Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | 1 | – | 2 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| A B AnanthaActive · 84% built | Amaravathi Builders | Apartment | 753–972 sqft carpet (as filed) | Jan 2027 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) |
Title & ownership
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 64 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 5 cadastral survey plots named in the filing outlined. The outline is the land, not the building. 5 of 7 filed survey numbers matched, 2 found no plot.
| Location & risks | – | 2 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| M/s.Abhee Developers |
| Plot |
| – |
| Completed |
| Abhee PrideCompleted · OC 18-04-2026 | ABHEE VENTURES PRIVATE LIMITED | Apartment | 688–842 sqft carpet (as filed) | Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
8 of 235 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Raj High Gardens in the interactive atlas
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
| Building plan (BMRDA) | Sanctioned 3 Mar 2022 · No. APA CC 164 2017 18 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/091/2023 · issued 5 May 2023 | Clear |
| Environmental clearance | SEIAA 51 CON 2017 · issued 27 Apr 2017 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 1 | |
| RERA completion date | 30 Apr 2028 |
| Land conversion | 7 of 7 parcels converted | |
|---|---|---|
| Sy 46/3C | Converted 5 Oct 2004 · DC Office bangalore | |
| Sy 52/3, 52/4, 54/3 | Converted 10 May 2004 · DC Office, Bengaluru | |
| Sy 51, 51 | Converted 10 May 2004 · Deputy Commissioner, Bengaluru District | |
| Sy 51 | Converted 6 Aug 2011 · Deputy Commissioner, Bengaluru District | |
| Survey numbers | 46/3C · 52/3 · 52/4 · 54/3 · 51 · 51 · 51 |
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
2BHK · avg 52 m² 50.3%2.5BHK · avg 59 m² 39.6%1.5BHK · avg 38 m² 8.9%1BHK 1.2%
| 1BHK | 13 | 5,113 |
| 1.5BHK | 93 | 38,244 |
| 2BHK | 528 | 2,94,824 |
| 2.5BHK | 416 | 2,64,577 |
| Sold, Q2 2026-27 | 533 / 802 | |
|---|---|---|
| Unsold, Q2 2026-27 | 269 |
| Sobha Hamptons -Townpark Phase 1 W4 To 6 | about 0.5 km | Locked | |
|---|---|---|---|
| Sobha Madison Heights-Townpark Phase 1 W5 To 7 | about 0.5 km | Locked | |
| Sobha Madison Heights-Townpark Phase 2 W1 To 4 | about 0.5 km | Locked |
| Raj High Gardens This project | This project is the point the others are measured from | 30 Apr 2028 | 66% (533 of 802) | Not verified yet |
|---|---|---|---|---|
| Sobha Hamptons -Townpark Phase 1 W4 To 6 | about 0.5 km | 30 Jun 2031 | 47% (230 of 492) | Locked |
| Sobha Madison Heights-Townpark Phase 1 W5 To 7 | about 0.5 km | 31 Dec 2030 | 73% (348 of 480) | Locked |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | 73% Residential (main), 17% Parks & open space, 7% Commercial (business) | Review |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 12.0 km, G K LAYOUT | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | 150 m to the north-east, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 30% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.88 (924 covered spaces for 1,050 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | 72% · planned by 11 Dec 2025 | |
|---|---|---|
| Electrical and plumbing finishing | 8% · planned by 5 May 2027 | |
| Internal roads | Not verified yet | |
| Club house | 30% | |
| Completion | 61% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 30 Apr 2028 | |
| RERA completion date | 30 Apr 2028 | |
| Work began, as filed | 1 Jun 2022 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 12 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/091/2023 · issued 5 May 2023 | |
| Environmental clearance | SEIAA 51 CON 2017 · issued 27 Apr 2017 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Chartered accountant, Form 4 | Dated 13 Jul 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹39.50 Cr 8.3%Development · ₹434.75 Cr 91.7%
| Estimated cost | ₹474.25 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹101.86 Cr | |
| Land cost revision | Not verified yet | |
Sold (533) 66.5%Unsold (269) 33.5%
| Sold, Q3 2025-26 | 533 / 802 · 269 available | |
|---|---|---|
| Sold, Q4 2025-26 | 533 / 802 · 269 available | |
| Sold, Q1 2026-27 | 533 / 802 · 269 available | |
| Sold, Q2 2026-27 | 533 / 802 · 269 available | |
| Unsold, Q2 2026-27 | 269 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | STATE BANK OF INDIA · SME JAYANAGAR | |
|---|---|---|
| Designated account, collected | ₹17.26 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹20.28 Cr in Q2 2026-27 | |
| Escrow account to date, Q4 2025-26 | ₹67.18 Cr other deposits, ₹215.59 Cr withdrawn | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 1 | |
| K-RERA registrations under this promoter | 7 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 1 | |
| Complaints filed against the promoter | 1 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BMRDA) | Sanctioned 3 Mar 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · SME JAYANAGAR | |

Map of 1 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: SOBHA Townpark, price locked.
| Signature Heights | about 1 km | Locked |
|---|
| SOBHA Townpark | 1.2 km | Locked |
|---|
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 | about 1.5 km | Locked |
|---|
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 | about 1.5 km | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | about 1.5 km | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | about 1.5 km | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 3, W5 | about 1.5 km | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 4, W4 | about 1.5 km | Locked |
|---|
| Columbia Aaltius | about 2.5 km, to a locality centre | Locked |
|---|
| Sobha Madison Heights-Townpark Phase 2 W1 To 4 | about 0.5 km | 31 Dec 2032 | 84% (540 of 640) | Locked |
|---|
| Signature Heights | about 1 km | 31 Oct 2028 | 51% (178 of 346) | Locked |
|---|
| SOBHA Townpark | 1.2 km | 30 Jun 2033 | 51% (250 of 492) | Locked |
|---|
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 | about 1.5 km | 31 Dec 2026 | 100% (280 of 280) | Locked |
|---|
| Rent, 2BHK, 3 km | ₹22,000 /mo · 8 listings | |
|---|---|---|
| Rent per sq ft, 3 km | ₹23.0 /mo, as listed · 11 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 23 (15 with an approximate location) | |
|---|---|---|
| Flats in them | 13,381 | |
| Booked | 4,265 of 13,381 (32%) | |
| Unsold | 9,116 | |
| Booked a month, pooled | 101 flats | |
| Months to sell, pooled | 90 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 21.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Neralur Grama Panchayati Office) | |
| Nearest city water main | 8.2 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | None within 3 km | |
| Ground level | Not verified yet | |
| Metro, operational | 5.8 km, Bommasandra | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 62.1 | 67 | 45.3 |
| MG Road (CBD) | 28.9 | 35 | 25.0 |
| Manyata Tech Park | 39.5 | 45 | 30.7 |
| ITPL, Whitefield | 28.9 | 35 | 21.5 |
| Ecospace, Bellandur ORR | 26.9 | 32 | 16.0 |
| Electronic City Ph 1 | 11.1 | 13 | 8.1 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.5 km to the east | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.7 km to the south-east, named Attibele on OpenStreetMap |