Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 4 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 60 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. 1 of 3 filed survey numbers matched, 2 found no plot.
| – |
| Not verified |
| Location & risks | – | 1 | – | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 1 | Clear |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 379 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Desai Empire in the interactive atlas
Covers 44/2 only
Transfer of the land
Sale deed
in favour of DESAI Developers · Survey 44/2
K-RERA filing, land schedule
Covers 44/1 only
Transfer of the land
Sale deed
in favour of Desai Developers · Survey 44/1, 43/1
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of Desai Developers · Survey 44/1, 43/1
K-RERA filing, land schedule
Approval or registration
Land use converted
DC · Survey 44/1, 43/1, 44/2
K-RERA filing, land schedule
Approval or registration
Land use converted
DC · Survey 44/1, 43/1, 44/2
K-RERA filing, land schedule
Covers 44/1 only
Approval or registration
Khata issued
A Khatha · BBMP · Survey 44/1, 43/1
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 44/1, 43/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDNORTH/0108/22-23
K-RERA filing, approvals
Covers 44/2 only
Approval or registration
Khata issued
A Khatha · 1 · Survey 44/2
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/180124/006559
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 2 Dec 2023 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. 1 of 3 filed survey numbers matched, 2 found no plot.
| Survey numbers | 44/1, 43/1, 44/2 | |
|---|---|---|
| Land extent, Sy 44/1 | 1 Acre 24 Guntas | |
| Land extent, Sy 43/1 | 15 Guntas | |
| Land extent, Sy 44/2 | 3 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 8,372 sq m | |
| Khata | A Khatha · BBMP · 17 Feb 2023; A Khatha · 1 · 12 Dec 2023 | |
| Sale deed | Dated 29 Oct 2021, 29 Aug 2022 | |
| Sale deed in favour of | Desai Developers, DESAI Developers | |
| Survey | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|
| Sy. No. 44/1 | 4 | 2 acres 18 guntas | 1 acre 24 guntas | Differs: 34 guntas apart | 0 |
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 9 Nov 2023 · No. BBMP/Addl.Dir/JDNORTH/0108/22-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/381/2022 · issued 22 Nov 2022 | Clear |
| Environmental clearance | SEIAA 157 CON 2022 · EC identification no. EC23B000KA173968 · issued 25 Jan 2023 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-334381 · issued 16 Nov 2022 · valid until 4 Nov 2027 | Clear |
| Water and sewerage NOC (BWSSB) | issued 31 Dec 2022 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2026 |
| Land conversion | Converted 18 Jan 2023 · DC | |
|---|---|---|
| Survey numbers | 44/1 · 43/1 · 44/2 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
2.5BHK · avg 81 m² 74.9%3BHK · avg 93 m² 24.6%1BHK · 46 m² 0.6%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 1BHK | 1 | 495 |
| 2.5BHK | 128 | 874 |
| 3BHK | 42 | 998 |
| Sold, Q2 2026-27 | 126 / 171 | |
|---|---|---|
| Unsold, Q2 2026-27 | 45 | |
| Months to sell, derived from filed bookings | 10 months |
| Reflections 66 | 810 m | Locked | |
|---|---|---|---|
| Coevolve Misty Shores | about 1 km | Locked | |
| Vaswani Starlight | about 1 km | Locked | |
| Axis Ekatva | about 1 km | Locked |
| Desai Empire This project | This project is the point the others are measured from | 31 Dec 2026 | 74% (126 of 171) | Not verified yet |
|---|---|---|---|---|
| Reflections 66 | 810 m | 31 Dec 2030 | 15% (10 of 66) | Locked |
| Coevolve Misty Shores | about 1 km | 31 Dec 2029 | 2% (3 of 153) | Locked |
| Vaswani Starlight |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (hi-tech) | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 160 m, Nellurahalli | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 40 m to the north-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 120 m to the north, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 100% | |
| Electricity, built | 80% | |
| Outdoor Sports facility, built | 50% | |
| Swimming Pool, built | 80% | |
| Parks, built | 30% | |
| Water and Sanitation, built | 80% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.12 (191 covered spaces for 171 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported itPossession date in the agreement

| Main structure | 100% · planned by 30 Jun 2025 | |
|---|---|---|
| Electrical and plumbing finishing | 80% · planned by 31 Mar 2026 | |
| Internal roads | Not verified yet | |
| Club house | 100% | |
| Completion | 93% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 31 Dec 2026 | |
|---|---|---|
| Schedule end | 31 Dec 2026 | |
| RERA completion date | 31 Dec 2026 | |
| Work began, as filed | 1 Jan 2024 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 45 m filed | |
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 25 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/381/2022 · issued 22 Nov 2022 | |
| Environmental clearance | SEIAA 157 CON 2022 · EC identification no. EC23B000KA173968 · issued 25 Jan 2023 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 24 Nov 2023 | |
| Engineer's certificate, registration | Dated 24 Nov 2023 | |
| Chartered accountant's certificate, registration | Dated 10 Jan 2024 | |
| Chartered accountant, Form 4 | Dated 8 Apr 2026 | |
Land · ₹23.05 Cr 12.9%Development · ₹155.66 Cr 87.1%
| Estimated cost | ₹178.72 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹85.75 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | ₹89.66 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹56.45 Cr | |
| Land cost revision | Not verified yet | |
Sold (126) 73.7%Unsold (45) 26.3%
| Sold, Q3 2025-26 | 87 / 171 · 84 available | |
|---|---|---|
| Sold, Q4 2025-26 | 94 / 171 · 77 available | |
| Sold, Q1 2026-27 | 110 / 171 · 61 available | |
| Sold, Q2 2026-27 | 126 / 171 · 45 available | |
| Unsold, Q2 2026-27 | 45 | |
| Sold in Q4 2025-26 | 7 | |
| Sold in Q1 2026-27 | 16 | |
| Sold in Q2 2026-27 | 16 | |
| Flats booked, Form 4 Q4 2025-26 | 94 |
| Escrow bank | Axis Bank · Kadugodi | |
|---|---|---|
| Designated account, collected | ₹19.42 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹19.62 Cr in Q2 2026-27 | |
| Amount withdrawable, Form 4 | ₹82,20,90,631 | |
| Escrow account, Q4 2025-26 | ₹15.39 Cr withdrawn | |
| Share of collections deposited in escrow | 100% | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 2 Dec 2023 | Review |
| Building plan (BBMP) | Sanctioned 9 Nov 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · Kadugodi | |

Map of 6 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Reflections 66, price locked; Sobha Windsor Phase 3 Wing 6, 7 And 8, price locked; Sobha Windsor Phase 4 Wing 9, 10 And 11, price locked; Sobha Windsor Phase 2 Wing 3, 4 And 5, price locked; Garuda Grand, price locked; Poetry Of Earth, price locked.
| Assetz 66 & Shibui | about 1.5 km | Locked |
|---|
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | 3.1 km | Locked |
|---|
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | 3.4 km | Locked |
|---|
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | 3.4 km | Locked |
|---|
| Inspira Infinity | about 3.5 km | Locked |
|---|
| Garuda Grand | 3.7 km | Locked |
|---|
| Poetry Of Earth | 3.7 km | Locked |
|---|
| 2g Tula | 4.0 km | Locked |
|---|
| about 1 km |
| 31 Dec 2029 |
| 43% (115 of 269) |
| Locked |
| Axis Ekatva | about 1 km | 30 Jun 2029 | 8% (23 of 287) | Locked |
|---|
| Assetz 66 & Shibui | about 1.5 km | 30 Jun 2028 | 75% (77 of 102) | Locked |
|---|
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | 3.1 km | 30 Sep 2027 | 100% (192 of 192) | Locked |
|---|
| Rent, 4BHK, 3 km | ₹1,00,000 /mo · 14 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹60,000 /mo · 114 listings | |
| Rent, 2BHK, 3 km | ₹37,000 /mo · 143 listings | |
| Rent, 1BHK, 3 km | ₹21,000 /mo · 142 listings | |
| Rent per sq ft, 3 km | ₹36.4 /mo, as listed · 198 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 74 (35 with an approximate location) | |
|---|---|---|
| Flats in them | 21,368 | |
| Booked | 13,017 of 21,368 (61%) | |
| Unsold | 8,351 | |
| Booked a month, pooled | 330 flats | |
| Months to sell, pooled | 24 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | 1.2 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 40 m to the north-east, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 1.7 km, Nallur Halli | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 38.2 | 39 | 25.7 |
| MG Road (CBD) | 17.4 | 22 | 14.9 |
| Manyata Tech Park | 18.9 | 25 | 15.3 |
| ITPL, Whitefield | 2.8 | 6 | 1.8 |
| Ecospace, Bellandur ORR | 9.9 | 15 | 8.0 |
| Electronic City Ph 1 | 25.5 | 32 | 15.9 |
| Landfill or waste transfer station | 3.0 km to the west | |
|---|---|---|
| Sewage treatment plant | 1.3 km to the north | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.7 km to the north, named ITPL on OpenStreetMap |