Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | 1 | – | – | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Adarsh Palm RetreatLapsed · completion date passed | Adarsh Developers | Apartment | 975–5,250 sqft | – |
| Adarsh Palm Retreat Mayberry-Phase 1Lapsed · completion date passed | Akarsh Residence Pvt Ltd | Apartment | 1,757–2,706 sqft carpet (as filed) | Mar 2026 |
| Adarsh RosewoodActive · 15% built | Adarsh Developers | Apartment | 1,335–1,900 sqft | Dec 2027 |
| Aishwarya SiliconLapsed · completion date passed | M/s.AISHWARYA BUILDCON DEVELOPERS | Apartment | 1,084 sqft carpet (as filed) | Apr 2022 |
| Balaji MonarchCompleted · OC 04-12-2020 | SRI BALAJI BUILDERS | Apartment | 835 sqft carpet (as filed) | Completed |
| Bilva ElinaLapsed · completion date passed | Jagadish v | Apartment | – | Jul 2019 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 8 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | 1 | – | – | Red flag |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Carbon Corner StoneCompleted (regulator flag) | CARBON DEVELOPERS Pvt Ltd | Apartment | – | Completed |
| Coco NestLapsed · completion date passed | Hatha Homes Pvt Ltd | Apartment | – | Apr 2023 |
8 of 39 other projects in Bellandur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open K Residency in the interactive atlas
Approval or registration
Land use converted
Special Deputy Commissioner, Bangalore · Survey 452
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 452
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/AD.COM/MDP/0024/21-22
K-RERA filing, approvals
Approval or registration
Khata issued
A Khatha · Bruhat Bangalore Mahanagara Palike · Survey 452
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/150423/005872
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | Piramal Capital & Housing Finance · ₹2.97 Cr disbursed | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 450/418/B36, 451/419/B37, 452/ | |
|---|---|---|
| Land extent, Sy 450/418/B36, 451/419/B37, 452/ | 1,115 sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 994 sq m | |
| Khata | A Khatha · Bruhat Bangalore Mahanagara Palike · 3 Aug 2022 | |
| Sale deed | Dated 24 Mar 2017 | |
| Building plan (BBMP) | Sanctioned 2 Mar 2022 · No. BBMP/AD.COM/MDP/0024/21-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 1 | |
| RERA completion date | 31 Dec 2024 |
| Land conversion | Converted 4 Jul 1995 · Special Deputy Commissioner, Bangalore | |
|---|---|---|
| Survey numbers | 450/418/B36, 451/419/B37, 452/ |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Flats · avg 56 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Flats | 24 | 602 |
| Adarsh Rosewood | about 0.5 km | Locked | |
|---|---|---|---|
| Satori Residence By Genurise | about 1 km | Locked | |
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 2 km | Locked | |
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 2 km | Locked |
| K Residency This project | This project is the point the others are measured from | 31 Dec 2024 | Not filed | Not verified yet |
|---|---|---|---|---|
| Adarsh Rosewood | about 0.5 km | 31 Dec 2027 | 20% (24 of 122) | Locked |
| Satori Residence By Genurise | about 1 km | 30 Jun 2030 | 10% (16 of 161) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1.5 km, Doddakannelli | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Power Backup | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.00 (24 covered spaces for 24 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Dec 2024 | |
| RERA completion date | 31 Dec 2024 | Red flag |
| Work began, as filed | 1 May 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 55 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 12 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 23 Feb 2023 · site inspected 13 Feb 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹3.82 Cr 43.6%Development · ₹4.95 Cr 56.4%
| Estimated cost | ₹8.77 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹8.77 Cr, same as the filing | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Industrial Development Bank of India · jAYANAGAR | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 1 | |
| Developer's project loan | Piramal Capital & Housing Finance · ₹2.97 Cr disbursed | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 2 Mar 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Industrial Development Bank of India · jAYANAGAR | |
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 2 km | Locked |
|---|
| Mana Jardin Neo | about 2.5 km | Locked |
|---|
| Adarsh Parkland | about 3 km | Locked |
|---|
| Haven Phase 2 | about 3 km | Locked |
|---|
| 63 Degree East - Tower E | about 3 km | Locked |
|---|
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 3 km | Locked |
|---|
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 3 km | Locked |
|---|
| SOBHA Neopolis Phase 3 - W 1, 2, 10 & 11 | about 3 km | Locked |
|---|
| Sobha Royal Pavilion Phase 8 - Wing 15 |
|---|
| about 2 km |
| 30 Jun 2026 |
| 100% (113 of 113) |
| Locked |
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 2 km | 30 Jun 2026 | 100% (151 of 151) | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 2 km | 30 Jun 2026 | 100% (227 of 227) | Locked |
|---|
| Mana Jardin Neo | about 2.5 km | 30 Dec 2032 | 27% (22 of 82) | Locked |
|---|
| Projects within 4 km, counted | 84 (84 with an approximate location) | |
|---|---|---|
| Flats in them | 23,728 | |
| Booked | 14,217 of 23,728 (60%) | |
| Unsold | 9,511 | |
| Booked a month, pooled | 340 flats | |
| Months to sell, pooled | 27 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 2 km, Bellandur | |
| Kempegowda Airport | 51 | 32 |
| MG Road (CBD) | 15 | 12 |
| Manyata Tech Park | 23.5 | 16.5 |
| ITPL, Whitefield | 17.5 | 9.5 |
| Ecospace, Bellandur ORR | 6.5 | 2 |
| Electronic City Ph 1 | 14 | 8.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |