Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | 1 | – | 2 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 15 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | 1 | – | – | Red flag |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adarsh ParadiseActive · 87% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
| Adithya RicaCompleted (regulator flag) | ADITHYA CONSTRUCTIONS | Apartment | 769 sqft carpet (as filed) | Completed |
8 of 264 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Casagrand Galileo in the interactive atlas
Approval or registration
Land use converted
Special Deputy Commissioner, Bengaluru District, Bengaluru · Survey 61/2
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 61/2
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Consideration ₹21.61 Cr
Title deed filed with K-RERA, pp. 1, 7 · See it in Documents
Transfer of the land
Sale deed
in favour of M/s CASA GRANDE CITY GARDEN CITY BUILDERS PVT LTD · Survey 61/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan PRJ/5767/21-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/070222/004675
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | Indian Realty Excellence · ₹21.30 Cr disbursed | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 61/2 | |
|---|---|---|
| Land extent, Sy 61/2 | 1 Acre 25.08 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 6,496 sq m | |
| Khata | A Khatha · BBMP · 11 Feb 2021 | |
| Sale deed | Dated 20 Jul 2021 | |
| Sale deed in favour of | M/s CASA GRANDE CITY GARDEN CITY BUILDERS PVT LTD | |
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 20 Jan 2022 · No. PRJ/5767/21-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/211/2021 · issued 16 Nov 2021 | Clear |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | issued 10 Nov 2021 · valid until 9 Nov 2029 | Clear |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 27 Jan 2022 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 4 | |
| RERA completion date | 7 Feb 2025 |
| Land conversion | Converted 5 Aug 2013 · Special Deputy Commissioner, Bengaluru District, Bengaluru | |
|---|---|---|
| Survey numbers | 61/2 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK 66.3%2BHK 17.3%4BHK 16.3%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2BHK | 18 | Not filed |
| 3BHK | 69 | Not filed |
| 4BHK | 17 | Not filed |
| Assetz Sun & Sanctum - Phase 2 | about 2 km | Locked | |
|---|---|---|---|
| 2g Tula | about 3 km | Locked | |
| Garuda Grand | about 3.5 km | Locked | |
| Legacy Saviero | about 4 km | Locked | |
| Vaswani Starlight | about 5.5 km | Locked |
| Casagrand Galileo This project | This project is the point the others are measured from | 7 Feb 2025 | Not filed | Not verified yet |
|---|---|---|---|---|
| Assetz Sun & Sanctum - Phase 2 | about 2 km | 31 Jul 2026 | 100% (70 of 70) | Locked |
| 2g Tula | about 3 km | 27 Dec 2027 | 68% (173 of 256) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 0.5 km, Devasandra (Nethravathi Badavane) | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, K.R Turam Santhekere | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.78 (81 covered spaces for 104 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 29 Jan 2023 | |
| RERA completion date | 7 Feb 2025 | Red flag |
| Work began, as filed | 20 Mar 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 60.4 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/211/2021 · issued 16 Nov 2021 | |
| Environmental clearance | Filed with the registration | |
| Architect's certificate, registration | Site inspected 22 Jan 2022 | |
| Engineer's certificate, registration | Dated 22 Jan 2022 | |
| Chartered accountant's certificate, registration | Dated 22 Jan 2022 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹23.68 Cr 32.2%Development · ₹49.83 Cr 67.8%
| Estimated cost | ₹73.50 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹49.83 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | ICICI Bank · ULSOOR ROAD | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 4 | |
| K-RERA registrations under this promoter | 19 | |
|---|---|---|
| Marked completed | 3 | |
| Past promised date, not completed | 8 | |
| Complaints filed against the promoter | 167 | |
| Other phases under this promoter name | 18 | |
| With a filed extension or completion | 3 (2 completed, 1 extended) | |
| Average schedule slip | 9 months |
| Developer's project loan | Indian Realty Excellence · ₹21.30 Cr disbursed | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 20 Jan 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · ULSOOR ROAD | |
| Vkk Grand | about 6 km | Locked |
|---|
| Godrej Splendour | about 6 km | Locked |
|---|
| Godrej Splendour Phase II | about 6 km | Locked |
|---|
| Coevolve Misty Shores | about 6 km | Locked |
|---|
| Assetz Bloom & Dell - Phase 2 | about 6 km | Locked |
|---|
| Axis Ekatva | about 6 km | Locked |
|---|
| SOBHA Victoria Park Phase 1 | about 6.5 km | Locked |
|---|
| about 3.5 km |
| 31 Mar 2028 |
| 41% (56 of 136) |
| Locked |
| Legacy Saviero | about 4 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
|---|
| Vaswani Starlight | about 5.5 km | 31 Dec 2029 | 43% (115 of 269) | Locked |
|---|
| Vkk Grand | about 6 km | 30 Jun 2027 | 49% (59 of 120) | Locked |
|---|
| Projects within 4 km, counted | 34 (34 with an approximate location) | |
|---|---|---|
| Flats in them | 6,772 | |
| Booked | 4,390 of 6,772 (65%) | |
| Unsold | 2,382 | |
| Booked a month, pooled | 52 flats | |
| Months to sell, pooled | 46 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 1 km, Mahadevapura | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 34 | 21.5 |
| MG Road (CBD) | 12 | 10.5 |
| Manyata Tech Park | 11.5 | 9 |
| ITPL, Whitefield | 8.5 | 5.5 |
| Ecospace, Bellandur ORR | 12.5 | 9 |
| Electronic City Ph 1 | 27 | 19 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km | |
| Quarry | about 1.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named ITI on OpenStreetMap |