Developer's project loanSun Reality Developers Unipatch Rubber Ltd Vistaspaces Assets LLP · ₹8.35 Cr disbursedAs declared in the K-RERA filing
Value & LTV
3BHK A
Not verified yet
Calculation
Not verified yet
Conditions
Collateral checks
Data room
Documents filed for this project
Documents filed170On K-RERA
Available15994% of filed
K-RERA only11
Approvals with a validity date1Validity ended
Approvals & NOCs
What we read
Fire NOCKSFES/NOC/495/2017Filed as Fire NOC, pp. 1, 3
Fire NOCbuilding height 26.94 mFiled as Fire NOC, pp. 1, 3
Airport height NOCValidity ended 31 Aug 2025Issued 1 Sep 2017
Available
Available
4 pagesAvailable
15 pagesAvailable
4 pagesAvailable
K-RERA only
K-RERA only
K-RERA only
K-RERA only
8 pagesAvailable
K-RERA only
1 pageAvailable
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
K-RERA only
50 pages2 factsAvailable
4 pages2 factsAvailable
Filed 13 Jun 20222 pagesAvailable
Filed 13 Jun 20224 pagesAvailable
Filed 13 Jun 20222 pagesAvailable
Available
Available
Available
4 pagesAvailable
15 pagesAvailable
4 pagesAvailable
50 pagesAvailable
8 pagesAvailable
1 pageAvailable
Source: K-RERA project page and the documents filed there, as read by us. 56 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Valuation, Contract & costs, Title & ownership and Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Survey plots, KGIS cadastral
Road, stream, tank or settlement (not a plot)
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Vista Svara in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Not verified yet
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Joint development agreement
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
Approval letters
Building plan (BBMP)
Sanctioned 1 Feb 2020 · No. BBMP/Addl.Dir/JD South/0099/17-18
Power NOC (BESCOM)
Filed with the registration
Fire NOC
KSFES/NOC/495/2017 · building height 26.94 m
✓Clear
Environmental clearance
Filed with the registration
Airport height NOC
issued 1 Sep 2017 · validity ended 31 Aug 2025
Pollution board (CFE)
Filed with the registration
Water supply NOC
Filed with the registration
RERA
K-RERA
RERA extensions
None on the filing
RERA complaints
0
RERA completion date
30 Oct 2026
Registration certificates
PRM/KA/RERA/1251/310/PR/130722/005068
Land use
Conversion order
Land conversion
Declared not converted
Survey numbers
PID No.118-W0064-37 (OLD PID N
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Payments
Payment plan
•• %
•• %
•• %
•• %
•• %
Agreement for sale
Not verified yet
Fees
Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Form 4 certified totals
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Unit sizes
Carpet vs rest, by type
Not verified yet
Unit mix filed
Unit types
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Floor plans, brochure
Not verified yet
Unsold stock
K-RERA inventory
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Registered deeds
Transactions in this project
Not verified yet
The area
Price trend
North Bengaluru, past yearNot verified yet
Bengaluru, past yearNot verified yet
North since 2022Not verified yet
This project vs North BengaluruNot verified yet
Price per sq ft, super built-up
Not verified yet
By quarter
Not verified yet
Registered sales around
Registered sale price per sq ft, by year
Not verified yet
Transactions around this project
Not verified yet
Comparable projects
Carpet price, projects within 4 km
Not verified yet
Filed prices nearby
Not verified yet
Nearest 12 with filed prices
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
Nearest projects
This project vs the nearest with filed prices
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Rent & yield
Median rent, 3 km
Not verified yet
Gross yield
Not verified yet
Rents and yields
Not verified yet
Unsold stock nearby
Months to sell unsold stock
•• %
•• %
•• %
•• %
•• %
K-RERA inventory
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
Unlock this full report
₹99 for this report opens Valuation, Contract & costs, Title & ownership and Disputes & cases for this project, yours to read for good.
Zoning & hazards
Power lines, drains and flood locations around the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400 and 66 kV
Its corridor, to scale
Buried cable
Storm drain, primary
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Drains, lakes and flood locations around the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, primary
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot
Electricity · CCTV Surveillance · Gym · Power Backup
Electricity, built
0%
Gym, built
0%
Kitchen handover
Not verified yet
Covered parking per unit
0.28 (10 covered spaces for 36 units)
Sewage plant
Not verified yet
Power backup
Declared by the promoter
Around it
Water
Groundwater, Bengaluru North taluk average
Ten-year July mean for this taluk: 26.8 m
Across Bengaluru North, the water table sat 22.7 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 26.8 m, and it fell 4.9 m over the year.
Water at a glance
Groundwater
Bengaluru North taluk average, July 2023: 22.7 m below ground
What it means
Not verified yet
Water below ground
22.7 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
BWSSB, Other
Nearest city water main
Not verified yet
Distances
Within 3 km of the filed pin
Connectivity
Road distance from the site
Nuisances
Distance from the filed pin
As the promoter reported it
Site photos filed with K-RERA, Q2 2026-27
Work left
By component, Q2 2026-27
Quarterly return, Q2 2026-27
Main structure
100% · planned by 30 Oct 2023
Electrical and plumbing finishing
40% · planned by 30 Mar 2025
Internal roads
Not verified yet
Club house
Not verified yet
Completion
81%
Completion, accountant
87.6% of the estimated cost spent
Dates
Dates
Filed dates
Possession, agreement
Not verified yet
Schedule end
30 Apr 2026
RERA completion date
30 Oct 2026
Work began, as filed
4 Jan 2022
Specified structure
What the promoter specified · not an inspection
Structure
RCC framed structure
Foundation
Not verified yet
Wall material
Not verified yet
Wall thickness
Not verified yet
Concrete / steel grade
Not verified yet
Building heights, fire NOC
26.94 m on the fire NOC
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Government-flagged flood location
Approximate location: the filed pin, good to the neighbourhood, not the plot