Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | 1 | – | 2 | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| 4square Park SierraActive · 29% built | 4SQUARE ESTATES | Apartment | 1,083 sqft carpet (as filed) | Dec 2029 |
| Adithya TranquilLapsed · completion date passed | ADITHYA DEVELOPERS | Apartment | – | Jan 2023 |
| Affinity GardeniaActive · 95% built | AFFINITY PROPERTIES LLP | Apartment | 682–853 sqft carpet (as filed) | Dec 2026 |
| After the RainCompleted · OC 30-04-2022 | Total Environment | Villa | 3,184–5,182 sqft | Completed |
| After the Rain - Phase II ACompleted · OC 10-01-2024 | Total Environment Building Systems Private Limited | Mixed development | 290–2,669 sqft carpet (as filed) | Completed |
| After the Rain Phase IIIActive · 3% built | TOTAL ENVIRONMENT BUILDING SYSTEMS PVT LTD | Apartment |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 51 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 2,643–6,964 sqft carpet (as filed) |
| Apr 2032 |
| After The Rain-Phase IibLapsed · completion date passed | Total Environment Building Systems Private Limited | Apartment | – | Aug 2026 |
| After the Rain-Phase IicActive · 48% built | Total Environment Building Systems Private limited | Villa | 3,535 sqft carpet (as filed) | Apr 2028 |
8 of 120 other projects in Yelahanka, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Definer Dolce Vita in the interactive atlas
Approval or registration
Land use converted
The Deputy Commissioner, Bangalore Urban · Survey 56/9, 116/6, 116/5
K-RERA filing, land schedule
Covers 116/6, 116/5 only
Approval or registration
Land use converted
The Deputy Commissioner, Bangalore Urban · Survey 56/9, 116/6, 116/5
K-RERA filing, land schedule
Covers 116/11 only
Approval or registration
Land use converted
The Deputy Commissioner, Bangalore Urban · Survey 116/11
K-RERA filing, land schedule
Covers 116/12, 116/13 only
Approval or registration
Land use converted
The Deputy Commissioner, Bangalore Urban · Survey 116/12, 116/13
K-RERA filing, land schedule
Covers 116/11, 116/12, 116/6, 116/5 only
Approval or registration
Khata issued
E Khatha · Grama Panchayat Singanayakanahalli · Survey 116/11, 116/12, 116/6, 116/5
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Grama Panchayat Singanayakanahalli · Survey 56/9, 116/13
K-RERA filing, land schedule
Covers 116/13 only
Approval or registration
Khata issued
E Khatha · Grama Panchayat Singanayakanahalli · Survey 56/9, 116/13
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/PS/EM/EO-2/TA-3/North/08/2024-25
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/181024/007150
K-RERA registration ·
Approval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 27 Aug 2024 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 56/9, 116/11, 116/12, 116/13, 116/6, 116/5 | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 9,289 sq m | |
| Khata | E Khatha · Grama Panchayat Singanayakanahalli · 30 Sep 2022; E Khatha · Grama Panchayat Singanayakanahalli · 26 Sep 2022 | |
| Building plan (BDA) | Sanctioned 28 Jun 2024 · No. BDA/PS/EM/EO-2/TA-3/North/08/2024-25 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | KSFES/NOC/126/2024 · issued 20 Apr 2024 | Clear |
| Environmental clearance | SEIAA 157 CON 2023 · EC identification no. EC23B038KA175653 · issued 3 Dec 2023 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 1 | |
| RERA completion date | 4 Nov 2029 |
| Land conversion | 6 of 6 parcels converted | |
|---|---|---|
| Sy 56/9, 116/6, 116/5 | Converted 26 Aug 2021 · The Deputy Commissioner, Bangalore Urban | |
| Sy 116/11 | Converted 25 Feb 2022 · The Deputy Commissioner, Bangalore Urban | |
| Sy 116/12, 116/13 | Converted 28 Feb 2022 · The Deputy Commissioner, Bangalore Urban | |
| Survey numbers | 56/9 · 116/11 · 116/12 · 116/13 · 116/6 · 116/5 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 120 m² 83.8%4BHK Duplex · avg 224 m² 7.6%3bhl 4.8%3BHK Duplex 2.9%2BHK · 85 m² 1%
| 2BHK | 1 | 915 |
| 3BHK | 88 | 1,13,441 |
| 3BHK Duplex | 3 | 4,790 |
| 3bhl | 5 | 6,986 |
| 4BHK Duplex | 8 | 19,278 |
| Sold, Q1 2026-27 | 38 / 105 | |
|---|---|---|
| Unsold, Q1 2026-27 | 67 | |
| Months to sell, derived from filed bookings | Too few bookings to project (2 flats booked in 6 months) |
| Assetz Miru & Miyo | about 2.5 km | Locked | |
|---|---|---|---|
| Century Kindle Phase 1 | about 3 km | Locked | |
| Shriram Solitaire | about 3.5 km | Locked | |
| Riviera Glade | about 4.5 km | Locked | |
| Godrej Aveline | about 5 km | Locked |
| Definer Dolce Vita This project | This project is the point the others are measured from | 4 Nov 2029 | 36% (38 of 105) | Not verified yet |
|---|---|---|---|---|
| Assetz Miru & Miyo | about 2.5 km | 31 Mar 2031 | 6% (20 of 350) | Locked |
| Century Kindle Phase 1 | about 3 km | 14 Mar 2031 | 73% (336 of 458) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 3 km, Attur, Near Dairy Circle | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 25% | |
| Electricity, built | 5% | |
| Outdoor Sports facility, built | 2% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 3.43 (360 covered spaces for 105 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
As the promoter reported it

| Main structure | 33% · planned by 30 Sep 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 30 Aug 2027 | |
| Internal roads | Not verified yet | |
| Club house | 25% | |
| Completion | 42% | |
| Completion, accountant | 46.3% of the estimated cost spent | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Mar 2028 | |
| RERA completion date | 4 Nov 2029 | |
| Work began, as filed | 4 Nov 2024 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 34.85 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 27 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026 (3 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | KSFES/NOC/126/2024 · issued 20 Apr 2024 | |
| Environmental clearance | SEIAA 157 CON 2023 · EC identification no. EC23B038KA175653 · issued 3 Dec 2023 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026 (3 filed) | |
| Architect's certificate, registration | Site inspected 31 Jul 2024 | |
| Engineer's certificate, registration | Dated 18 Jul 2024 | |
| Chartered accountant's certificate, registration | Dated 26 Aug 2024 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹2.50 Cr 2.9%Development · ₹85.21 Cr 97.1%
| Estimated cost | ₹87.71 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹83.43 Cr | |
| Estimated cost, Form 4 Q1 2026-27 | ₹91.67 Cr | |
| Cost incurred | ₹42.42 Cr (46.3% of the estimate) | |
| Cost left | ₹49.26 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹53.49 Cr | |
| Land cost revision | Not verified yet | |
Sold (38) 36.2%Unsold (67) 63.8%
| Sold, Q3 2025-26 | 36 / 105 · 69 available | |
|---|---|---|
| Sold, Q4 2025-26 | 39 / 105 · 66 available | |
| Sold, Q1 2026-27 | 38 / 105 · 67 available | |
| Unsold, Q1 2026-27 | 67 | |
| Sold in Q4 2025-26 | 3 | |
| Sold in Q1 2026-27 | 1 booking cancelled or corrected (39 → 38 sold) | |
| Flats booked, Form 4 Q4 2025-26 | 39 |
| Escrow bank | Axis Bank · Malleshwaram | |
|---|---|---|
| Designated account, collected | ₹8.34 Cr in Q1 2026-27 | |
| Designated account, withdrawn | ₹6.52 Cr in Q1 2026-27 (78% of that quarter's deposits) | |
| Amount withdrawable, Form 4 | ₹38,50,32,135 | |
| Net amount withdrawable, Form 4 | ₹14,44,04,121 | |
| Withdrawn from the escrow account to date | ₹24,06,28,014 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 1 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 27 Aug 2024 | Review |
| Building plan (BDA) | Sanctioned 28 Jun 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · Malleshwaram | |

| Legacy Salvador | about 5.5 km | Locked |
|---|
| 4square Park Sierra | about 5.5 km | Locked |
|---|
| Tnm Lakeview | about 6 km | Locked |
|---|
| Rubby Castle 1 | about 6 km | Locked |
|---|
| Assetz Zen & Sato | about 7 km | Locked |
|---|
| Sri Rama Enclave | about 7.5 km | Locked |
|---|
| Assetz Soho & Sky | about 8 km | Locked |
|---|
| Shriram Solitaire |
|---|
| about 3.5 km |
| 15 May 2026 |
| 100% (269 of 269) |
| Locked |
| Riviera Glade | about 4.5 km | 31 Dec 2030 | 28% (31 of 112) | Locked |
|---|
| Godrej Aveline | about 5 km | 31 Mar 2031 | 91% (769 of 849) | Locked |
|---|
| Legacy Salvador | about 5.5 km | 31 Dec 2026 | 71% (119 of 167) | Locked |
|---|
| Projects within 4 km, counted | 20 (20 with an approximate location) | |
|---|---|---|
| Flats in them | 5,028 | |
| Booked | 2,894 of 5,028 (58%) | |
| Unsold | 2,134 | |
| Booked a month, pooled | 88 flats | |
| Months to sell, pooled | 24 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 5 km, Bagalur Cross | |
| Kempegowda Airport | 26 | 16.5 |
| MG Road (CBD) | 22.5 | 18 |
| Manyata Tech Park | 15.5 | 11.5 |
| ITPL, Whitefield | 32.5 | 24.5 |
| Ecospace, Bellandur ORR | 38 | 26 |
| Electronic City Ph 1 | 42 | 35 |
| Landfill or waste transfer station | about 2.5 km to the south-west, named Mavallipura BBMP Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 2 km to the south-east, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km to the north-west, named Yelahanka Powergrid Substation on OpenStreetMap |