Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Abhee AariaActive · 23% built | Abhee Ventures | Apartment | 709–2,500 sqft | May 2031 |
| Adarsh PrimroseActive · 18% built | Adarsh Developers | Apartment | 1,770–1,880 sqft | Sep 2028 |
| Disha Pursuit of the Elements Phase 1Active · 73% built | Dishahabitat Projects LLP | Apartment | 452–2,380 sqft carpet (as filed) | Dec 2027 |
| DSR Parkway (Phase 2)Lapsed · completion date passed | DSR INFRASTRUCTURE PVT LTD | Apartment | 419–1,073 sqft carpet (as filed) | Oct 2025 |
| DSR Parkway (Phase-1)Lapsed · completion date passed | DSR INFRASTRUCTURE PVT LTD | Apartment | 815–1,030 sqft carpet (as filed) | Jul 2024 |
| Myhna MeadowsLapsed · completion date passed | Ms Myhna Properties Pvt Ltd | Plot | – | Dec 2022 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Myhna OrchidActive · 33% built | MYHNA ESTATE PROJECTS | Apartment | 772–1,022 sqft carpet (as filed) | Dec 2027 |
| Myhna VistaraActive · 4% built | MYHNA PROPERTIES PRIVATE LIMITED | Apartment | – | Dec 2030 |
8 of 14 other projects in Gunjur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Candeur Icon Phase I in the interactive atlas
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Adarsh Park Heights Phase-2 | about 0.5 km | Locked | |
|---|---|---|---|
| Poetry Of Earth | about 1 km | Locked | |
| SOBHA Ayana | about 1.5 km | Locked | |
| Inspira Infinity | about 1.5 km | Locked | |
| Sobha Sentosa Phase 1 Wing 7 | about 1.5 km |
| Candeur Icon Phase I This project | This project is the point the others are measured from | Not on the filing | Not filed | Not verified yet |
|---|---|---|---|---|
| Adarsh Park Heights Phase-2 | about 0.5 km | 31 May 2027 | 95% (471 of 494) | Locked |
| Poetry Of Earth | about 1 km | 31 Dec 2028 | 23% (65 of 282) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, Gunjur | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Not verified yet | |
| Nearest city water main | Not verified yet | |
| Locked |
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 1.5 km | Locked |
|---|
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 1.5 km | Locked |
|---|
| Sobha Sentosa Phase 4 Wing 1 And 2 | about 1.5 km | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | about 2 km | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22 | about 2 km | Locked |
|---|
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58 | about 2 km | Locked |
|---|
| SOBHA Neopolis | about 2.5 km | Locked |
|---|
| SOBHA Ayana | about 1.5 km | 31 Dec 2031 | 62% (426 of 683) | Locked |
|---|
| Inspira Infinity | about 1.5 km | 31 Jan 2029 | 95% (100 of 105) | Locked |
|---|
| Sobha Sentosa Phase 1 Wing 7 | about 1.5 km | 30 Jun 2026 | 100% (71 of 71) | Locked |
|---|
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 1.5 km | 31 Dec 2026 | 99% (140 of 142) | Locked |
|---|
| Projects within 4 km, counted | 86 (86 with an approximate location) | |
|---|---|---|
| Flats in them | 35,161 | |
| Booked | 20,270 of 35,161 (58%) | |
| Unsold | 14,891 | |
| Booked a month, pooled | 558 flats | |
| Months to sell, pooled | 26 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 5 km, Kodibeesanahalli | |
| Kempegowda Airport | 42 | 30.5 |
| MG Road (CBD) | 19.5 | 16 |
| Manyata Tech Park | 23.5 | 18.5 |
| ITPL, Whitefield | 9 | 6.5 |
| Ecospace, Bellandur ORR | 8.5 | 6 |
| Electronic City Ph 1 | 19.5 | 11.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2.5 km to the north-west, named Bellandur Amani 90MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |