Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 4 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 16 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 379 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Y @ Whitefield in the interactive atlas
Transfer of the land
Sale deed
Survey 15
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 15
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
KIADB · plan DO2-KIADB-00022/21-22/BP
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/130722/005066
K-RERA registration ·
Transfer of the landTitle checkApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 29 Oct 2021 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
| Side | Schedule in the EC | KGIS neighbours |
|---|---|---|
| North | EC schedule not read yet | Survey 14 (Hoodi) |
| East | EC schedule not read yet | Survey 183, 184 (Hoodi) |
| South | EC schedule not read yet | Survey 17 (Hoodi) |
| West | EC schedule not read yet | Survey 13, 16 (Hoodi) |
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched plots on the KGIS map | 19,159 sq m | |
| Land area filed with K-RERA | 11,700 sq m | |
| Filed area as a share of the KGIS plots' area | 61% | |
| Village, hobli and taluk on the KGIS map | Hoodi, K R Pura-3 hobli, Bangalore-East taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 15 | |
|---|---|---|
| Land extent, Sy 15 | 11,700 sq m | |
| Area on the KGIS map | 19,159 sq m, 1 of 1 filed survey numbers | |
| Land area of this registration | 11,700 sq m | |
| Khata | A Khatha · BBMP · 26 Nov 2021 | |
| Sale deed | Dated 26 Apr 2019 | |
| Title deed | No. BNS-1-05370-2019-20 · Book 1 · Consideration ₹41.02 Cr |
| Survey | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|
| Sy. No. 15 | 1 | 1 acre 11 guntas | Differs: 3 acres 18 guntas apart | Not read yet |
Valid as of this reportValidity ended
| Building plan (KIADB) | Sanctioned 30 Nov 2021 · No. DO2-KIADB-00022/21-22/BP | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC (1 of 2) | KSFES/NOC/074/2023 · issued 16 May 2023 | Clear |
| Fire NOC (2 of 2) | KSFES/NOC/030/2025 · issued 5 Mar 2025 | Clear |
| Environmental clearance | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-345603 · issued 22 Oct 2024 · valid until 3 Jun 2031 | Clear |
| Water and sewerage NOC (BWSSB) | issued 24 Jun 2021 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Mar 2026 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 15 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Flat 1BHK · 36 m² 21%Flat 2BHK · 50 m² 19.4%Flat 1BHK · 33 m² 16.9%Flat 1BHK · 36 m² 13.7%6 other types 29%
| Flat 1BHK | 42 | 355 |
| Flat 1BHK | 22 | 366 |
| Flat 1BHK | 8 | 377 |
| Flat 1BHK | 14 | 388 |
| Flat 1BHK | 34 | 388 |
| Flat 1BHK | 52 | 388 |
| Flat 1BHK | 8 | 388 |
| Flat 2BHK | 48 | 538 |
| Flat 2BHK | 4 | 560 |
| Flat 2BHK | 16 | 560 |
| 2g Tula | about 2 km | Locked | |
|---|---|---|---|
| Garuda Grand | about 2.5 km | Locked | |
| Vaswani Starlight | about 3.5 km | Locked | |
| Coevolve Misty Shores | about 3.5 km | Locked | |
| Axis Ekatva | about 4 km | Locked |
| Y @ Whitefield This project | This project is the point the others are measured from | 31 Mar 2026 | Not filed | Not verified yet |
|---|---|---|---|---|
| 2g Tula | about 2 km | 27 Dec 2027 | 68% (173 of 256) | Locked |
| Garuda Grand | about 2.5 km | 31 Mar 2028 | 41% (56 of 136) | Locked |
| Vaswani Starlight | about 3.5 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1.5 km, GARUDACHARPLAYA BASAVANAGARA | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Seetharampalya Lake | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 0.71 (187 covered spaces for 265 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Other | |
| Nearest city water main | Not verified yet | |
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | Completed, occupancy certificate 10 Sep 2024 | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Jul 2024 | |
| RERA completion date | 31 Mar 2026 | |
| Work began, as filed | 10 Feb 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 29.9 m filed, 2 towers | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 10 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety (1 of 2) | KSFES/NOC/074/2023 · issued 16 May 2023 | |
| Fire safety (2 of 2) | KSFES/NOC/030/2025 · issued 5 Mar 2025 | |
| Environmental clearance | Filed with the registration | |
Land · ₹5.00 Cr 7.6%Development · ₹61.00 Cr 92.4%
| Estimated cost | ₹66.00 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (119) 91.5%Unsold (11) 8.5%
| Flats sold, at completion | 119 | |
|---|---|---|
| Flats unsold, at completion | 11 | |
| Flats in the phase | 130 |
| Escrow bank | HDFC · HSR LAYOUT | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 29 Oct 2021 | Review |
| Building plan (KIADB) | Sanctioned 30 Nov 2021 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · HSR LAYOUT | |
| Assetz Sun & Sanctum - Phase 2 | about 4 km | Locked |
|---|
| Reflections 66 | about 4.5 km | Locked |
|---|
| Assetz 66 & Shibui | about 5 km | Locked |
|---|
| Godrej Splendour | about 5 km | Locked |
|---|
| Godrej Splendour Phase II | about 5 km | Locked |
|---|
| Adarsh Parkland | about 5.5 km | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | about 6 km | Locked |
|---|
| 31 Dec 2029 |
| 43% (115 of 269) |
| Locked |
| Coevolve Misty Shores | about 3.5 km | 31 Dec 2029 | 2% (3 of 153) | Locked |
|---|
| Axis Ekatva | about 4 km | 30 Jun 2029 | 8% (23 of 287) | Locked |
|---|
| Assetz Sun & Sanctum - Phase 2 | about 4 km | 31 Jul 2026 | 100% (70 of 70) | Locked |
|---|
| Projects within 4 km, counted | 46 (46 with an approximate location) | |
|---|---|---|
| Flats in them | 10,379 | |
| Booked | 5,486 of 10,379 (53%) | |
| Unsold | 4,893 | |
| Booked a month, pooled | 108 flats | |
| Months to sell, pooled | 45 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 0.5 km, Seetharam Palya | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 38 | 23.5 |
| MG Road (CBD) | 14.5 | 11.5 |
| Manyata Tech Park | 14 | 11.5 |
| ITPL, Whitefield | 6 | 3 |
| Ecospace, Bellandur ORR | 9 | 7.5 |
| Electronic City Ph 1 | 23.5 | 16.5 |
| Landfill or waste transfer station | about 2 km to the south | |
|---|---|---|
| Sewage treatment plant | about 2 km, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | about 2 km to the west | |
| Crematorium | about 2.5 km to the west | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km |