Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 27 SummitLapsed · completion date passed | Nestled Haven Developers LLP | Apartment | 3,697–3,799 sqft carpet (as filed) | Nov 2025 |
| 32 RichmondCompleted (regulator flag) | EDGAR BRITTO | Apartment | 574–1,378 sqft carpet (as filed) | Completed |
| Cascadia By Tvs EmeraldActive · 27% built | M/s. Emerald Haven Realty Limited | Apartment | 1,473–3,584 sqft carpet (as filed) | Aug 2030 |
| Century RenataCompleted (regulator flag) | Century Real Estate | Apartment | 2,760–5,335 sqft | Completed |
| Chowriappa InfinityLapsed · completion date passed | CHOWRIAPPA CONSTRUCTIONS PVT. LTD. | Apartment | – | Dec 2018 |
| EllenLapsed · completion date passed | Ubernest Developers LLP | Apartment | – | Sep 2022 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 32 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Gm PalazzoRegistered · no quarterly update yet | GULAM MUSTAFA | Apartment | 1,648 sqft carpet (as filed) | Mar 2028 |
| Grandus Quiet WoodsCompleted · OC 23-05-2023 | Grandus Infra Projects Pvt Ltd | Apartment | 1,507 sqft carpet (as filed) | Completed |
8 of 20 other projects in Richmond Town, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Blar 21 in the interactive atlas
Transfer of the land
Sale deed
Survey 70/9-21
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Bengaluru City Central Corporation · Survey 70/9-21
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Ad.Com./EST/0858/24-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/140526/008655
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 17 Feb 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 70-9-21 | |
|---|---|---|
| Land extent, Sy 70-9-21 | 1,380 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 1,380 sq m | |
| Khata | A Khatha · Bengaluru City Central Corporation · 2 Aug 2021 | |
| Sale deed | Dated 7 Nov 2019 | |
| Building plan (BBMP) | Sanctioned 31 Dec 2025 · No. BBMP/Ad.Com./EST/0858/24-25 | |
|---|---|---|
| Power NOC (BESCOM) | Not verified yet | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 29 Feb 2032 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 70-9-21 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
4BHK · avg 259 m² 60%3BHK 40%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 3BHK | 4 | 7,147 |
| 4BHK | 6 | 16,749 |
| Sold, Q2 2026-27 | 0 / 10 | |
|---|---|---|
| Unsold, Q2 2026-27 | 10 |
| Vista Svara | about 1 km | Locked | |
|---|---|---|---|
| Ranka Iris | about 4.5 km | Locked | |
| Century Regalia (Project 2) | about 5.5 km | Locked | |
| Vista Padmalaya | about 5.5 km | Locked | |
| Adarsh Premia | about 6 km | Locked |
| Blar 21 This project | This project is the point the others are measured from | 29 Feb 2032 | 0% (0 of 10) | Not verified yet |
|---|---|---|---|---|
| Vista Svara | about 1 km | 30 Oct 2026 | 50% (16 of 32) | Locked |
| Ranka Iris | about 4.5 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Century Regalia (Project 2) | about 5.5 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 0.5 km, Micheal church | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, K100 | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity | |
|---|---|---|
| Electricity, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 3.30 (33 covered spaces for 10 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Not declared | |
Ten-year July mean for this taluk: 26.8 m
Across Bengaluru North, the water table sat 22.7 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 26.8 m, and it fell 4.9 m over the year.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.7 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
As the promoter reported itPossession date in the agreement
| Main structure | Not started · planned by 5 Jul 2029 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 5 Oct 2030 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 4% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 29 Feb 2032 | |
|---|---|---|
| Schedule end | 31 Dec 2031 | |
| RERA completion date | 29 Feb 2032 | |
| Work began, as filed | 1 Feb 2026 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.99 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Not provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jul 2026, Oct 2026 (2 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jul 2026, Oct 2026 (2 filed) | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹17.58 Cr 39.2%Development · ₹27.29 Cr 60.8%
| Estimated cost | ₹44.86 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Unsold (10) 100%
| Sold, Q1 2026-27 | 0 / 10 · 10 available | |
|---|---|---|
| Sold, Q2 2026-27 | 0 / 10 · 10 available | |
| Unsold, Q2 2026-27 | 10 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | KOTAK MAHINDRA BANK · RVCOLLEGE OF ENGINEERING BANGALORE | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 17 Feb 2025 | |
| Building plan (BBMP) | Sanctioned 31 Dec 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | KOTAK MAHINDRA BANK · RVCOLLEGE OF ENGINEERING BANGALORE | |
| Aydin Infra Signature 3 | about 6 km | Locked |
|---|
| Renaissance Srichakra | about 6 km | Locked |
|---|
| Pacific Legacy | about 7 km | Locked |
|---|
| Birla Tisya | about 7 km | Locked |
|---|
| Magnolia Delight | about 7 km | Locked |
|---|
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 7 km | Locked |
|---|
| Song Of Wind | about 7.5 km | Locked |
|---|
| 28 Feb 2030 |
| 63% (80 of 128) |
| Locked |
| Vista Padmalaya | about 5.5 km | 30 Apr 2027 | 40% (4 of 10) | Locked |
|---|
| Adarsh Premia | about 6 km | 31 Mar 2027 | 55% (182 of 330) | Locked |
|---|
| Aydin Infra Signature 3 | about 6 km | 5 Aug 2027 | 50% (6 of 12) | Locked |
|---|
| Projects within 4 km, counted | 14 (14 with an approximate location) | |
|---|---|---|
| Flats in them | 658 | |
| Booked | 435 of 658 (66%) | |
| Unsold | 223 | |
| Booked a month, pooled | 2 flats | |
| Months to sell, pooled | 86 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 1 km, Langford Town | |
| Kempegowda Airport | 38 | 29 |
| MG Road (CBD) | 5 | 2 |
| Manyata Tech Park | 13.5 | 9.5 |
| ITPL, Whitefield | 22 | 15.5 |
| Ecospace, Bellandur ORR | 14 | 10 |
| Electronic City Ph 1 | 18 | 16 |
| Landfill or waste transfer station | about 2 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Cubbon Park 4MLD Sewage Treatment Planet on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named BMTC Substation on OpenStreetMap |