Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 505 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adarsh ParadiseActive · 87% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
| Adithya RicaCompleted (regulator flag) | ADITHYA CONSTRUCTIONS | Apartment | 769 sqft carpet (as filed) | Completed |
8 of 264 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open One Residences At Sobha One World Ph3 W5 And 6 in the interactive atlas
| Survey | Land converted | Sale deed | Khata | Extent |
|---|---|---|---|---|
| 187/1 | 25 Jun 2005Deputy Commissioner, Bengaluru Rural District | 19 Nov 2005in favour of Sobha Limited | 17 Mar 2026A Khatha · Rural Development and Panchayath Raj Dep | 27 Gunta |
| Survey 36 | ||||
| 36/1 | 12 Dec 2007Deputy Commissioner, Bengaluru Rural District | 24 Jan 2008in favour of Sobha Limited | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 26 gunta |
| 36/1 | 24 Jan 2008Deputy Commissioner, Bengaluru Rural District | 24 Jan 2008in favour of Sobha Limited | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 13.25 Gunta |
| 36/1 | 18 Dec 2007Deputy Commissioner, Bengaluru Rural District | 24 Jan 2008in favour of Sobha Limited | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 13.25 Gunta |
| Survey 60 | ||||
| 60/7, 60/6 | 26 Jun 2025Deputy Commissioner, Bengaluru Rural District | 14 May 2025in favour of Sobha Limited | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 8 Gunta + 18 Gunta |
| 60/2 | 18 Dec 2007Deputy Commissioner, Bengaluru Rural District | 24 Jan 2008in favour of Sobha Limited (SDPL) | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 11 Gunta |
| 60/1 | 12 Dec 2007Deputy Commissioner, Bengaluru Rural District | 24 Jan 2008in favour of Sobha Limited (SDPL) | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 18 Gunta |
| Survey 61 | ||||
| 61/2 | 24 May 2005Deputy Commissioner, Bengaluru Rural District | 18 Nov 2005in favour of Sobha Limited (SDPL) | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 33 Gunta |
| 61/2 | 12 Dec 2007Deputy Commissioner, Bengaluru Rural District | 24 Jan 2008in favour of Sobha Limited (SDPL) | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 12 Gunta |
| 61/3 | 13 Nov 2019Deputy Commissioner, Bengaluru Rural District | 19 Feb 2020in favour of Sobha Limited (SDPL) | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 6 Gunta |
| Survey 51 | ||||
| 51/1 | 1 Aug 2007Deputy Commissioner, Bengaluru Rural District | 1 Aug 2007in favour of Sobha Limited | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 21.75 Gunta |
| 51/1 | 11 Sep 2008Deputy Commissioner, Bengaluru Rural District | 15 Mar 2024in favour of Sobha Limited | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 6.75 Gunta |
| 51/2 | 23 Sep 2020Deputy Commissioner, Bengaluru Rural District | 7 Oct 2020in favour of Sobha Limited | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 9 Gunta |
| 50 | 12 Dec 2007Deputy Commissioner, Bengaluru Rural District | 24 Jan 2008in favour of Sobha Limited | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 16 Gunta |
| Survey 62 | ||||
| 62/1 | 12 Dec 2007Deputy Commissioner, Bengaluru Rural District | 25 Jan 2008in favour of Sobha Limited (SDPL) | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 29 Gunta |
| 62/2 | 12 Dec 2007Deputy Commissioner, Bengaluru Rural District | 24 Jan 2008in favour of Sobha Limited (SDPL) | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 14.50 Gunta |
| 66/3 | 12 Dec 2007Deputy Commissioner, Bengaluru Rural District | 24 Jan 2008in favour of Sobha Limited (SDPL) | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 38 Gunta |
| Survey 177 | ||||
| 177/1 | 17 Apr 2010Deputy Commissioner, Bengaluru Rural District | 15 Nov 2011in favour of Sobha Limited (SDPL) | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 36.50 Gunta |
| 177/2 | 13 Nov 2019Deputy Commissioner, Bengaluru Rural District | 26 Feb 2020in favour of Sobha Limited (SDPL) | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 19.50 Gunta |
| 177/3 | 17 Apr 2010Deputy Commissioner, Bengaluru Rural District | 8 Nov 2011in favour of Sobha Limited (SDPL) | 17 Mar 2026E Khatha · Rural Development and Panchayath Raj Dep | 10 Gunta |
K-RERA filing, land schedule
Deeds read, and the whole project
Transfer of the land
Title deed registered
No. HSK-1-03375-2005-06 · Book 1 · Sy 61/2, Kasaba hobli, Hoskote taluk · 33 Guntas
Title deed filed with K-RERA, pp. 6, 7 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹3.68 Cr · Sy 31/1, Amani Doddakere village, Kasaba hobli, Hoskote taluk; Sy 31/3, Amani Doddakere village, Kasaba hobli, Hoskote taluk; and 8 more items
Title deed filed with K-RERA, pp. 1, 3, 7, 9, 11, 13 · See it in Documents
Transfer of the land
Title deed registered
No. HSK-1-06073-2007-08 · Book 1 · Consideration ₹6.03 Cr · Sy 26; Sy 50; and 18 more items
Title deed filed with K-RERA, pp. 3, 4, 8, 9, 10, 11, 12 · See it in Documents
Transfer of the land
Title deed registered
No. HSK-1-06074-2007-08 · Book 1 · Consideration ₹1.79 Cr · Sy 32, Kasaba hobli, Hoskote taluk; Sy 60/1, Amanidoddakere village, Kasaba hobli, Hoskote taluk; and 3 more items
Title deed filed with K-RERA, pp. 3, 4, 8 · See it in Documents
Transfer of the land
Title deed registered
No. HSK-1-06098-2007-08 · Book 1 · Consideration ₹1.93 Cr · Sy 21/1B, Kasaba hobli, Hoskote taluk; Sy 62/1, Kasaba hobli, Hoskote taluk; and 6 more items
Title deed filed with K-RERA, pp. 3, 4, 8, 9 · See it in Documents
Transfer of the land
Title deed registered
No. HSK-1-19591-2023-24 · Book 1 · executed 15 Mar 2024 · Consideration ₹48.0 L · Sy 51/1, Amanidoddakere village, Kasaba hobli, Hoskote taluk
Title deed filed with K-RERA, pp. 1, 4, 15, 19 · See it in Documents
Transfer of the land
Title deed registered
No. HSK-1-02157-2025-26 · Book 1 · executed 14 May 2025 · Consideration ₹5.05 Cr · Sy 60/7; 60/1, Amanidoddakere village, Kasaba hobli, Hoskote taluk; Sy 60/6; 60/1, Amanidoddakere village, Kasaba hobli, Hoskote taluk
Title deed filed with K-RERA, pp. 1, 4, 11, 14 · See it in Documents
Approval or registration
Building plan sanctioned
Satellite Town Ring Road Planning Authority · plan STRRPA/TP/CC/652/2025-26/318
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/304/PR/080526/008635
K-RERA registration
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 6 Mar 2026 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: 3 ADLR Sketch, 1 page.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 187/1, 36/1, 60/7, 60/6, 60/2, 60/1 and 11 more | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 36,038 sq m | |
| Khata | A Khatha · Rural Development and Panchayath Raj Dep · 17 Mar 2026; E Khatha · Rural Development and Panchayath Raj Dep · 17 Mar 2026 | |
| Sale deed | Dated 18 Nov 2005, 19 Nov 2005, 1 Aug 2007 and 9 more | |
| Sale deed in favour of | Sobha Limited, Sobha Limited (SDPL) | |
| Title deed | Consideration ₹25.7 L · Sy 61/3; 61/1, Amanidoddakere village, Kasaba hobli, Hoskote taluk | |
| Title deed | Consideration ₹32.6 L · Sy 51/2, Amanidoddakere village, Kasaba hobli, Hoskote taluk · 9 Guntas | |
| Title deed | Sy 177/3, Amanidoddakere village, Kasaba hobli, Hoskote taluk · 10 Guntas | |
| Title deed | Consideration ₹38.1 L | |
| Title deeds | And 2 more read from the filing | |
| Building plan (Satellite Town Ring Road Planning Authority) | Sanctioned 7 May 2026 · No. STRRPA/TP/CC/652/2025-26/318 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/167/2026 · issued 16 Apr 2026 | Clear |
| Environmental clearance | SEIAA 240 CON 2025 · EC identification no. EC25B3813KA5874774N · issued 30 Jan 2026 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Sep 2033 |
| Land conversion | 22 of 22 parcels converted | |
|---|---|---|
| Sy 187/1 | Converted 25 Jun 2005 · Deputy Commissioner, Bengaluru Rural District | |
| Sy 36/1, 60/1, 61/2, 50, 62/1, 62/2,… | Converted 12 Dec 2007 · Deputy Commissioner, Bengaluru Rural District | |
| Sy 36/1 | Converted 24 Jan 2008 · Deputy Commissioner, Bengaluru Rural District | |
| Sy 36/1, 60/2 | Converted 18 Dec 2007 · Deputy Commissioner, Bengaluru Rural District | |
| Sy 60/7, 60/6 | Converted 26 Jun 2025 · Deputy Commissioner, Bengaluru Rural District | |
| Sy 61/2 | Converted 24 May 2005 · Deputy Commissioner, Bengaluru Rural District | |
| Other parcels | 5 more groups on the filing | |
| Survey numbers | 187/1 · 36/1 · 36/1 · 36/1 · 60/7 · 60/6 · 60/2 · 60/1 · 61/2 · 61/2 · 51/1 · 51/1 · 51/2 · 50 · 61/3 · 62/1 · 62/2 · 62/2 · 66/3 · 177/1 · 177/2 · 177/3 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 103 m² 83.4%4BHK · avg 119 m² 16.6%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 3BHK | 442 | 1,107 |
| 4BHK | 88 | 1,276 |
| Sold, Q2 2026-27 | 0 / 530 | |
|---|---|---|
| Unsold, Q2 2026-27 | 530 |
| One Residences At Sobha One World Ph4 W7 And 8 | about 0.5 km | Locked | |
|---|---|---|---|
| One Residences At Sobha One World Ph5 W9,10,11 | about 0.5 km | Locked | |
| One Residences At Sobha One World Ph6 W12,13,14 | about 0.5 km | Locked | |
| Godrej Parkshire (Hoskote) | about 2 km | Locked |
| One Residences At Sobha One World Ph3 W5 And 6 This project | This project is the point the others are measured from | 30 Sep 2033 | 0% (0 of 530) | Not verified yet |
|---|---|---|---|---|
| One Residences At Sobha One World Ph4 W7 And 8 | about 0.5 km | 30 Sep 2033 | 22% (98 of 440) | Locked |
| One Residences At Sobha One World Ph5 W9,10,11 | about 0.5 km | 28 Feb 2033 | 62% (449 of 721) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 6.5 km, SAI BABA ASHRAM KADUGODI | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Swimming Pool, built | 0% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.00 (530 covered spaces for 530 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 62 m
Across Hosakote, the water table sat 22.6 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 62 m, and it recovered 4.9 m over the year.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.6 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, Local authority (Gramapanchayath) | |
| Nearest city water main | Not verified yet | |
As the promoter reported itPossession date in the agreement
| Main structure | Not started · planned by 28 Apr 2031 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 20 Aug 2032 | |
| Internal roads | Not verified yet | |
| Club house | Not started | |
| Completion | 1% | |
| Completion, accountant | 10.3% of the estimated cost spent | |
| Possession, agreement | 30 Sep 2033 | |
|---|---|---|
| Schedule end | 30 Sep 2033 | |
| RERA completion date | 30 Sep 2033 | |
| Work began, as filed | 1 Oct 2026 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 146.5 m filed, 2 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 900 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jul 2026, Oct 2026 (2 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/167/2026 · issued 16 Apr 2026 | |
| Environmental clearance | SEIAA 240 CON 2025 · EC identification no. EC25B3813KA5874774N · issued 30 Jan 2026 | |
| Architect, quarterly | Form 5 · Jul 2026, Oct 2026 (2 filed) | |
| Architect's certificate, registration | Dated 22 Apr 2026 · site inspected 22 Apr 2026 | |
| Engineer's certificate, registration | Dated 23 Apr 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹83.51 Cr 10.2%Development · ₹731.90 Cr 89.8%
| Estimated cost | ₹815.41 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹564.16 Cr | |
| Estimated cost, engineer's certificate | ₹564.16 Cr | |
| Estimated cost, Form 4 Q1 2026-27 | ₹706.40 Cr | |
| Cost incurred | ₹72.50 Cr (10.3% of the estimate) | |
| Cost left | ₹633.89 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹208.82 Cr | |
| Land cost revision | Not verified yet | |
Unsold (530) 100%
| Sold, Q1 2026-27 | 0 / 530 · 530 available | |
|---|---|---|
| Sold, Q2 2026-27 | 0 / 530 · 530 available | |
| Unsold, Q2 2026-27 | 530 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | Axis Bank · MG Road | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 118 | |
|---|---|---|
| Marked completed | 61 | |
| Past promised date, not completed | 7 | |
| Revoked or withdrawn | 7 | |
| Complaints filed against the promoter | 226 | |
| Other phases under this promoter name | 114 | |
| With a filed extension or completion | 65 (58 completed, 7 extended) | |
| Average schedule slip | 12 months |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 6 Mar 2026 | |
| Building plan | Sanctioned 7 May 2026 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · MG Road | |
| Godrej Woodscapes | about 3 km | Locked |
|---|
| Riqueza Siri | about 3 km | Locked |
|---|
| Sattva Songbird | about 3 km | Locked |
|---|
| Neighbourhood Tree Park | about 3.5 km | Locked |
|---|
| Triaxis Splendour + | about 4 km | Locked |
|---|
| Sowparnika Euphoria in the East | about 4 km | Locked |
|---|
| Definer Upper Deck | about 4.5 km | Locked |
|---|
| Chaithanya Sankhya | about 4.5 km | Locked |
|---|
| One Residences At Sobha One World Ph6 W12,13,14 | about 0.5 km | 31 Aug 2032 | 63% (452 of 721) | Locked |
|---|
| Godrej Parkshire (Hoskote) | about 2 km | 31 Dec 2030 | 54% (614 of 1,132) | Locked |
|---|
| Godrej Woodscapes | about 3 km | 31 Jan 2029 | 100% (2,165 of 2,168) | Locked |
|---|
| Riqueza Siri | about 3 km | 30 Nov 2027 | 52% (66 of 128) | Locked |
|---|
| Projects within 4 km, counted | 42 (42 with an approximate location) | |
|---|---|---|
| Flats in them | 14,956 | |
| Booked | 9,603 of 14,956 (64%) | |
| Unsold | 5,353 | |
| Booked a month, pooled | 281 flats | |
| Months to sell, pooled | 19 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, Dakshina Pinakini, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 7.5 km, Whitefield | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 30.5 | 17.5 |
| MG Road (CBD) | 24 | 21 |
| Manyata Tech Park | 23.5 | 17 |
| ITPL, Whitefield | 13 | 9 |
| Ecospace, Bellandur ORR | 23.5 | 18 |
| Electronic City Ph 1 | 39 | 26.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km, named Hoskote on OpenStreetMap |