| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Aspire CalixiaApplied for completion 21/09/2026 | M/S. ASPIRE REAL | Plot | ~1,420–1,780 sqft (estimate: filed carpet plus 25%) | Mar 2028 |
| Brigade Komarla HeightsActive · 100% built | Brigade Group | Apartment | 366–2,142 sqft | Dec 2026 |
| Brigade Nanda HeightsActive · 100% built | Brigade Enterprises Ltd | Apartment | 990–1,550 sqft carpet (as filed) | Dec 2026 |
| Nandi BrindavanExtended to 01-03-2027 | NANDI DEVELOPERS | Apartment | – | Mar 2027 |
| Shiva SakthiActive · 45% built | SHIVASHAKTHI BUILDERS AND DEVELOPERS | Apartment | 2,315 sqft carpet (as filed) | Mar 2027 |
| Sobha ClovellyCompleted (regulator flag) | Sobha Limited | Apartment | 1,573 sqft carpet (as filed) | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 27 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Song Of WindLapsed · completion date passed | ROYAL INDRAPRASTHA BUILDCON LLP | Apartment | 1,095 sqft carpet (as filed) | Feb 2026 |
| Usr SusowdhaCompleted · OC 29-08-2025 | USR BUILDERS AND DEVELOPERS | Apartment | 823–1,040 sqft carpet (as filed) | Completed |
All 8 other projects in Padmanabhanagar, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sai Nandana Marvella in the interactive atlas
Approval or registration
Land use converted
DC Bengaluru · Survey 65/1
K-RERA filing, land schedule
Transfer of the land
Title deed registered
No. SHR-1-03949-2021-22 · Book 1 · executed 24 Nov 2021
Title deed filed with K-RERA, pp. 1, 10 · See it in Documents
Transfer of the land
Sale deed
in favour of Sai Nandana Properties · Survey 65/1
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 65/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Addl.Dir/JDSOUTH/0008/ 22-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/091122/005432
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Page 1
Page 1 of 8 of the survey sketch. Filed with K-RERA: Survey Sketch and Court Order, 8 pages, English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 65-1 | |
|---|---|---|
| Land extent, Sy 65-1 | 2 Acres 13 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 4,501 sq m | |
| Khata | A Khatha · BBMP · 13 Jan 2022 | |
| Sale deed | Dated 24 Nov 2021 | |
| Sale deed in favour of | Sai Nandana Properties | |
| Building plan (BBMP) | Sanctioned 5 Sep 2022 · No. BBMP/Addl.Dir/JDSOUTH/0008/ 22-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 3 Sep 2022 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 30 Sep 2025 |
| Land conversion | Converted 6 Dec 2004 · DC Bengaluru | |
|---|---|---|
| Survey numbers | 65-1 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
3BHK · avg 89 m² 57.9%2BHK · avg 74 m² 42.1%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 40 | 794 |
| 3BHK | 55 | 957 |
| Song Of Wind | about 0.5 km | Locked | |
|---|---|---|---|
| Garden Square | about 1.5 km | Locked | |
| Adarsh Premia | about 2 km | Locked | |
| Sobha Royal Crest | about 3 km | Locked | |
| Srivara Vasudha | about 3.5 km | Locked |
| Sai Nandana Marvella This project | This project is the point the others are measured from | 30 Sep 2025 | Not filed | Not verified yet |
|---|---|---|---|---|
| Song Of Wind | about 0.5 km | 28 Feb 2026 | 63% (10 of 16) | Locked |
| Garden Square | about 1.5 km | 30 Jun 2026 | 84% (193 of 230) | Locked |
| Adarsh Premia | about 2 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 0.5 km, VITTAL NAGAR NEAR ISRO LAYOUT, UTTARAHALLI | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.12 (106 covered spaces for 95 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | Not verified yet | |
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | Completed, occupancy certificate 31 Jan 2025 | |
| Completion, accountant | Not verified yet | |
Builder's schedule runs about 1 month past the promised possession date.
| Possession, agreement | 30 Sep 2025 | |
|---|---|---|
| Schedule end | 31 Oct 2025 | |
| RERA completion date | 30 Sep 2025 | |
| Work began, as filed | 1 Nov 2022 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.95 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 26 Sep 2022 · site inspected 23 Sep 2022 | |
| Engineer's certificate, registration | Dated 26 Sep 2022 | |
| Chartered accountant's certificate, registration | Dated 12 Oct 2022 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹16.25 Cr 29.7%Development · ₹38.51 Cr 70.3%
| Estimated cost | ₹54.76 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹32.42 Cr | |
| Estimated cost, chartered accountant's certificate | ₹54.76 Cr, same as the filing | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (70) 73.7%Unsold (25) 26.3%
| Flats sold, at completion | 70 | |
|---|---|---|
| Flats unsold, at completion | 25 | |
| Flats in the phase | 95 |
| Escrow bank | STATE BANK OF INDIA · Mysuru Bank Circle, Avenue Road Bengaluru-560002. | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 5 Sep 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | STATE BANK OF INDIA · Mysuru Bank Circle, Avenue Road Bengaluru-560002. | |
| Mahindra Eden Phase-2 | about 4.5 km | Locked |
|---|
| Sattva Forest Ridge | about 5 km | Locked |
|---|
| Jhanavi Trishul Alaska | about 5.5 km | Locked |
|---|
| Iris Courtyard | about 5.5 km | Locked |
|---|
| Sumadhura Pramoda | about 5.5 km | Locked |
|---|
| Platinum Landmark | about 5.5 km | Locked |
|---|
| Samaya Sunshine | about 6 km | Locked |
|---|
| 31 Mar 2027 |
| 55% (182 of 330) |
| Locked |
| Sobha Royal Crest | about 3 km | 31 Dec 2028 | 100% (329 of 329) | Locked |
|---|
| Srivara Vasudha | about 3.5 km | 30 Nov 2026 | 100% (95 of 95) | Locked |
|---|
| Mahindra Eden Phase-2 | about 4.5 km | 30 Jul 2027 | 100% (250 of 250) | Locked |
|---|
| Projects within 4 km, counted | 22 (22 with an approximate location) | |
|---|---|---|
| Flats in them | 3,519 | |
| Booked | 2,320 of 3,519 (66%) | |
| Unsold | 1,199 | |
| Booked a month, pooled | 64 flats | |
| Months to sell, pooled | 19 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 2.5 km, Jaya Prakash Nagar | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 45 | 36.5 |
| MG Road (CBD) | 12 | 9.5 |
| Manyata Tech Park | 20.5 | 17 |
| ITPL, Whitefield | 29 | 22 |
| Ecospace, Bellandur ORR | 17 | 14 |
| Electronic City Ph 1 | 27 | 15.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km | |
| Quarry | None within 3 km | |
| Crematorium | about 2.5 km to the north-east | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named ISRO Layout Substation on OpenStreetMap |