Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| AuraLapsed · completion date passed | Darshan Gowda B A | Apartment | 945 sqft carpet (as filed) | Apr 2023 |
| BlisstonRegistered · no quarterly update yet | Gurusamy SelvaKumar | Apartment | 1,035 sqft carpet (as filed) | Sep 2026 |
| Brigade Gateway Enclave | Brigade Group | Apartment | 540–2,360 sqft | – |
| Candade Kay Arr SignatureCompleted · OC 29-03-2025 | KAY ARR & CO | Mixed development | 1,196 sqft carpet (as filed) | Completed |
| Construction Of 759 Du's In Bangalore CityLapsed · completion date passed | Karnataka Slum Development Board | Apartment | 494 sqft carpet (as filed) | May 2025 |
| Embassy Heritage | Embassy Group | Apartment | 1,300–2,200 sqft | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 13 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Govianu MargosaLapsed · completion date passed |
| Mahesh G |
| Apartment |
| – |
| Mar 2022 |
| Greenleaf VindhyaCompleted (regulator flag) | GREENLEAF PROJECTS PVT. LTD. | Apartment | 1,421 sqft carpet (as filed) | Completed |
8 of 19 other projects in Malleshwaram, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Greenleaf Bougainvillea in the interactive atlas
Transfer of the land
Sale deed
Survey 7/3-116
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 7/3-116
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Ad.Com./WST/0383/22-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/150922/005245
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | Not verified yet | |
| Title report dated | 14 Jul 2022 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 7-3-116 | |
|---|---|---|
| Land extent, Sy 7-3-116 | 911.82 (unit not stated) | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 909 sq m | |
| Khata | A Khatha · BBMP · 11 Apr 2022 | |
| Sale deed | Dated 8 Dec 2021 | |
| Building plan (BBMP) | Sanctioned 29 Jun 2022 · No. BBMP/Ad.Com./WST/0383/22-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 30 Aug 2022 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2026 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 7-3-116 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 118 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 3BHK | 15 | 1,268 |
| Renaissance Srichakra | about 1 km | Locked | |
|---|---|---|---|
| Vista Padmalaya | about 1.5 km | Locked | |
| Birla Tisya | about 4 km | Locked | |
| Magnolia Delight | about 4.5 km | Locked | |
| Vista Svara | about 5 km | Locked |
| Greenleaf Bougainvillea This project | This project is the point the others are measured from | 31 Dec 2026 | Not filed | Not verified yet |
|---|---|---|---|---|
| Renaissance Srichakra | about 1 km | 11 Aug 2027 | 63% (5 of 8) | Locked |
| Vista Padmalaya | about 1.5 km | 30 Apr 2027 | 40% (4 of 10) | Locked |
| Birla Tisya |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 0.5 km, Near by 2nd Cross Ring Road | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 1 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · Power Backup · Amenity common terrace | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.13 (17 covered spaces for 15 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 26.8 m
Across Bengaluru North, the water table sat 22.7 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 26.8 m, and it fell 4.9 m over the year.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.7 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | Completed, occupancy certificate 19 Sep 2024 | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 31 Dec 2026 | |
|---|---|---|
| Schedule end | 30 Apr 2026 | |
| RERA completion date | 31 Dec 2026 | |
| Completion date, agreement | 31 Dec 2026 | |
| Work began, as filed | 1 Aug 2022 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 11.48 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 7 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Engineer's certificate, registration | Dated 3 Aug 2022 | |
| Chartered accountant's certificate, registration | Dated 17 Aug 2022 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹14.23 Cr 62.4%Development · ₹8.58 Cr 37.6%
| Estimated cost | ₹22.81 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹8.58 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (7) 46.7%Unsold (8) 53.3%
| Flats sold, at completion | 7 | |
|---|---|---|
| Flats unsold, at completion | 8 | |
| Flats in the phase | 15 |
| Escrow bank | Axis Bank · Malleshwaram | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 29 Jun 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · Malleshwaram | |
| Royal Enclave | about 5.5 km | Locked |
|---|
| Sri Rama Enclave | about 7.5 km | Locked |
|---|
| Ranka Iris | about 8 km | Locked |
|---|
| Assetz Soho & Sky | about 8 km | Locked |
|---|
| Mirabelle Phase 2 | about 8.5 km | Locked |
|---|
| Lodha Mirabelle | about 8.5 km | Locked |
|---|
| Cumins Sanctum | about 8.5 km | Locked |
|---|
| about 4 km |
| 31 Dec 2026 |
| 100% (392 of 392) |
| Locked |
| Magnolia Delight | about 4.5 km | 31 Mar 2028 | 21% (10 of 48) | Locked |
|---|
| Vista Svara | about 5 km | 30 Oct 2026 | 50% (16 of 32) | Locked |
|---|
| Royal Enclave | about 5.5 km | 31 Mar 2027 | 73% (44 of 60) | Locked |
|---|
| Projects within 4 km, counted | 15 (15 with an approximate location) | |
|---|---|---|
| Flats in them | 1,506 | |
| Booked | 1,331 of 1,506 (88%) | |
| Unsold | 175 | |
| Booked a month, pooled | 12 flats | |
| Months to sell, pooled | 15 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 0.5 km, Srirampura | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 33 | 26.5 |
| MG Road (CBD) | 6 | 4.5 |
| Manyata Tech Park | 10.5 | 7.5 |
| ITPL, Whitefield | 22 | 18.5 |
| Ecospace, Bellandur ORR | 20.5 | 14.5 |
| Electronic City Ph 1 | 25 | 21.5 |
| Landfill or waste transfer station | about 2 km | |
|---|---|---|
| Sewage treatment plant | about 2 km to the south | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km |