Fire NOCKSFES/NOC/655/2017Filed as NOC issued by the Fire Force department after completion of work, pp. 1, 3
Fire NOCbuilding height 72 mFiled as NOC issued by the Fire Force department after completion of work, pp. 1, 3
Available
1 pageAvailable
56 pagesAvailable
2 pages3 factsAvailable
2 pagesAvailable
4 pagesAvailable
8 pagesAvailable
Available
1 pageAvailable
Available
1 pageAvailable
Available
Available
Available
Available
55 pages2 factsAvailable
4 pagesAvailable
2 pagesAvailable
5 pagesAvailable
Source: K-RERA project page and the documents filed there, as read by us. 7 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Unlock this full report₹99 for this report · opens Title & ownership and Disputes & casesUnlock
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Pelican Grove in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
Not verified yet
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report
₹99 for this report opens Title & ownership and Disputes & cases for this project, yours to read for good.
Valid as of this reportValidity ended
Approval letters
Building plan (BDA)
Not verified yet
Power NOC (BESCOM)
Filed with the registration
Fire NOC
KSFES/NOC/655/2017 · building height 72 m
✓Clear
SEIAA
Filed with the registration
Airport height NOC
issued 17 Jul 2017 · permissible top elevation 963.7 m above mean sea level · validity ended 16 Jul 2022
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
Water at a glance
Groundwater
Yelahanka taluk average, July 2023: 11.4 m below ground
What it means
Not verified yet
Water below ground
11.4 m, the taluk average
Through the year
Not verified yet
Water supply, as filed
Self development
Nearest city water main
1.3 km
!Review
Distances
Within 3 km
Connectivity
Road distance from the site
Nuisances
Distance from the site
Completed
Quarterly return
Main structure
Not verified yet
Electrical and plumbing finishing
Not verified yet
Internal roads
Not verified yet
Club house
Not verified yet
Completion
Completed, occupancy certificate 6 Aug 2021
Completion, accountant
Not verified yet
Dates
Dates
Filed dates
Possession, agreement
Not verified yet
Schedule end
10 Feb 2022
RERA completion date
30 Mar 2023
Work began, as filed
1 Jun 2018
Specified structure
What the promoter specified · not an inspection
Structure
RCC framed structure
Foundation
Not verified yet
Wall material
Not verified yet
Wall thickness
Not verified yet
Concrete / steel grade
Not verified yet
Building heights, fire NOC
72 m on the fire NOC
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Land · ₹22.60 Cr 27.6%Development · ₹59.30 Cr 72.4%
Cost left vs buyer dues
Not verified yet
Form 4
Estimated cost
₹81.90 Cr
Cost incurred
Not verified yet
Cost left
Not verified yet
Collected from buyers
Not verified yet
Receivable, sold flats
Not verified yet
Land cost revision
Not verified yet
Sales
Sold vs unsold, at completion
Sold (32) 88.9%Unsold (4) 11.1%
Flats sold per quarter
Completed
K-RERA inventory
Flats sold, at completion
32
Flats unsold, at completion
4
Flats in the phase
36
Compliance
Escrow
Completed
Escrow and filings
Escrow bank
HDFC · KASTURBA ROAD BANGALORE
Designated account, collected
Not verified yet
Designated account, withdrawn
Not verified yet
Unregistered agreements, over 10% paid
Not verified yet
RERA complaints
0
Track record
Average schedule slip
Not verified yet
DOSL builder track
Not verified yet
Developer's project loan
Not verified yet
Records searched to
Not verified yet
Building plan
Not verified yet
Unregistered agreements, over 10% paid
Not verified yet
Sale deed in favour of
Not verified yet
Escrow bank
HDFC · KASTURBA ROAD BANGALORE
Stage
Certified progress
Completed
Basemap: Esri, OpenStreetMap contributors
Map of 7 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: 4square Park Sierra, price locked; Assetz Soho & Sky Phase 1b, price locked; Assetz Soho & Sky, price locked; Sumadhura Epitome, price locked; Sumadhura Solea, price locked; Godrej Aveline, price locked; Sattva La Vita, price locked.
This project
Padlock: that project's price is part of its own report