Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| AlcazarRegistered · no quarterly update yet | PANTHEON ONE | Apartment | 1,751–2,380 sqft carpet (as filed) | Mar 2024 |
| Brigade Legacy | Brigade Group | Apartment | 2,156–3,000 sqft | – |
| CharisCompleted (regulator flag) | Lewis Infrastructure and Projects | Apartment | – | Completed |
| Chartered Karthika | Chartered Housing | Apartment | 2,361 sqft | – |
| Donata VistaCompleted · OC 22-03-2024 | Sanjeev Wahi | Apartment | 1,310 sqft carpet (as filed) | Completed |
| El RoiActive · 82% built | LEWIS INFRASTRUCTURE AND PROJECTS | Apartment | 1,382 sqft carpet (as filed) | Mar 2028 |
| Koncept Ambience DowntownExtended to 31-12-2026 | Koncept Ambience | Apartment |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 31 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 2,477–3,131 sqft |
| Dec 2026 |
| LapazExtended to 20-03-2027 | SANTOSH GLEN LEWIS | Apartment | 527–947 sqft carpet (as filed) | Mar 2027 |
8 of 21 other projects in Frazer Town, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open The Arbour Residences in the interactive atlas
Transfer of the land
Sale deed
in favour of F4 ESTATES LLP & GCORP HOUSING PRIVATE LIMITED · Survey 2085258240
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · BBMP · Survey 2085258240
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan GBA/BNCC/0798/25-26IN
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/290426/008607
K-RERA registration ·
Transfer of the landTitle checkApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 21 Jul 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: Approved Sketch by CTS Dept, 1 page, not in English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 2085258240 | |
|---|---|---|
| Land extent, Sy 2085258240 | 1,342 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 1,287 sq m | |
| Khata | E Khatha · BBMP · 11 Aug 2025 | |
| Sale deed | Dated 18 Jul 2025 | |
| Sale deed in favour of | F4 ESTATES LLP & GCORP HOUSING PRIVATE LIMITED | |
| Building plan (BBMP) | Sanctioned 10 Mar 2026 · No. GBA/BNCC/0798/25-26IN | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Oct 2028 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 2085258240 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK type 1 · avg 152 m² 37.5%4 BHK + Servant Room 18.8%3BHK type 2 12.5%3BHK type 1 ph · 152 m² 6.3%4 other types 25%
| 3 BHK Smart | 1 | 1,292 |
| 3BHK type 1 | 6 | 9,817 |
| 3BHK type 1 ph | 1 | 1,636 |
| 3BHK type 2 | 2 | 3,294 |
| 3BHK type 2 ph | 1 | 1,636 |
| 3BHK type 3 ph | 1 | 1,647 |
| 4 BHK + Servant Room | 3 | 6,717 |
| 4BHK ph | 1 | 2,239 |
| Sold, Q2 2026-27 | 2 / 16 | |
|---|---|---|
| Unsold, Q2 2026-27 | 14 | |
| Months to sell, derived from filed bookings | Too few bookings to project (1 flat booked in 3 months) |
| Magnolia Delight | about 3.5 km | Locked | |
|---|---|---|---|
| Ranka Iris | about 4 km | Locked | |
| Legacy Saviero | about 5 km | Locked | |
| Lodha Mirabelle | about 5.5 km | Locked | |
| Mirabelle Phase 2 | about 5.5 km | Locked |
| The Arbour Residences This project | This project is the point the others are measured from | 30 Oct 2028 | 13% (2 of 16) | Not verified yet |
|---|---|---|---|---|
| Magnolia Delight | about 3.5 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Ranka Iris | about 4 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Legacy Saviero | about 5 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 0.5 km, Cox town | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 1 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Gym, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 2.31 (37 covered spaces for 16 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 26.8 m
Across Bengaluru North, the water table sat 22.7 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 26.8 m, and it fell 4.9 m over the year.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.7 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
As the promoter reported itPossession date in the agreement
| Main structure | 5% · planned by 30 Jan 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 28 Feb 2027 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 29% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 30 Oct 2028 | |
|---|---|---|
| Schedule end | 30 Oct 2028 | |
| RERA completion date | 30 Oct 2028 | |
| Work began, as filed | 11 Apr 2026 |
| Structure | RCC framed structure | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.99 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Wooden flooring | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Fire-resistant copper wiring | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 13 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jul 2026, Oct 2026 (2 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jul 2026, Oct 2026 (2 filed) | |
| Architect's certificate, registration | Dated 25 Mar 2026 · site inspected 23 Mar 2026 | |
| Engineer's certificate, registration | Dated 12 Mar 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹25.05 Cr 70.2%Development · ₹10.64 Cr 29.8%
| Estimated cost | ₹35.69 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹7.12 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (2) 12.5%Unsold (14) 87.5%
| Sold, Q1 2026-27 | 1 / 16 · 15 available | |
|---|---|---|
| Sold, Q2 2026-27 | 2 / 16 · 14 available | |
| Unsold, Q2 2026-27 | 14 | |
| Sold in Q2 2026-27 | 1 |
| Escrow bank | HDFC · MG ROAD | |
|---|---|---|
| Designated account, collected | ₹3.55 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹3.55 Cr in Q2 2026-27 (100% of that quarter's deposits) | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 21 Jul 2025 | |
| Building plan (BBMP) | Sanctioned 10 Mar 2026 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · MG ROAD | |
| Century Regalia (Project 2) | about 5.5 km | Locked |
|---|
| Vkk Grand | about 5.5 km | Locked |
|---|
| Vista Svara | about 6.5 km | Locked |
|---|
| Brr North Excellency Phase I | about 6.5 km | Locked |
|---|
| Renaissance Srichakra | about 6.5 km | Locked |
|---|
| Sumadhura Solea | about 7 km | Locked |
|---|
| Sumadhura Epitome | about 7 km | Locked |
|---|
| 30 Jun 2027 |
| 45% (43 of 96) |
| Locked |
| Lodha Mirabelle | about 5.5 km | 30 Jun 2028 | 96% (418 of 437) | Locked |
|---|
| Mirabelle Phase 2 | about 5.5 km | 31 May 2030 | 61% (173 of 284) | Locked |
|---|
| Century Regalia (Project 2) | about 5.5 km | 28 Feb 2030 | 63% (80 of 128) | Locked |
|---|
| Projects within 4 km, counted | 17 (17 with an approximate location) | |
|---|---|---|
| Flats in them | 481 | |
| Booked | 184 of 481 (38%) | |
| Unsold | 297 | |
| Booked a month, pooled | 5 flats | |
| Months to sell, pooled | 57 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 1.5 km, Tannery Road | |
| Kempegowda Airport | 30 | 23.5 |
| MG Road (CBD) | 5.5 | 4 |
| Manyata Tech Park | 6 | 5 |
| ITPL, Whitefield | 16 | 12.5 |
| Ecospace, Bellandur ORR | 17.5 | 10.5 |
| Electronic City Ph 1 | 25.5 | 19 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1.5 km, named Halasuru 2MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | about 1.5 km, named Kalpalli Cemetery Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Raheja Mansion Substation on OpenStreetMap |