Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| Akruti ArkLapsed · completion date passed | Akruti Homes Bangalore Private Limited | Apartment | – | Jul 2024 |
| Arun ConstructionsCompleted (regulator flag) | ARUN CONSTRUCTIONS | Apartment | 854 sqft carpet (as filed) | Completed |
| Assetz Canvas & Cove - Phase 1 Wing A & BActive · 100% built | APG HABITAT PRIVATE LIMITED | Apartment | 266–820 sqft carpet (as filed) | Apr 2027 |
| Assetz Canvas & Cove 2.0 - Block AActive · 65% built | APG HABITAT PRIVATE LIMITED | Apartment | 298–1,143 sqft carpet (as filed) | Apr 2029 |
| Assetz Canvas & Cove 2.0 – Block B & CActive · 74% built | APG HABITAT PRIVATE LIMITED | Apartment | 277–1,141 sqft carpet (as filed) | Oct 2028 |
| Aswani SunshineLapsed · completion date passed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 17 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Aswani Properties India Pvt Ltd |
| Apartment |
| 377 sqft carpet (as filed) |
| Jul 2019 |
| Blossom ParkCompleted (regulator flag) | Elita Enterprises LLP | Plot | ~1,200 sqft (estimate: filed carpet plus 25%) | Completed |
| BrindavanLapsed · completion date passed | Sri Krishna Group | Apartment | 575 sqft carpet (as filed) | Dec 2024 |
8 of 64 other projects in Hosur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Signature Splendor in the interactive atlas
Approval or registration
Land use converted
Deputy Commisioner, Bangalore Urban District · Survey 171/1, 171/2A, 171/2B
K-RERA filing, land schedule
Approval or registration
Land use converted
Deputy Commisioner, Bangalore Urban District · Survey 170/1
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · PDO, MARASUR GRAMA PANCHAYATH · Survey 171/1, 171/2A, 171/2B
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · PDO, MARASUR GRAMA PANCHAYATH · Survey 170/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BMRDA · plan STRRPA/TP/CC/260/2021-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/200622/005017
K-RERA registration ·
Approval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 17 May 2022 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 170/1, 171/1, 171/2A, 171/2B | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 19,414 sq m | |
| Khata | E Khatha · PDO, MARASUR GRAMA PANCHAYATH · 30 Dec 2021; E Khatha · PDO, MARASUR GRAMA PANCHAYATH · 2 Dec 2021 | |
| Building plan (BMRDA) | Sanctioned 25 Feb 2022 · No. STRRPA/TP/CC/260/2021-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| Environmental clearance | SEIAA 94 CON 2019 · issued 19 Aug 2019 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2025 |
| Land conversion | 4 of 4 parcels converted | |
|---|---|---|
| Sy 170/1 | Converted 13 Jan 2020 · Deputy Commisioner, Bangalore Urban District | |
| Sy 171/1, 171/2A, 171/2B | Converted 21 Nov 2017 · Deputy Commisioner, Bangalore Urban District | |
| Survey numbers | 170/1 · 171/1 · 171/2A · 171/2B |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Residential 2BHK flats · avg 55 m² 87.1%Residential 3BHK flats · avg 67 m² 8.6%Residential 1BHK flats 4.3%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| Residential 1BHK flats | 20 | 7,599 |
| Residential 2BHK flats | 404 | 2,38,517 |
| Residential 3BHK flats | 40 | 29,020 |
| Pacific Legacy | about 2 km | Locked | |
|---|---|---|---|
| Aydin Infra Signature 3 | about 2.5 km | Locked | |
| Dhiraan Lotus | about 3 km | Locked | |
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 3 km | Locked | |
| Signature Splendor This project | This project is the point the others are measured from | 31 Dec 2025 | Not filed | Not verified yet |
|---|---|---|---|---|
| Pacific Legacy | about 2 km | 31 Dec 2025 | 20% (8 of 40) | Locked |
| Aydin Infra Signature 3 | about 2.5 km | 5 Aug 2027 | 50% (6 of 12) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 0.5 km, Hongasandara Ambedkar Nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.08 (500 covered spaces for 464 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | Completed, occupancy certificate 16 Apr 2024 | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Dec 2025 | |
| RERA completion date | 31 Dec 2025 | |
| Work began, as filed | 1 Apr 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.95 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | SEIAA 94 CON 2019 · issued 19 Aug 2019 | |
| Architect's certificate, registration | Dated 9 May 2022 · site inspected 5 May 2022 | |
| Engineer's certificate, registration | Dated 9 May 2022 | |
| Chartered accountant's certificate, registration | Dated 9 May 2022 | |
Land · ₹14.95 Cr 17.1%Development · ₹72.27 Cr 82.9%
| Estimated cost | ₹87.22 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹72.27 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (464) 100%
| Flats sold, at completion | 464 | |
|---|---|---|
| Flats unsold, at completion | 0 | |
| Flats in the phase | 464 |
| Escrow bank | STATE BANK OF INDIA · AVENUE ROAD BANGALORE | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 8 | |
|---|---|---|
| Marked completed | 6 | |
| Past promised date, not completed | 0 | |
| Complaints filed against the promoter | 2 | |
| Other phases under this promoter name | 7 | |
| With a filed extension or completion | 5 (5 completed, 0 extended) | |
| Average schedule slip | 7 months early |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 17 May 2022 | Review |
| Building plan (BMRDA) | Sanctioned 25 Feb 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · AVENUE ROAD BANGALORE | |
| Abhee Riviera Royale |
|---|
| about 4 km |
| Locked |
| Lodha Azur | about 4.5 km | Locked |
|---|
| Azur Phase 2 | about 4.5 km | Locked |
|---|
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 4.5 km | Locked |
|---|
| Azur Tower D | about 4.5 km | Locked |
|---|
| Assetz Canvas & Cove 2.0 - Block A | about 4.5 km | Locked |
|---|
| Mahindra NewHaven | about 4.5 km | Locked |
|---|
| Assetz Mizumi Reserve Tower A1 A2 A4 | about 5 km | Locked |
|---|
| about 3 km |
| 31 Dec 2027 |
| 56% (20 of 36) |
| Locked |
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 3 km | 30 Dec 2030 | 25% (38 of 150) | Locked |
|---|
| Abhee Riviera Royale | about 4 km | 28 Feb 2027 | 59% (57 of 96) | Locked |
|---|
| Lodha Azur | about 4.5 km | 30 Oct 2029 | 97% (236 of 244) | Locked |
|---|
| Projects within 4 km, counted | 23 (23 with an approximate location) | |
|---|---|---|
| Flats in them | 2,399 | |
| Booked | 1,242 of 2,399 (52%) | |
| Unsold | 1,157 | |
| Booked a month, pooled | 27 flats | |
| Months to sell, pooled | 38 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 0.5 km, Bommanahalli | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 42.5 | 33 |
| MG Road (CBD) | 8 | 7.5 |
| Manyata Tech Park | 19 | 15 |
| ITPL, Whitefield | 22 | 14.5 |
| Ecospace, Bellandur ORR | 9 | 6 |
| Electronic City Ph 1 | 12.5 | 10 |
| Landfill or waste transfer station | about 3 km to the south-east, named Karnataka Compost Development Centre - KCDC on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 1 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named 220/33kV GIS Sub Station, Central Silk Board on OpenStreetMap |