Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 1 | |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Builder: SREEHAN INFRACON (OPC) PRIVATE LIMITED
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 44 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Review |
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 379 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sisira Park in the interactive atlas
Approval or registration
Land use converted
DC Bengaluru Rural District · Survey 9/2, 24, 27
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Bengaluru Rural District · Survey 9/2, 24, 27
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Bengaluru Rural District · Survey 9/2, 24, 27
K-RERA filing, land schedule
Approval or registration
Khata issued
6778.48 Sq m · Department of Rural Development and Panc · Survey 9/2
K-RERA filing, land schedule
Approval or registration
Khata issued
13658.14 · Department of Rural Development and Panc · Survey 24, 27
K-RERA filing, land schedule
Approval or registration
Khata issued
13658.14 · Department of Rural Development and Panc · Survey 24, 27
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Sy 9/2, Hoskote taluk · 1 Acre 27 Guntas
Title deed filed with K-RERA, pp. 1, 43 · See it in Documents
Approval or registration
Building plan sanctioned
Satellite Town Ring Road Planning Authority · plan STRRPA/TP/LAO/08/22-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/304/PR/300426/008611
K-RERA registration
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 9/2, 24, 27 | |
|---|---|---|
| Land extent, Sy 9/2 | 1 Acre 27 Guntas | |
| Land extent, Sy 24 | 1 Acre 25 Gunta | |
| Land extent, Sy 27 | 1 Acre 30 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Khata | 6778.48 Sq m · Department of Rural Development and Panc · 7 Dec 2016; 13658.14 · Department of Rural Development and Panc · 12 Nov 2019 | |
| Building plan (Satellite Town Ring Road Planning Authority) | Sanctioned 26 Dec 2024 · No. STRRPA/TP/LAO/08/22-23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Not verified yet | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Not verified yet | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 22 Jan 2030 |
| Land conversion | Converted 16 Oct 2015 · DC Bengaluru Rural District | |
|---|---|---|
| Survey numbers | 9/2 · 24 · 27 |
| Kumari Nautilus | about 0.5 km | Locked | |
|---|---|---|---|
| Sowparnika Rhythm of Rain | 1.7 km | Locked | |
| Sowparnika Ashiyana Phase II | 2.0 km | Locked | |
| Vintage Valley | about 2 km | Locked |
| Sisira Park This project | This project is the point the others are measured from | 22 Jan 2030 | Not filed | Not verified yet |
|---|---|---|---|---|
| Kumari Nautilus | about 0.5 km | 12 Jan 2028 | 69% (114 of 165) | Locked |
| Sowparnika Rhythm of Rain | 1.7 km | 15 Jan 2032 | 97% (703 of 725) | Locked |
Map of the ground within about 1 km of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (mixed), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | 2.5 km, SIDDHARTHA LAYOUT KADUGODI | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 1.2 km to the west, Dakshina Pinakini, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 210 m to the north-west, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 1 km of the site.
Ten-year July mean for this taluk: 62 m
Across Hosakote, the water table sat 22.6 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 62 m, and it recovered 4.9 m over the year.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 22.6 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell | |
| Nearest city water main | 2.4 km | Review |
| Landfill or waste transfer station | None within 3 km |
|---|
As the promoter reported it
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 50% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 22 Jan 2030 | |
| Work began, as filed | 1 Dec 2025 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jul 2026, Oct 2026 (2 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
Land · ₹10.88 Cr 69.2%Development · ₹4.84 Cr 30.8%
| Estimated cost | ₹15.72 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | ICICI Bank · Aecs Layout Branch Kundalahalli | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 26 Dec 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | ICICI Bank · Aecs Layout Branch Kundalahalli | |
Map of 6 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Sowparnika Rhythm of Rain, price locked; Sowparnika Ashiyana Phase II, price locked; Sowparnika Euphoria in the East, price locked; Sobha Windsor Phase 4 Wing 9, 10 And 11, price locked; Sobha Windsor Phase 2 Wing 3, 4 And 5, price locked; Sobha Windsor Phase 3 Wing 6, 7 And 8, price locked.
| Sowparnika Euphoria in the East | 2.8 km | Locked |
|---|
| Nirmaanika Aria | about 3 km | Locked |
|---|
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | 3.6 km | Locked |
|---|
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | 3.6 km | Locked |
|---|
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | 3.8 km | Locked |
|---|
| Godrej Splendour | 4.5 km | Locked |
|---|
| Godrej Splendour Phase II | about 4.5 km | Locked |
|---|
| Assetz 66 & Shibui | about 5 km | Locked |
|---|
| Sowparnika Ashiyana Phase II |
|---|
| 2.0 km |
| 31 Dec 2025 |
| 99% (419 of 422) |
| Locked |
| Vintage Valley | about 2 km | 31 Jan 2030 | 56% (27 of 48) | Locked |
|---|
| Sowparnika Euphoria in the East | 2.8 km | 31 May 2031 | 99% (1,086 of 1,102) | Locked |
|---|
| Nirmaanika Aria | about 3 km | 31 Dec 2027 | 32% (22 of 68) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹43,300 /mo · 6 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹33,000 /mo · 18 listings | |
| Rent, 1BHK, 3 km | ₹13,000 /mo · 13 listings | |
| Rent per sq ft, 3 km | ₹29.2 /mo, as listed · 22 listings with a size | |
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
| Projects within 4 km, counted | 38 (21 with an approximate location) | |
|---|---|---|
| Flats in them | 15,419 | |
| Booked | 9,541 of 15,419 (62%) | |
| Unsold | 5,878 | |
| Booked a month, pooled | 101 flats | |
| Months to sell, pooled | 53 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 1.2 km to the west, Dakshina Pinakini, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 3.2 km, Whitefield | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 40.5 | 39 | 23.7 |
| MG Road (CBD) | 25.1 | 30 | 20.3 |
| Manyata Tech Park | 24.6 | 32 | 18.7 |
| ITPL, Whitefield | 7.1 | 10 | 5.6 |
| Ecospace, Bellandur ORR | 17.6 | 23 | 14.2 |
| Electronic City Ph 1 | 31.4 | 38 | 21.5 |
| Sewage treatment plant | 970 m to the west, named Kadugodi 6MLD Sewage Treatment Planet on OpenStreetMap |
|---|
| Quarry | None within 3 km |
|---|
| Crematorium | None within 3 km |
|---|
| Prison | None within 3 km |
|---|
| Electrical substation | None within 3 km |
|---|