Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact.
Title & ownership
Who owns it, and is the title clean?
Locked
Title opinionNot verified yet
Records searched to•• ••• ••••
Charges on the landNot verified yet
Landowner share of sales•• %
Land and deed chain
How the land reached this project
•• ••• ••••
•• ••• ••••
•• ••• ••••
Approvals
Is it approved for its use?
Red flag1 red flag · 2 clear
Building plan (BIAPPA)Sanctioned 23 Sep 2021No. BIAPPA/TP02/CC/30/2018-19
RERA extensionsNone on the filingFiling read 20 Oct 2026
RERA complaints1×Red flagRed flag
Land conversionConverted 14 May 2014District Commisioner
Permits
Validity
Not verified yet
Approval letters
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land1 case
Cases on the builder33 cases
RERA complaintsNo cases
Builder's other projects119 cases
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
Contract & costs
What does a buyer commit to?
Locked
Forfeiture, agreement•• %
Forfeiture, allotment letterNot verified yet
Transfer fee₹ ••,•••
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Recent price, super built-upNot verified yet
Recent price, carpetNot verified yet
Phase 1 → Phase 2Not verified yet
Gross yield, per sq ftNot verified yet
This project
Price
Price per sq ft, super built-up
Location & risks
What is the location like?
Height above nearest drainNot verified yet
Groundwater, taluk average11.4 m below groundYelahanka taluk, July 2023
Water supply, as filedBWSSBDeclared by the promoter
Metro, under constructionabout 2 kmBettahalasuru, under construction
The site
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion100%As of Q3 2025-26, promoter's return
Possession, agreementNot verified yet
StructureNot verified yet
Structural safety certificateNot verified yet
Progress
Completion, architect
Developer
Can the developer deliver?
Clear1 clear
Receivable, sold flatsNot verified yet
Cost left₹72.76 CrAs of Q3 2025-26
Sold429 / 436✓ClearClear
Sold in the latest quarterNot verified yet
Funding
Estimated cost
Loan & collateral
Can it be financed?
Value, 3BHK ANot verified yet
Max loan, 3BHK ANot verified yet
Borrower marginNot verified yet
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Value & LTV
3BHK A
Not verified yet
Calculation
Not verified yet
Conditions
Collateral checks
Data room
Documents filed for this project
Documents filed125On K-RERA
Available12197% of filed
K-RERA only4
Approvals with a validity dateNone read
Approvals & NOCs
What we read
Environmental clearanceIssued 22 Mar 2018Filed as SEIAA, p. 1
Fire NOCIssued 15 Apr 2021Filed as Fire NOC, pp. 1, 6
Available
K-RERA only
Available
1 pageAvailable
4 pagesAvailable
1 pageAvailable
K-RERA only
K-RERA only
45 pagesAvailable
2 pagesAvailable
9 pagesAvailable
12 pages2 factsAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
1 pageAvailable
Filed 21 Jul 20222 pagesAvailable
Filed 21 Jul 202245 pages3 factsAvailable
4 pagesAvailable
1 pageAvailable
3 pagesAvailable
Source: K-RERA project page and the documents filed there, as read by us. 25 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Contract & costs, Title & ownership and Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Survey plots, KGIS cadastral
Road, stream, tank or settlement (not a plot)
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400 and 66 kV
Its corridor, to scale
Buried cable
Storm drain, primary
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, primary
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Power Backup · Water and Sanitation
Club House, built
100%
Electricity, built
100%
Outdoor Sports facility, built
100%
Swimming Pool, built
100%
Power Backup, built
100%
Kitchen handover
Not verified yet
Covered parking per unit
0.99 (430 covered spaces for 436 units)
Sewage plant
Not verified yet
Power backup
Declared by the promoter
Around it
Water
Groundwater, Yelahanka taluk average
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
Water at a glance
Groundwater
Yelahanka taluk average, July 2023: 11.4 m below ground
What it means
Not verified yet
Water below ground
11.4 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
BWSSB
Nearest city water main
Not verified yet
Distances
Within 3 km of the filed pin
Connectivity
Road distance from the site
Nuisances
Distance from the filed pin
Not verified yet
Site photos filed with K-RERA, Q3 2025-26
Work left
By component, Q3 2025-26
Quarterly return, Q3 2025-26
Main structure
100% · planned by 20 May 2024
Electrical and plumbing finishing
100% · planned by 31 Dec 2026
Internal roads
Not verified yet
Club house
100%
Completion
100%
Completion, accountant
78.2% of the estimated cost spent
Dates
Dates
Filed dates
Possession, agreement
Not verified yet
Schedule end
30 May 2027
RERA completion date
30 Jun 2027
Work began, as filed
15 Jul 2022
Specified structure
What the promoter specified · not an inspection
Structure
Not verified yet
Foundation
Not verified yet
Wall material
Not verified yet
Wall thickness
Not verified yet
Concrete / steel grade
Not verified yet
Building heights, fire NOC
43 m (Tower 1, Tower 2, Tower 3), 39.95 m (Tower 4) on the fire NOC
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot