Environmental clearanceIssued 21 May 2019Filed as SEIAA, p. 1
2 pagesAvailable
2 pagesAvailable
13 pagesAvailable
1 pageAvailable
5 pagesAvailable
30 pagesAvailable
3 pagesAvailable
K-RERA only
1 pageAvailable
2 pages4 factsAvailable
1 pageAvailable
2 pagesAvailable
2 pagesAvailable
14 pages2 factsAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
K-RERA only
K-RERA only
K-RERA only
K-RERA only
Source: K-RERA project page and the documents filed there, as read by us. 7 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Contract & costs, Title & ownership and Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Sipani Viveza is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
Not verified yet
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
Not verified yet
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
Approval letters
Building plan (BDA)
Not verified yet
Power NOC (BESCOM)
Filed with the registration
Fire NOC
Filed with the registration
Environmental clearance
SEIAA 34 CON 2019 · issued 21 May 2019
✓Clear
Airport height NOC
NOC ID BANG/SOUTH/B/061218/312988 · issued 2 Jul 2018 · permissible top elevation 1008.07 m above mean sea level · validity ended 1 Jul 2026
Pollution board (CFE)
Filed with the registration
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA complaints
1
RERA completion date
Not verified yet
Registration certificates
PRM/KA/RERA/1251/308/PR/190809/002757
Land use
Conversion order
Not verified yet
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Payments
Payment plan
Not verified yet
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
about 0.5 km from the locality centre, an unnamed pond
Height above nearest drain
Not verified yet
Amenities
Specification and Form 5
Not verified yet
Around it
Water
Groundwater, Anekal taluk average
Ten-year July mean for this taluk: 28.7 m
Across Anekal, the water table sat 21.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 28.7 m, and it recovered 3.3 m over the year.
Water at a glance
Groundwater
Anekal taluk average, July 2023: 21.3 m below ground
What it means
Not verified yet
Water below ground
21.3 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Self development
Nearest city water main
Not verified yet
Distances
Measured from the site
Height above nearest drain
Not verified yet
Nearest drain
None within 3 km of the locality centre
Ground level
Not verified yet
Metro, operational
Not verified yet
Metro, under construction
Not verified yet
Connectivity
Road distance from the site
Not verified yet
Six city anchors · OSRM, no traffic
Not verified yet
Nuisances
Distance from the site
Locality only filed: no distance from the site to show
DOSL nuisance layer
Landfill or waste transfer station
None within 3 km of the locality centre
Sewage treatment plant
None within 3 km of the locality centre
Quarry
None within 3 km of the locality centre
Crematorium
None within 3 km of the locality centre
Prison
None within 3 km of the locality centre
Electrical substation
about 1.5 km from the locality centre, named Attibele on OpenStreetMap
Lapsed
Dates
Dates
Filed dates
Possession, agreement
Not verified yet
Schedule end
30 Nov 2024
RERA completion date
Not verified yet
Work began, as filed
16 Dec 2019
Specified structure
What the promoter specified · not an inspection
Not verified yet
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.