Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
Approvals
Disputes & cases
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 3 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | 1 | – | – | Red flag |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 446 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Green Home Anees Enclave is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding village.
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
| Building plan (BDA) | Not verified yet | |
|---|---|---|
| BESCOM | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Jun 2023 |
| Satori Residence By Genurise | about 2.5 km, to a locality centre | Locked | |
|---|---|---|---|
| Assetz Mizumi Reserve Tower A1 A2 A4 | about 2.5 km, to a locality centre | Locked | |
| Abhee Riviera Royale | about 2.5 km, to a locality centre | Locked | |
| Adarsh Rosewood | about 2.5 km, to a locality centre | Locked |
| Green Home Anees Enclave This project | This project is the point the others are measured from | 30 Jun 2023 | Not filed | Not verified yet |
|---|---|---|---|---|
| Satori Residence By Genurise | about 2.5 km, to a locality centre | 30 Jun 2030 | 10% (16 of 161) | Locked |
| Assetz Mizumi Reserve Tower A1 A2 A4 | about 2.5 km, to a locality centre | 30 Dec 2030 | 69% (302 of 440) | Locked |
| Nearest storm drain | about 0.5 km from the locality centre, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km from the locality centre, Kasavanahalli Lake | |
| Height above nearest drain | Not verified yet | |
Ten-year July mean for this taluk: 30.5 m
Across Bengaluru East, the water table sat 27.3 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 30.5 m, and it recovered 1.9 m over the year.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 27.3 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority | |
| Nearest city water main | Not verified yet | |
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km from the locality centre, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | Not verified yet | |
| Landfill or waste transfer station | about 2.5 km from the locality centre, named Karnataka Compost Development Centre - KCDC on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 1.5 km from the locality centre | |
| Quarry | None within 3 km of the locality centre | |
| Crematorium | about 2.5 km from the locality centre, named Kudlu Crematorium on OpenStreetMap | |
| Prison | about 2.5 km from the locality centre, named Bangalore Central Jail on OpenStreetMap | |
| Electrical substation | about 1 km from the locality centre |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 30 Jun 2023 | Red flag |
| Work began, as filed | 1 Jan 2021 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Estimated cost |
|---|
| ₹13.00 Cr |
| Cost incurred | Not verified yet | |
|---|---|---|
| Cost left | Not verified yet | |
|---|---|---|
| Collected from buyers | Not verified yet | |
|---|---|---|
| Receivable, sold flats | Not verified yet | |
|---|---|---|
| Land cost revision | Not verified yet | |
|---|---|---|
| Escrow bank | Axis Bank · Bellandur | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan |
|---|
| Not verified yet |
| Records searched to | Not verified yet | |
|---|---|---|
| Building plan | Not verified yet | |
|---|---|---|
| Unregistered agreements, over 10% paid | Not verified yet | |
|---|---|---|
| Sale deed in favour of | Not verified yet | |
|---|---|---|
| Escrow bank | Axis Bank · Bellandur |
|---|
| Haven Phase 2 | about 3 km, to a locality centre | Locked |
|---|
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 3.5 km, to a locality centre | Locked |
|---|
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 3.5 km, to a locality centre | Locked |
|---|
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 3.5 km, to a locality centre | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 3.5 km, to a locality centre | Locked |
|---|
| Mana Jardin Neo | about 4 km, to a locality centre | Locked |
|---|
| 63 Degree East - Tower E | about 4 km, to a locality centre | Locked |
|---|
| Birla Evara | about 4 km, to a locality centre | Locked |
|---|
| Abhee Riviera Royale | about 2.5 km, to a locality centre | 28 Feb 2027 | 59% (57 of 96) | Locked |
|---|
| Adarsh Rosewood | about 2.5 km, to a locality centre | 31 Dec 2027 | 20% (24 of 122) | Locked |
|---|
| Haven Phase 2 | about 3 km, to a locality centre | 30 Jun 2030 | 11% (16 of 148) | Locked |
|---|
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 3.5 km, to a locality centre | 30 Dec 2030 | 25% (38 of 150) | Locked |
|---|