| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 21 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | 2 | – | Review |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 1 Lakh Multi - Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Apr 2023 |
| 99d By SanthustaActive · 100% built | M/s. SANTHUSTA INFRACON PRIVATE LIMITED | Plot | ~1,080–2,430 sqft (estimate: filed carpet plus 25%) | Jul 2028 |
| Adhya EnclaveLapsed · completion date passed | ADHYA DEVELOPERS | Plot | – | Dec 2023 |
| Affinity FidelityLapsed · completion date passed | SUDHAKARA REDDY ANNEM | Apartment | – | Jul 2022 |
| Affinity SarovarActive · 96% built | AFFINITY PROJECTS LLP | Apartment | 982–1,237 sqft carpet (as filed) | Sep 2027 |
| Alpine Pyramid EfghCompleted (regulator flag) | ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED | Apartment | 1,066 sqft carpet (as filed) | Completed |
| ArenaLapsed · completion date passed | Marudhar Infra | Mixed development | 628–1,053 sqft carpet (as filed) | Sep 2024 |
| Arvind Orchards (Phase 1 + 2)Applied for completion 05/10/2026 | Arvind SmartSpaces | Plot | 1,500–2,400 sqft | Dec 2029 |
8 of 89 other projects in Doddaballapur Road, A to Z. Status is taken from each project's own filing.
All 103 projects in Doddaballapur Road → · Century Real Estate's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Century Eden (Phases 3-5) in the interactive atlas
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
| Building plan (Local Planning Authority) | Sanctioned 10 Jan 2024 · No. DPA/TP/LAO/07/2023-24/1424 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Apr 2027 |
| Land conversion | 4 of 4 parcels converted | |
|---|---|---|
| Sy 34/1 | Converted 18 Mar 1994 · DC | |
| Sy 35/2 | Converted 21 Jan 1998 · DC | |
| Sy 35/3 | Converted 9 Mar 2005 · DC | |
| Sy 79 (Old No. 21) | Converted 29 Apr 2005 · DC | |
| Survey numbers | 34/1 · 35/2 · 35/3 · 79 (Old No. 21) |
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
| Assetz Miru & Miyo | about 9 km | Locked | |
|---|---|---|---|
| Riviera Glade | about 10.5 km | Locked | |
| Sattva City | 11.7 km | Locked |
| Century Eden (Phases 3-5) This project | This project is the point the others are measured from | 30 Apr 2027 | Not filed | Not verified yet |
|---|---|---|---|---|
| Assetz Miru & Miyo | about 9 km | 31 Mar 2031 | 6% (20 of 350) | Locked |
| Riviera Glade | about 10.5 km | 31 Dec 2030 | 28% (31 of 112) | Locked |
| Sattva City |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Agriculture | Review |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 14.3 km, Attur, Near Dairy Circle | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 1.6 km to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 280 m to the north-east, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 30 Apr 2027 | |
| Work began, as filed | 1 May 2024 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Chartered accountant's certificate, registration | Dated 10 Apr 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹20.85 Cr 60.8%Development · ₹13.45 Cr 39.2%
| Estimated cost | ₹34.30 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹12.04 Cr | |
| Estimated cost, chartered accountant's certificate | ₹34.30 Cr, same as the filing | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Axis Bank · Yeshwanthpur Branch | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| K-RERA registrations under this promoter | 21 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 7 | |
| Complaints filed against the promoter | 6 |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 10 Jan 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · Yeshwanthpur Branch | |
| 11.7 km |
| 28 Feb 2032 |
| 17% (425 of 2,491) |
| Locked |
| Projects within 4 km, counted | 7 (5 with an approximate location) | |
|---|---|---|
| Flats in them | 1,416 | |
| Booked | 537 of 1,416 (38%) | |
| Unsold | 879 | |
| Booked a month, pooled | 30 flats | |
| Months to sell, pooled | 30 months |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 31.2 m
Across Doddaballapura, the water table sat 20 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 31.2 m, and it recovered 4.7 m over the year.
| Groundwater | Doddaballapura taluk average, July 2023: 20 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 20 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Majarahosahalli Grama Panchayat) | |
| Nearest city water main | 11.8 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 1.6 km to the south, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 11.8 km, Doddajala | |
| Kempegowda Airport | 30.9 | 33 | 17.8 |
| MG Road (CBD) | 36.6 | 36 | 29.4 |
| Manyata Tech Park | 29.6 | 31 | 22.5 |
| ITPL, Whitefield | 46.6 | 51 | 34.5 |
| Ecospace, Bellandur ORR | 52.2 | 57 | 37.3 |
| Electronic City Ph 1 | 56.5 | 61 | 46.2 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 550 m to the south, named Substation on OpenStreetMap |