Overview
Overview
Overview

| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Aashirvad Siddhi PriyaFiled as completed · no completion certificate on record | SEENAPPA P | Plot | ~600–1,240 sqft (estimate: filed carpet plus 25%) | Nov 2024 |
| Aditya OrchardLapsed · completion date passed | Mangala Raghavan | Plot | ~1,200–1,800 sqft (estimate: filed carpet plus 25%) | May 2024 |
| Aprameya Brindavanam EliteCompleted (regulator flag) | Aprameya Properties Pvt Ltd | Plot | – | Completed |
| Ashwasurya Atharva RitewayCompleted (regulator flag) | RITEWAY & KUBERA PROMOTERS | Plot | ~1,200–2,400 sqft (estimate: filed carpet plus 25%) | Completed |
| Axis Banyan CountyCompleted (regulator flag) | R.Harish babu | Plot | – | Completed |
| Birla Apple SpireLapsed · completion date passed | Apple spire India LLP | Apartment |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 33 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Location & risks | – | 1 | 2 | Review |
|---|
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 1,667 sqft carpet (as filed) |
| Sep 2019 |
| BloomfieldsActive · 85% built | Shravan Gupta | Plot | ~600–2,400 sqft (estimate: filed carpet plus 25%) | Apr 2029 |
| BlossomCompleted · OC 11-07-2024 | BRUHASPATI BUILDERS LLP | Apartment | 309 sqft carpet (as filed) | Completed |
8 of 101 other projects in Mysore Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Vijayashree Enclave 3 in the interactive atlas
Approval or registration
Land use converted
DC Office, Bangalore · Survey 117/4, 117/9, 117/10
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office, Bangalore · Survey 117/4, 117/9, 117/10
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office, Bangalore · Survey 117/4, 117/9, 117/10
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan PRL-42/2022-23/25
K-RERA filing, approvals
Approval or registration
Khata issued
E Khatha · Local Panchayath · Survey 117/9
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Local Panchyath · Survey 117/10
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Local panchayath · Survey 117/4
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/030525/007705
K-RERA registration ·
Approval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 25 Feb 2025 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Survey numbers | 117/4, 117/9, 117/10 | |
|---|---|---|
| Land extent, Sy 117/4 | 25 Guntas | |
| Land extent, Sy 117/9 | 20 Guntas | |
| Land extent, Sy 117/10 | 15 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Khata | E Khatha · Local panchayath · 20 Mar 2025; E Khatha · Local Panchayath · 20 Mar 2025; E Khatha · Local Panchyath · 20 Mar 2025 | |
| Building plan (BDA) | Sanctioned 4 Apr 2024 · No. PRL-42/2022-23/25 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire NOC | Not verified yet | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Not verified yet | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Mar 2026 |
| Land conversion | Converted 1 Feb 2022 · DC Office, Bangalore | |
|---|---|---|
| Survey numbers | 117/4 · 117/9 · 117/10 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
| Good Earth Cadence | 2.4 km | Locked | |
|---|---|---|---|
| Good Earth Ochre | 3.0 km | Locked | |
| Samaya Sunshine | about 7 km | Locked | |
| Sumadhura Pramoda | about 9 km | Locked |
| Vijayashree Enclave 3 This project | This project is the point the others are measured from | 31 Mar 2026 | Not filed | Not verified yet |
|---|---|---|---|---|
| Good Earth Cadence | 2.4 km | 31 Dec 2028 | 72% (104 of 145) | Locked |
| Good Earth Ochre | 3.0 km | 31 Oct 2027 | 92% (35 of 38) | Locked |
| Samaya Sunshine |
| Rent per sq ft, 3 km | ₹17.6 /mo, as listed · 5 listings with a size | |
|---|---|---|
| Gross yield | Not verified yet | |
| Gross yield, per sq ft | Not verified yet | |
| Bengaluru median yield | Not verified yet | |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 66 kV, 120 m from the filed location | Clear |
| Nearest government-flagged flood location | 5.2 km, Kengeri Yellamma temple | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | 2.7 km to the south, Vrishabhavati, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 110 m to the west, an unnamed water body | |
| Height above nearest drain | Not verified yet | |
As the promoter reported itPossession date in the agreement

| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 31 Mar 2026 | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 Mar 2026 | |
| Work began, as filed | 1 Jun 2024 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026 (2 filed) | Clear |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Engineer's certificate, registration | Dated 28 Feb 2025 | |
| Chartered accountant's certificate, registration | Dated 25 Feb 2025 | |
Land · ₹3.90 Cr 73.5%Development · ₹1.40 Cr 26.5%
| Estimated cost | ₹5.30 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹1.30 Cr | |
| Cost incurred | ₹1.52 Cr | |
| Cost left | ₹3.79 Cr | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | ₹0 | |
| Land cost revision | Not verified yet | |
| Escrow bank | Axis Bank · Vijayanagar | |
|---|---|---|
| Designated account, collected | ₹0 in Q4 2025-26 | |
| Designated account, withdrawn | ₹0 in Q4 2025-26 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Other phases under this promoter name | 263 | |
|---|---|---|
| With a filed extension or completion | 119 (85 completed, 34 extended) | |
| Average schedule slip | 10 months |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 25 Feb 2025 | |
| Building plan (BDA) | Sanctioned 4 Apr 2024 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Axis Bank · Vijayanagar | |

Map of 2 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Good Earth Cadence, price locked; Good Earth Ochre, price locked.
| Axis Amarissa | about 9.5 km | Locked |
|---|
| Harivishram | about 10 km | Locked |
|---|
| Jhanavi Trishul Alaska | 9.9 km | Locked |
|---|
| Sattva Springs | about 10.5 km | Locked |
|---|
| Sobha Royal Crest | about 11 km | Locked |
|---|
| Mahindra Eden Phase-2 | about 11 km | Locked |
|---|
| Garden Square | 11.3 km | Locked |
|---|
| Srivara Vasudha | about 11.5 km | Locked |
|---|
| about 7 km |
| 31 Dec 2026 |
| 33% (8 of 24) |
| Locked |
| Sumadhura Pramoda | about 9 km | 31 Dec 2029 | 50% (148 of 297) | Locked |
|---|
| Axis Amarissa | about 9.5 km | 31 Dec 2029 | 28% (23 of 81) | Locked |
|---|
| Harivishram | about 10 km | 31 Mar 2027 | 100% (152 of 152) | Locked |
|---|
| Projects within 4 km, counted | 14 (3 with an approximate location) | |
|---|---|---|
| Flats in them | 4,733 | |
| Booked | 2,510 of 4,733 (53%) | |
| Unsold | 2,223 | |
| Booked a month, pooled | 33 flats | |
| Months to sell, pooled | 67 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Local authority (Kumalagodu Grama Panchayath) | |
| Nearest city water main | 5.3 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | 2.7 km to the south, Vrishabhavati, primary drain | |
| Ground level | Not verified yet | |
| Metro, operational | 3.4 km, Challaghatta | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 56.0 | 60 | 46.0 |
| MG Road (CBD) | 23.2 | 29 | 20.6 |
| Manyata Tech Park | 33.5 | 39 | 27.0 |
| ITPL, Whitefield | 40.4 | 47 | 34.3 |
| Ecospace, Bellandur ORR | 37.0 | 40 | 26.5 |
| Electronic City Ph 1 | 33.8 | 30 | 26.0 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.8 km to the north-east, named STP-6 on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 790 m to the south-east, named Kumbalagodu on OpenStreetMap |