Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 4 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| Aishwarayam TranquilLapsed · completion date passed | MS AISHWARYAM CONCEPT HOMES | Apartment | 807 sqft carpet (as filed) | Mar 2023 |
| Akruthi Spring WoodsLapsed · completion date passed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 590 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | – | 1 | Clear |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | 1 | 1 | Review |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| DAI DORON INDIA PROPERTIES PVT. LTD. |
| Plot |
| – |
| Apr 2019 |
| Akshaya MeadowsLapsed · completion date passed | M/s Akshaya Meadows | Plot | ~1,080–1,800 sqft (estimate: filed carpet plus 25%) | Apr 2026 |
| AmaryllisLapsed · completion date passed | RAKI DEVELOPERS LLP | Apartment | 780–1,047 sqft carpet (as filed) | Jul 2026 |
| Ambiant - Maangalya AshirvadActive · 22% built | AMBIANT HOUSING & CONSTRUCTION PVT LTD. | Apartment | 896–1,171 sqft carpet (as filed) | Apr 2028 |
| Aqua VistaLapsed · completion date passed | POPPY REALTORS PRIVATE LIMITED | Apartment | 323–5,371 sqft carpet (as filed) | Dec 2024 |
| Artha Satori Platinum | Artha Group | Villa | 4,780 sqft | – |
| Artha Zen | Artha Group | Villa | 1,881–4,832 sqft | – |
8 of 190 other projects in Bannerghatta Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open SOBHA Magnus in the interactive atlas
Approval or registration
Land use converted
DC Office, Bangalore · Survey 87/2, 87/3
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · BBMP · Survey 87/2, 87/3
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDSOUTH/0026/25-26
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/131025/008160
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | RBL Bank · ₹100.00 Cr disbursed | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 87/2, 87/3 | |
|---|---|---|
| Land extent, Sy 87/2 | 7 acres 30 gunta | |
| Land extent, Sy 87/3 | 3 Acres | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 23,669 sq m | |
| Khata | E Khatha · BBMP · 6 Jun 2025 | |
| Sale deed | 4 Jun 2015 | |
| Sale deed in favour of | SOBHA LIMITED | |
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 10 Oct 2025 · No. BBMP/Addl.Dir/JDSOUTH/0026/25-26 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/384/2024 · issued 29 Nov 2024 | Clear |
| Environmental clearance | SEIAA 49 CON 2024 · EC identification no. EC24C3801KA5561877N · issued 22 Aug 2024 | Clear |
| Airport height NOC | permissible top elevation 995.15 m above mean sea level | |
| Pollution board (CFE) | consent order CTE-346637 · issued 26 Dec 2024 · valid until 29 Apr 2029 | Clear |
| Water and sewerage NOC (BWSSB) | issued 11 Jul 2024 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 May 2030 |
| Land conversion | Converted 25 Oct 2005 · DC Office, Bangalore | |
|---|---|---|
| Survey numbers | 87/2 · 87/3 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
3BHK · avg 123 m² 85.7%4BHK · avg 165 m² 12.9%2BHK 1.4%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2BHK | 4 | 3,294 |
| 3BHK | 252 | 3,33,175 |
| 4BHK | 38 | 67,317 |
| Sold, Q2 2026-27 | 281 / 294 | |
|---|---|---|
| Unsold, Q2 2026-27 | 13 | |
| Months to sell, derived from filed bookings | 2 months |
| Iris Courtyard | about 0.5 km | Locked | |
|---|---|---|---|
| Aqua Vista | about 1.5 km | Locked | |
| Lodha Azur | 1.6 km | Locked | |
| Azur Tower D | 2.2 km | Locked |
| SOBHA Magnus This project | This project is the point the others are measured from | 31 May 2030 | 96% (281 of 294) | Not verified yet |
|---|---|---|---|---|
| Iris Courtyard | about 0.5 km | 30 Jun 2026 | 30% (12 of 40) | Locked |
| Aqua Vista | about 1.5 km | 31 Dec 2024 | 96% (173 of 181) | Locked |
| Lodha Azur | 1.6 km | 30 Oct 2029 |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 840 m, Kallena Agrahara in Arekere | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 240 m to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 260 m to the south, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
| Amenities declared | Electricity · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Indoor Sports facility, built | 0% | |
| Power Backup, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.75 (514 covered spaces for 294 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it

| Main structure | Not started · planned by 14 Sep 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 27 Apr 2029 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 10% | |
| Completion, accountant | 30.4% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 24 Oct 2029 | |
| RERA completion date | 31 May 2030 | |
| Work began, as filed | 1 Oct 2025 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 29.95 m filed, 5 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/384/2024 · issued 29 Nov 2024 | |
| Environmental clearance | SEIAA 49 CON 2024 · EC identification no. EC24C3801KA5561877N · issued 22 Aug 2024 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 21 Jul 2025 | |
| Engineer's certificate, registration | Dated 26 Jun 2025 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹147.73 Cr 23.9%Development · ₹471.55 Cr 76.1%
| Estimated cost | ₹619.28 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹462.71 Cr | |
| Estimated cost, engineer's certificate | ₹462.71 Cr | |
| Cost incurred | ₹188.30 Cr (30.4% of the estimate) | |
| Cost left | ₹430.98 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (281) 95.6%Unsold (13) 4.4%
| Sold, Q3 2025-26 | 231 / 294 · 63 available | |
|---|---|---|
| Sold, Q4 2025-26 | 260 / 294 · 34 available | |
| Sold, Q1 2026-27 | 272 / 294 · 22 available | |
| Sold, Q2 2026-27 | 281 / 294 · 13 available | |
| Unsold, Q2 2026-27 | 13 | |
| Sold in Q4 2025-26 | 29 | |
| Sold in Q1 2026-27 | 12 | |
| Sold in Q2 2026-27 | 9 |
| Escrow bank | RATNAKAR BANK · RESIDENCY ROAD | |
|---|---|---|
| Designated account, collected | ₹29.39 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹29.04 Cr in Q2 2026-27 (99% of that quarter's deposits) | |
| Escrow account, Q1 2026-27 | ₹36.70 Cr deposited from sales, ₹33.05 Cr withdrawn | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 118 | |
|---|---|---|
| Marked completed | 61 | |
| Past promised date, not completed | 7 | |
| Revoked or withdrawn | 7 | |
| Complaints filed against the promoter | 226 | |
| Other phases under this promoter name | 114 | |
| With a filed extension or completion | 65 (58 completed, 7 extended) | |
| Average schedule slip | 12 months |
| Developer's project loan | RBL Bank · ₹100.00 Cr disbursed | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 10 Oct 2025 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | RATNAKAR BANK · RESIDENCY ROAD | |

Map of 4 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Lodha Azur, price locked; Azur Tower D, price locked; Pacific Legacy, price locked; Sattva Forest Ridge, price locked.
| Platinum Landmark | about 2.5 km | Locked |
|---|
| Pacific Legacy | 3.4 km | Locked |
|---|
| Sattva Forest Ridge | 3.6 km | Locked |
|---|
| Azur Phase 2 | about 4 km | Locked |
|---|
| Srivara Vasudha | about 4.5 km | Locked |
|---|
| Dhiraan Lotus | about 5 km | Locked |
|---|
| Mahindra Eden Phase-2 | about 5 km | Locked |
|---|
| Assetz Canvas & Cove 2.0 - Block A | 5.0 km | Locked |
|---|
| 97% (236 of 244) |
| Locked |
| Azur Tower D | 2.2 km | 30 Apr 2030 | 93% (110 of 118) | Locked |
|---|
| Platinum Landmark | about 2.5 km | 30 Dec 2027 | 17% (18 of 103) | Locked |
|---|
| Pacific Legacy | 3.4 km | 31 Dec 2025 | 20% (8 of 40) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹45,000 /mo · 54 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹26,000 /mo · 97 listings | |
| Rent, 1BHK, 3 km | ₹13,250 /mo · 44 listings | |
| Rent per sq ft, 3 km | ₹28.2 /mo, as listed · 102 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 42 (21 with an approximate location) | |
|---|---|---|
| Flats in them | 9,366 | |
| Booked | 6,195 of 9,366 (66%) | |
| Unsold | 3,171 | |
| Booked a month, pooled | 169 flats | |
| Months to sell, pooled | 19 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Other | |
| Nearest city water main | 280 m | |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 240 m to the south, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 810 m, Kalena Agrahara | |
| Kempegowda Airport | 45.9 | 52 | 38.0 |
| MG Road (CBD) | 12.8 | 18 | 11.1 |
| Manyata Tech Park | 21.8 | 30 | 19.0 |
| ITPL, Whitefield | 28.8 | 34 | 20.2 |
| Ecospace, Bellandur ORR | 16.3 | 21 | 11.3 |
| Electronic City Ph 1 | 17.9 | 18 | 10.5 |
| Landfill or waste transfer station | 2.4 km to the north-east | |
|---|---|---|
| Sewage treatment plant | 480 m to the south-east | |
| Quarry | 2.2 km to the south-east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.3 km to the north |