Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | 1 | – | – | Red flag |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 7 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Aishwarayam TranquilLapsed · completion date passed | MS AISHWARYAM CONCEPT HOMES | Apartment | 807 sqft carpet (as filed) | Mar 2023 |
| Akruthi Spring WoodsLapsed · completion date passed | DAI DORON INDIA PROPERTIES PVT. LTD. | Plot | – | Apr 2019 |
| Akshaya MeadowsLapsed · completion date passed | M/s Akshaya Meadows | Plot | ~1,080–1,800 sqft (estimate: filed carpet plus 25%) | Apr 2026 |
| AmaryllisLapsed · completion date passed | RAKI DEVELOPERS LLP | Apartment | 780–1,047 sqft carpet (as filed) | Jul 2026 |
| Ambiant - Maangalya AshirvadActive · 22% built | AMBIANT HOUSING & CONSTRUCTION PVT LTD. | Apartment | 896–1,171 sqft carpet (as filed) | Apr 2028 |
| Aqua VistaLapsed · completion date passed | POPPY REALTORS PRIVATE LIMITED | Apartment | 323–5,371 sqft carpet (as filed) | Dec 2024 |
| Artha Satori Platinum | Artha Group | Villa | 4,780 sqft | – |
| Artha Zen | Artha Group | Villa | 1,881–4,832 sqft | – |
8 of 190 other projects in Bannerghatta Road, A to Z. Status is taken from each project's own filing.
All 199 projects in Bannerghatta Road → · Mahindra Lifespaces's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Mahindra Windchimes in the interactive atlas
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 28 Jul 2017 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Area on the KGIS map | Not verified yet | |
|---|---|---|
| Land area of this registration | 11,977 sq m | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 6 | |
| RERA completion date | 31 Dec 2018 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
| Lodha Azur | 1.5 km | Locked | |
|---|---|---|---|
| Pacific Legacy | 1.6 km | Locked | |
| Iris Courtyard | about 2 km | Locked | |
| Azur Tower D | 2.2 km | Locked |
| Mahindra Windchimes This project | This project is the point the others are measured from | 31 Dec 2018 | Not filed | Not verified yet |
|---|---|---|---|---|
| Lodha Azur | 1.5 km | 30 Oct 2029 | 97% (236 of 244) | Locked |
| Pacific Legacy | 1.6 km | 31 Dec 2025 | 20% (8 of 40) | Locked |
| Iris Courtyard | about 2 km | 30 Jun 2026 |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (general) | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 680 m, RR Layout in Arekere & Hulimavu junction | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 160 m to the north-west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 650 m to the south, Arakere Lake | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Self development | |
| Nearest city water main | 100 m | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 Dec 2018 | |
| Work began, as filed | 25 Jun 2015 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Land · ₹79.73 Cr 28.1%Development · ₹203.76 Cr 71.9%
| Estimated cost | ₹283.49 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | HDFC · Bannerghatta Road, Bangalore | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 6 | |
| K-RERA registrations under this promoter | 7 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 0 | |
| Complaints filed against the promoter | 7 |
| Developer's project loan | Not verified yet | |
|---|---|---|
| Records searched to | 28 Jul 2017 | Review |
| Building plan | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · Bannerghatta Road, Bangalore | |
Map of 3 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Lodha Azur, price locked; Pacific Legacy, price locked; Azur Tower D, price locked.
| Aqua Vista | about 3 km | Locked |
|---|
| Azur Phase 2 | about 3.5 km | Locked |
|---|
| Dhiraan Lotus | about 3.5 km | Locked |
|---|
| Assetz Canvas & Cove 2.0 - Block A | 4.4 km | Locked |
|---|
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 4.5 km | Locked |
|---|
| Platinum Landmark | about 4.5 km | Locked |
|---|
| Mahindra NewHaven | 5.1 km | Locked |
|---|
| K&T's Sai Sannidhi | 5.2 km | Locked |
|---|
| 30% (12 of 40) |
| Locked |
| Azur Tower D | 2.2 km | 30 Apr 2030 | 93% (110 of 118) | Locked |
|---|
| Aqua Vista | about 3 km | 31 Dec 2024 | 96% (173 of 181) | Locked |
|---|
| Azur Phase 2 | about 3.5 km | 31 Dec 2030 | 86% (185 of 214) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹44,000 /mo · 77 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹26,000 /mo · 173 listings | |
| Rent, 1BHK, 3 km | ₹15,000 /mo · 110 listings | |
| Rent per sq ft, 3 km | ₹28.4 /mo, as listed · 150 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 30 (12 with an approximate location) | |
|---|---|---|
| Flats in them | 7,832 | |
| Booked | 5,258 of 7,832 (67%) | |
| Unsold | 2,574 | |
| Booked a month, pooled | 125 flats | |
| Months to sell, pooled | 21 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 160 m to the north-west, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | 640 m, I.I.M.B | |
| Kempegowda Airport | 43.5 | 49 | 36.2 |
| MG Road (CBD) | 10.4 | 15 | 9.5 |
| Manyata Tech Park | 19.4 | 27 | 17.4 |
| ITPL, Whitefield | 26.3 | 31 | 18.3 |
| Ecospace, Bellandur ORR | 13.8 | 18 | 9.6 |
| Electronic City Ph 1 | 18.4 | 18 | 10.2 |
| Landfill or waste transfer station | 570 m to the east | |
|---|---|---|
| Sewage treatment plant | 1.8 km to the south | |
| Quarry | 2.5 km to the south | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.1 km to the west |