025-26 | 4 / 119 · 115 available | |
| Sold, Q1 2026-27 | 4 / 119 · 115 available | |
| Sold, Q2 2026-27 | 4 / 119 · 115 available | |
| Unsold, Q2 2026-27 | 115 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 | |
| 3BHK, sold | 4 / 119 |
| Escrow bank | KOTAK MAHINDRA BANK · JP Nagar 4th Phase | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 29 Jul 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | KOTAK MAHINDRA BANK · JP Nagar 4th Phase | |

| about 4.5 km |
| Locked |
| Brr North Excellency Phase I | about 5 km | Locked |
|---|
| Lodha Mirabelle | about 5 km | Locked |
|---|
| Mirabelle Phase 2 | about 5 km | Locked |
|---|
| The Pearl Paradise | about 5 km | Locked |
|---|
| Sumadhura Solea | about 6 km | Locked |
|---|
| Sumadhura Epitome | about 6 km | Locked |
|---|
| Sattva La Vita | about 6 km | Locked |
|---|
| about 3.5 km |
| 31 Dec 2027 |
| 93% (280 of 300) |
| Locked |
| Assetz Sun & Sanctum - Phase 2 | about 4.5 km | 31 Jul 2026 | 100% (70 of 70) | Locked |
|---|
| Nava Skanda Bellavita | about 4.5 km | 31 Dec 2029 | 18% (63 of 360) | Locked |
|---|
| Brr North Excellency Phase I | about 5 km | 31 Dec 2029 | 33% (34 of 104) | Locked |
|---|
| Projects within 4 km, counted | 18 (18 with an approximate location) | |
|---|---|---|
| Flats in them | 3,720 | |
| Booked | 2,553 of 3,720 (69%) | |
| Unsold | 1,167 | |
| Booked a month, pooled | 68 flats | |
| Months to sell, pooled | 17 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 1 km, Horamavu | |
| Kempegowda Airport | 28.5 | 20 |
| MG Road (CBD) | 12 | 8.5 |
| Manyata Tech Park | 7 | 5 |
| ITPL, Whitefield | 13.5 | 9 |
| Ecospace, Bellandur ORR | 15.5 | 11 |
| Electronic City Ph 1 | 28.5 | 20.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Bangalore Water Supply and Sewerage Board on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km, named Banaswadi Substation on OpenStreetMap |