Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Adarsh Greens Phase 1Extended to 31-10-2026 | ADARSH HAVEN PRIVATE LIMITED | Apartment | 366–635 sqft carpet (as filed) | Oct 2025 |
| Adarsh Greens Phase 2Extended to 31-05-2027 | ADARSH HAVEN PRIVATE LIMITED | Apartment | 635 sqft carpet (as filed) | May 2026 |
| Adhishree SunshineWithdrawn | ADHISHREE VENTURES INDIA PVT LTD | Apartment | – | Sep 2021 |
| Affinity SowparnikaCompleted · OC 29-04-2019 | Affinity Projects | Apartment | – | Completed |
| Arvind SkylandsCompleted · OC 03-02-2020 | Arvind SmartSpaces Limited | Apartment | 1,063 sqft carpet (as filed) | Completed |
| AureliusActive · 96% built | ECLECTIC HARBOUR CREATORS PRIVATE LIMITED | Apartment | 1,849 sqft carpet (as filed) | Aug 2027 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 13 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Bcm PanacheActive · 40% built | BCM INFRASTRUCTURE PRIVATE LIMITED | Apartment | 1,102–4,865 sqft carpet (as filed) | Mar 2029 |
| Bren Northern LightsCompleted · OC 23-03-2023 | BREN CORPORATION PRIVATE LIMITED | Apartment | – | Completed |
8 of 39 other projects in Jakkur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Shashank Akshadha in the interactive atlas
Approval or registration
Land use converted
DC Bengaluru · Survey 2
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 2
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan L.P.NO:-BBMP/ADDL.DIR/JDNORTH/0065/21-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/190722/005088
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | Not verified yet | |
| Title report dated | 22 Jun 2022 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
| Mortgage on the project land | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 2 | |
|---|---|---|
| Land extent, Sy 2 | 1 Acre 4 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 4,238 sq m | |
| Khata | A Khatha · BBMP · 11 Aug 2021 | |
| Sale deed | Dated 6 Nov 2020 | |
| Building plan (BBMP) | Sanctioned 28 Mar 2022 · No. L.P.NO:-BBMP/ADDL.DIR/JDNORTH/0065/21-22 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order AW-343403 · issued 23 May 2024 | |
| Water and sewerage NOC (BWSSB) | issued 9 Mar 2022 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2024 |
| Land conversion | Converted 1 Jun 2020 · DC Bengaluru | |
|---|---|---|
| Survey numbers | 2 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
2BHK · avg 77 m² 54.2%3BHK · avg 108 m² 45.8%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 65 | 826 |
| 3BHK | 55 | 1,159 |
| 4square Park Sierra | about 1.5 km | Locked | |
|---|---|---|---|
| Legacy Salvador | about 2 km | Locked | |
| Assetz Soho & Sky Phase 1b | about 2 km | Locked | |
| Sobha City Athena | about 2.5 km | Locked | |
| Cumins Sanctum | about 2.5 km |
| Shashank Akshadha This project | This project is the point the others are measured from | 31 Dec 2024 | Not filed | Not verified yet |
|---|---|---|---|---|
| 4square Park Sierra | about 1.5 km | 31 Dec 2029 | 8% (14 of 170) | Locked |
| Legacy Salvador | about 2 km | 31 Dec 2026 | 71% (119 of 167) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 2 km, Shankrappa Layout, MAruthi nagar | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.01 (121 covered spaces for 120 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | Completed, occupancy certificate 12 Apr 2024 | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 31 Dec 2024 | |
|---|---|---|
| Schedule end | 30 Sep 2023 | |
| RERA completion date | 31 Dec 2024 | |
| Work began, as filed | 28 Mar 2022 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 15 m filed | |
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 26 Jun 2022 · site inspected 26 Jun 2022 | |
| Engineer's certificate, registration | Dated 26 Jun 2022 | |
Land · ₹4.35 Cr 20%Development · ₹17.41 Cr 80%
| Estimated cost | ₹21.76 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹17.41 Cr | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (93) 77.5%Unsold (27) 22.5%
| Flats sold, at completion | 93 | |
|---|---|---|
| Flats unsold, at completion | 27 | |
| Flats in the phase | 120 |
| Escrow bank | CITY UNION BANK · JAYANAGAR | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BBMP) | Sanctioned 28 Mar 2022 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | CITY UNION BANK · JAYANAGAR | |
| Locked |
| Godrej Aveline | about 2.5 km | Locked |
|---|
| Sobha Dream Gardens Phase 5 - Wing 10 | about 3 km | Locked |
|---|
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 3 km | Locked |
|---|
| Sobha Dream Gardens Phase 3 - Wing 3 And 4 | about 3 km | Locked |
|---|
| Sumadhura Epitome | about 3 km | Locked |
|---|
| Assetz Soho & Sky | about 3 km | Locked |
|---|
| Sumadhura Solea | about 3 km | Locked |
|---|
| Assetz Soho & Sky Phase 1b |
|---|
| about 2 km |
| 31 Dec 2027 |
| 100% (120 of 120) |
| Locked |
| Sobha City Athena | about 2.5 km | 30 Sep 2027 | 100% (72 of 72) | Locked |
|---|
| Cumins Sanctum | about 2.5 km | 31 Dec 2031 | 29% (32 of 112) | Locked |
|---|
| Godrej Aveline | about 2.5 km | 31 Mar 2031 | 91% (769 of 849) | Locked |
|---|
| Projects within 4 km, counted | 66 (66 with an approximate location) | |
|---|---|---|
| Flats in them | 20,655 | |
| Booked | 12,966 of 20,655 (63%) | |
| Unsold | 7,689 | |
| Booked a month, pooled | 337 flats | |
| Months to sell, pooled | 23 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, secondary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 2 km, Yelahanka | |
| Kempegowda Airport | 23 | 15.5 |
| MG Road (CBD) | 17 | 13 |
| Manyata Tech Park | 7 | 5 |
| ITPL, Whitefield | 25 | 17.5 |
| Ecospace, Bellandur ORR | 29.5 | 19.5 |
| Electronic City Ph 1 | 38.5 | 29 |
| Landfill or waste transfer station | about 3 km to the south-west | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | about 1.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km |