Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 1 Lakh Multi - Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Apr 2023 |
| 99d By SanthustaActive · 100% built | M/s. SANTHUSTA INFRACON PRIVATE LIMITED | Plot | ~1,080–2,430 sqft (estimate: filed carpet plus 25%) | Jul 2028 |
| Adhya EnclaveLapsed · completion date passed | ADHYA DEVELOPERS | Plot | – | Dec 2023 |
| Affinity FidelityLapsed · completion date passed | SUDHAKARA REDDY ANNEM | Apartment | – | Jul 2022 |
| Affinity SarovarActive · 96% built | AFFINITY PROJECTS LLP | Apartment | 982–1,237 sqft carpet (as filed) | Sep 2027 |
| Alpine Pyramid EfghCompleted (regulator flag) |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 58 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| ALPINE HOUSING DEVELOPMENT CORPORATION LIMITED |
| Apartment |
| 1,066 sqft carpet (as filed) |
| Completed |
| ArenaLapsed · completion date passed | Marudhar Infra | Mixed development | 628–1,053 sqft carpet (as filed) | Sep 2024 |
| Arvind Orchards (Phase 1 + 2)Applied for completion 05/10/2026 | Arvind SmartSpaces | Plot | 1,500–2,400 sqft | Dec 2029 |
8 of 89 other projects in Doddaballapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Classique Windchimes in the interactive atlas
Approval or registration
Land use converted
DC Office, Bengaluru · Survey 51/3
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Consideration ₹6.37 Cr · Sy 51/3; 51/2, Yelahanka hobli
Title deed filed with K-RERA, pp. 1, 12, 15 · See it in Documents
Transfer of the land
Sale deed
in favour of ALLEGRO MAHABALESHWARA VENTURES LLP · Survey 51/3
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP Addl.Dir JDNORTH 0013 21-22
K-RERA filing, approvals
Approval or registration
Khata issued
A Khatha · BBMP · Survey 51/3
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/110722/005053
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | Not verified yet | |
| Title report dated | 7 Mar 2022 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 51/3 | |
|---|---|---|
| Land extent, Sy 51/3 | 0 Acres 19 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 1,737 sq m | |
| Khata | A Khatha · BBMP · 8 Mar 2022 | |
| Sale deed | Dated 7 Dec 2020 | |
| Sale deed in favour of | ALLEGRO MAHABALESHWARA VENTURES LLP | |
| Building plan (BBMP) | Sanctioned 11 Feb 2022 · No. BBMP Addl.Dir JDNORTH 0013 21-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 3 Mar 2022 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 14 Jul 2026 |
| Land conversion | Converted 7 Aug 2010 · DC Office, Bengaluru | |
|---|---|---|
| Survey numbers | 51/3 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
| Due on signing | Not verified yet | |
|---|---|---|
| Due within 15 days | Not verified yet | |
| Each construction stage | Not verified yet | |
| Floors in payment plan | Not verified yet | |
| Late-payment interest | Not verified yet | |
| Interest the builder pays on late possession | Rate prescribed in the Rules | |
3BHK · avg 104 m² 70.6%2BHK 29.4%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2BHK | 10 | 8,008 |
| 3BHK | 24 | 26,845 |
| Sold, Q2 2026-27 | 34 / 34 | |
|---|---|---|
| Unsold, Q2 2026-27 | 0 |
| Century Kindle Phase 1 | about 1 km | Locked | |
|---|---|---|---|
| Shriram Solitaire | about 2.5 km | Locked | |
| Godrej Aveline | about 3.5 km | Locked | |
| Legacy Salvador | about 3.5 km | Locked | |
| 4square Park Sierra | about 4 km | Locked |
| Classique Windchimes This project | This project is the point the others are measured from | 14 Jul 2026 | 100% (34 of 34) | Not verified yet |
|---|---|---|---|---|
| Century Kindle Phase 1 | about 1 km | 14 Mar 2031 | 73% (336 of 458) | Locked |
| Shriram Solitaire | about 2.5 km | 15 May 2026 | 100% (269 of 269) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, Attur, Near Dairy Circle | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Tuteenahalli Lake | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 100% | |
| Water and Sanitation, built | 100% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.12 (38 covered spaces for 34 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
As the promoter reported itPossession date in the agreement

| Main structure | 100% · planned by 2 Mar 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 10 Jan 2026 | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 14 Jul 2026 | |
|---|---|---|
| Schedule end | 25 Jan 2026 | |
| RERA completion date | 14 Jul 2026 | |
| Grace period for possession | 6 months | |
| Work began, as filed | 1 Mar 2022 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.95 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 10 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Chartered accountant, Form 4 | Dated 9 Apr 2026 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹7.29 Cr 43.3%Development · ₹9.54 Cr 56.7%
| Estimated cost | ₹16.83 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹9.54 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (34) 100%
| Sold, Q3 2025-26 | 32 / 34 · 2 available | |
|---|---|---|
| Sold, Q4 2025-26 | 34 / 34 · 0 available | |
| Sold, Q1 2026-27 | 34 / 34 · 0 available | |
| Sold, Q2 2026-27 | 34 / 34 · 0 available | |
| Unsold, Q2 2026-27 | 0 | |
| Sold in Q4 2025-26 | 2 | |
| Sold in Q1 2026-27 | 0 | |
| Sold in Q2 2026-27 | 0 |
| Escrow bank | HDFC · Kadri | |
|---|---|---|
| Designated account, collected | ₹3.8 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹3.8 L in Q2 2026-27 | |
| Amount deposited in the quarter, Form 4 | ₹1,88,53,573 | |
| Escrow account to date, Q4 2025-26 | ₹27.32 Cr deposited from sales, ₹17.1 L other deposits, ₹27.32 Cr withdrawn, balance ₹0 | |
| Share of collections deposited in escrow | 70% | |
| Sale proceeds realised, Q1 2026-27 | ₹2,69,33,676 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 11 Feb 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · Kadri | |

| Assetz Miru & Miyo | about 4.5 km | Locked |
|---|
| Rubby Castle 1 | about 4.5 km | Locked |
|---|
| Tnm Lakeview | about 5 km | Locked |
|---|
| Riviera Glade | about 5.5 km | Locked |
|---|
| Sri Rama Enclave | about 5.5 km | Locked |
|---|
| Assetz Soho & Sky | about 6.5 km | Locked |
|---|
| Assetz Zen & Sato | about 6.5 km | Locked |
|---|
| about 3.5 km |
| 31 Mar 2031 |
| 91% (769 of 849) |
| Locked |
| Legacy Salvador | about 3.5 km | 31 Dec 2026 | 71% (119 of 167) | Locked |
|---|
| 4square Park Sierra | about 4 km | 31 Dec 2029 | 8% (14 of 170) | Locked |
|---|
| Assetz Miru & Miyo | about 4.5 km | 31 Mar 2031 | 6% (20 of 350) | Locked |
|---|
| Projects within 4 km, counted | 30 (30 with an approximate location) | |
|---|---|---|
| Flats in them | 7,578 | |
| Booked | 4,852 of 7,578 (64%) | |
| Unsold | 2,726 | |
| Booked a month, pooled | 154 flats | |
| Months to sell, pooled | 18 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 3.5 km, Yelahanka | |
| Kempegowda Airport | 24.5 | 17 |
| MG Road (CBD) | 20.5 | 16 |
| Manyata Tech Park | 13.5 | 9.5 |
| ITPL, Whitefield | 30.5 | 23 |
| Ecospace, Bellandur ORR | 36 | 24 |
| Electronic City Ph 1 | 40.5 | 33 |
| Landfill or waste transfer station | about 3 km to the west, named Mavallipura BBMP Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Yelahanka Waste Water Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Puttenahalli Substation on OpenStreetMap |