Are there court cases or buyer complaints on this project?
Locked
Cases on the landNot checked
Cases on the builderNot checked
RERA complaints1 case
Builder's other projectsNo cases
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
Contract & costs
What does a buyer commit to?
We haven't verified this for this project yet.
Sign in first, then it is one click.
Forfeiture, agreementNot verified yet
Forfeiture, allotment letterNot verified yet
Transfer feeNot verified yet
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Not verified yet
Payments
Payment plan
Not verified yet
Agreement for sale
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Recent price, super built-upNot verified yet
Recent price, carpetNot verified yet
Phase 1 → Phase 2Not verified yet
Gross yield, per sq ftNot verified yet
This project
Price
Price per sq ft, super built-up
Location & risks
What is the location like?
Height above nearest drainNot verified yet
Groundwater, taluk average16.9 m below groundBengaluru South taluk, July 2023
Water supply, as filedLocal authorityDeclared by the promoter
Metro, operational1.2 kmElectronic City
The site
Zoning & hazards
Construction & progress
How is it being built, and when will it be ready?
CompletionCompleted
Possession, agreementNot verified yet
StructureRCC framed structureAs specified
Structural safety certificateNot verified yet
Progress
Completion, architect
Completed
Work left
By component
Completed
Developer
Can the developer deliver?
Receivable, sold flatsNot verified yet
Cost leftNot verified yet
SoldCompleted
Sold in the latest quarterCompleted
Funding
Estimated cost
Not verified yet
Cost left vs buyer dues
Not verified yet
Form 4
Loan & collateral
Can it be financed?
Value, 3BHK ANot verified yet
Max loan, 3BHK ANot verified yet
Borrower marginNot verified yet
Developer's project loanNot verified yet
Value & LTV
3BHK A
Not verified yet
Calculation
Not verified yet
Conditions
Collateral checks
Data room
Documents filed for this project
Documents filed53On K-RERA
Available53100% of filed
K-RERA only0
Approvals with a validity dateNone read
Approvals & NOCs
2 pagesAvailable
5 pagesAvailable
6 pagesAvailable
2 pagesAvailable
Source: K-RERA project page and the documents filed there, as read by us. 5 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Alpine Square in the interactive atlas
Not verified yet
Charges
Not verified yet
Boundaries
Schedule in the EC vs KGIS neighbours
Side
Schedule in the EC
KGIS neighbours
North
EC schedule not read yet
Survey 44 (Doddanagamangala)
East
EC schedule not read yet
Survey 45 (Doddanagamangala)
South
EC schedule not read yet
Survey 36 (Doddanagamangala)
West
EC schedule not read yet
Survey 40, 42, 43 (Doddanagamangala)
Encumbrance certificate filed with K-RERA
Page 1
Page 1 of 11 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate, 11 pages.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
Water at a glance
Groundwater
Bengaluru South taluk average, July 2023: 16.9 m below ground
What it means
Not verified yet
Water below ground
16.9 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Local authority
Nearest city water main
640 m
Distances
Within 3 km
Connectivity
Road distance from the site
Nuisances
Distance from the site
Quarterly return
Completed
Dates
Dates
Filed dates
Possession, agreement
Not verified yet
Schedule end
5 Nov 2018
RERA completion date
21 Jun 2019
Work began, as filed
15 Apr 2016
Specified structure
What the promoter specified · not an inspection
Structure
RCC framed structure
Foundation
Not verified yet
Wall material
Not verified yet
Wall thickness
Not verified yet
Concrete / steel grade
Not verified yet
Building heights, fire NOC
Not verified yet
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Map of 7 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Assetz Mizumi Reserve Tower A1 A2 A4, price locked; Assetz Ren & Rei, price locked; Mahindra Zen, price locked; K&T's Sai Sannidhi, price locked; Mahindra NewHaven, price locked; Birla Evara, price locked; Assetz Canvas & Cove 2.0 - Block A, price locked.
This project
Padlock: that project's price is part of its own report