Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | |
| 4square Park SierraActive · 29% built | 4SQUARE ESTATES | Apartment | 1,083 sqft carpet (as filed) | Dec 2029 |
| Adithya TranquilLapsed · completion date passed | ADITHYA DEVELOPERS | Apartment | – | Jan 2023 |
| Affinity GardeniaActive · 95% built | AFFINITY PROPERTIES LLP | Apartment | 682–853 sqft carpet (as filed) | Dec 2026 |
| After the RainCompleted · OC 30-04-2022 | Total Environment | Villa | 3,184–5,182 sqft | Completed |
| After the Rain - Phase II ACompleted · OC 10-01-2024 | Total Environment Building Systems Private Limited | Mixed development | 290–2,669 sqft carpet (as filed) | Completed |
| After the Rain Phase IIIActive · 3% built | TOTAL ENVIRONMENT BUILDING SYSTEMS PVT LTD | Apartment |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Builder: MLN Constructions & Developers
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 16 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| – |
| Construction & progress | – | 1 | – | Review |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 2,643–6,964 sqft carpet (as filed) |
| Apr 2032 |
| After The Rain-Phase IibLapsed · completion date passed | Total Environment Building Systems Private Limited | Apartment | – | Aug 2026 |
| After the Rain-Phase IicActive · 48% built | Total Environment Building Systems Private limited | Villa | 3,535 sqft carpet (as filed) | Apr 2028 |
8 of 120 other projects in Yelahanka, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Mln Signature in the interactive atlas
Approval or registration
Land use converted
DC, Bangalore Dist · Survey 56/1, 56/3
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of GVR Infra · Survey 56/1, 56/3
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP Yalahanka · Survey 56/1, 56/3
K-RERA filing, land schedule
Transfer of the land
Joint development agreement registered
Joint development agreement, p. 8 · See it in Documents
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Ad.Com./YLK/1348/20-21
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/472/PR/210323/005802
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 6,157 sq m | |
| Land area filed with K-RERA | 3,638 sq m | |
| Village, hobli and taluk on the KGIS map | Shivanahalli, Yalahanka-1 hobli, Yelahanka taluk | |
| Sketch dimensions | Not verified yet | |
| Sanctioned plan area | Not verified yet | |
| Mutation entry | Not verified yet | |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Survey numbers | 56/1 & 56/3 | |
|---|---|---|
| Land extent, Sy 56/1 & 56/3 | 36 Gunta | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 3,638 sq m | |
| Khata | A Khatha · BBMP Yalahanka · 3 Feb 2021 | |
| Sale deed | Dated 1 Oct 2018 | |
| Sale deed in favour of | GVR Infra | |
| Joint development agreement registered | 13 Sep 2021 | |
|---|---|---|
| Landowner share | Not verified yet | |
| Developer share | Not verified yet | |
| Sale deed signed by | Not verified yet | |
| Building plan (BBMP) | Sanctioned 20 May 2022 · No. BBMP/Ad.Com./YLK/1348/20-21 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 1 Jul 2026 |
| Land conversion | Converted 2 Aug 2004 · DC, Bangalore Dist | |
|---|---|---|
| Survey numbers | 56/1 & 56/3 |
Apartments · avg 105 m² 100%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Apartments | 64 | 1,135 |
| 4square Park Sierra | about 0.5 km | Locked | |
|---|---|---|---|
| Legacy Salvador | about 0.5 km | Locked | |
| Godrej Aveline | about 2.5 km | Locked | |
| Assetz Soho & Sky | about 3 km | Locked | |
| Cumins Sanctum | about 3 km | Locked |
| Mln Signature This project | This project is the point the others are measured from | 1 Jul 2026 | Not filed | Not verified yet |
|---|---|---|---|---|
| 4square Park Sierra | about 0.5 km | 31 Dec 2029 | 8% (14 of 170) | Locked |
| Legacy Salvador | about 0.5 km | 31 Dec 2026 | 71% (119 of 167) | Locked |
| Godrej Aveline |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, LBSnagar Yelahanka | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.11 (71 covered spaces for 64 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | 31 Dec 2025 | |
| RERA completion date | 1 Jul 2026 | Review |
| Work began, as filed | 1 Jul 2022 | |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 32 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 2 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Filed with the registration | |
| Environmental clearance | Not verified yet | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹4.54 Cr 18.1%Development · ₹20.50 Cr 81.9%
| Estimated cost | ₹25.03 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | Axis Bank · Sahakaranagar | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 20 May 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · Sahakaranagar | |
| Assetz Soho & Sky Phase 1b | about 3 km | Locked |
|---|
| Tnm Lakeview | about 4 km | Locked |
|---|
| Sobha City Athena | about 4 km | Locked |
|---|
| Sumadhura Epitome | about 4 km | Locked |
|---|
| Century Kindle Phase 1 | about 4 km | Locked |
|---|
| Sumadhura Solea | about 4.5 km | Locked |
|---|
| Sobha Dream Gardens Phase 5 - Wing 10 | about 4.5 km | Locked |
|---|
| about 2.5 km |
| 31 Mar 2031 |
| 91% (769 of 849) |
| Locked |
| Assetz Soho & Sky | about 3 km | 30 Sep 2026 | 100% (114 of 114) | Locked |
|---|
| Cumins Sanctum | about 3 km | 31 Dec 2031 | 29% (32 of 112) | Locked |
|---|
| Assetz Soho & Sky Phase 1b | about 3 km | 31 Dec 2027 | 100% (120 of 120) | Locked |
|---|
| Projects within 4 km, counted | 53 (53 with an approximate location) | |
|---|---|---|
| Flats in them | 15,546 | |
| Booked | 9,311 of 15,546 (60%) | |
| Unsold | 6,235 | |
| Booked a month, pooled | 264 flats | |
| Months to sell, pooled | 24 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 1 km, Yelahanka | |
| Kempegowda Airport | 23.5 | 16.5 |
| MG Road (CBD) | 15.5 | 13 |
| Manyata Tech Park | 7 | 5.5 |
| ITPL, Whitefield | 25 | 19 |
| Ecospace, Bellandur ORR | 31 | 20.5 |
| Electronic City Ph 1 | 35 | 29.5 |
| Landfill or waste transfer station | about 2.5 km to the south | |
|---|---|---|
| Sewage treatment plant | about 0.5 km, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | about 3 km to the south-east | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km |