Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | ||
| 4square Park SierraActive · 29% built | 4SQUARE ESTATES | Apartment | 1,083 sqft carpet (as filed) | Dec 2029 |
| Adithya TranquilLapsed · completion date passed | ADITHYA DEVELOPERS | Apartment | – | Jan 2023 |
| Affinity GardeniaActive · 95% built | AFFINITY PROPERTIES LLP | Apartment | 682–853 sqft carpet (as filed) | Dec 2026 |
| After the RainCompleted · OC 30-04-2022 | Total Environment | Villa | 3,184–5,182 sqft | Completed |
| After the Rain - Phase II ACompleted · OC 10-01-2024 | Total Environment Building Systems Private Limited | Mixed development | 290–2,669 sqft carpet (as filed) | Completed |
| After the Rain Phase IIIActive · 3% built | TOTAL ENVIRONMENT BUILDING SYSTEMS PVT LTD | Apartment |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
What we read
Source: K-RERA project page and the documents filed there, as read by us. 24 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| – |
| Not verified |
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | 1 | – | Review |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 2,643–6,964 sqft carpet (as filed) |
| Apr 2032 |
| After The Rain-Phase IibLapsed · completion date passed | Total Environment Building Systems Private Limited | Apartment | – | Aug 2026 |
| After the Rain-Phase IicActive · 48% built | Total Environment Building Systems Private limited | Villa | 3,535 sqft carpet (as filed) | Apr 2028 |
8 of 120 other projects in Yelahanka, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Fusion 4 Oyster in the interactive atlas
Approval or registration
Land use converted
BBMP · Survey 28
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 28
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan PRJ/15198/22-23IN
K-RERA filing, approvals
Transfer of the land
Title deed executed
Sy 28, Yelahanka hobli, Bangalore North taluk
Title deed filed with K-RERA, pp. 2, 34 · See it in Documents
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/271123/006435
K-RERA registration ·
Approval or registrationTitle checkTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Not verified yet | |
|---|---|---|
| Records searched to | 21 Jan 2023 | |
| Court-case search | Not verified yet | |
| High Court order | Not verified yet | |
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Page 1
Page 1 of 3 of the survey sketch. Filed with K-RERA: Survey Sketch, 3 pages.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 28 | |
|---|---|---|
| Land extent, Sy 28 | 3 Acres/12140.6 Sq m | |
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 2,018 sq m | |
| Khata | A Khatha · BBMP · 2 Feb 2023 | |
| Building plan (BBMP) | Sanctioned 29 Mar 2023 · No. PRJ/15198/22-23IN | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration | |
| Water and sewerage NOC (BWSSB) | issued 16 Sep 2023 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 15 Jan 2026 |
| Land conversion | Converted 27 Mar 2010 · BBMP | |
|---|---|---|
| Survey numbers | 28 |
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
₹99 for this report opens Contract & costs and Disputes & cases for this project, yours to read for good.
2BHK · avg 84 m² 40%3BHK · avg 108 m² 40%2.5BHK 20%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2.5BHK | 8 | 8,094 |
| 2BHK | 16 | 14,477 |
| 3BHK | 16 | 18,589 |
| Shriram Solitaire | about 1 km | Locked | |
|---|---|---|---|
| Century Kindle Phase 1 | about 1 km | Locked | |
| Rubby Castle 1 | about 2.5 km | Locked | |
| Sri Rama Enclave | about 3.5 km | Locked | |
| Legacy Salvador | about 4.5 km | Locked |
| Fusion 4 Oyster This project | This project is the point the others are measured from | 15 Jan 2026 | Not filed | Not verified yet |
|---|---|---|---|---|
| Shriram Solitaire | about 1 km | 15 May 2026 | 100% (269 of 269) | Locked |
| Century Kindle Phase 1 | about 1 km | 14 Mar 2031 | 73% (336 of 458) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1 km, Attur, Near Dairy Circle | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Covered parking per unit | 1.10 (44 covered spaces for 40 units) | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
Ten-year July mean for this taluk: 32.6 m
Across Yelahanka, the water table sat 11.4 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 32.6 m, and it recovered 9 m over the year.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 11.4 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | Not verified yet | |
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | Not verified yet | |
| Club house | Not verified yet | |
| Completion | Completed, occupancy certificate 28 Aug 2025 | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | 23 Jan 2026 | |
|---|---|---|
| Schedule end | 1 Jan 2026 | |
| RERA completion date | 15 Jan 2026 | |
| Work began, as filed | 15 Jun 2023 |
| Structure | Not verified yet | |
|---|---|---|
| Foundation | Not verified yet | |
| Wall material | Not verified yet | |
| Wall thickness | Not verified yet | |
| Concrete / steel grade | Not verified yet | |
| Building heights, fire NOC | 14.9 m filed | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided, 8 sq m | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | Not verified yet | |
| Environmental clearance | Not verified yet | |
| Architect's certificate, registration | Dated 9 Oct 2023 · site inspected 7 Oct 2023 | |
| Engineer's certificate, registration | Dated 17 Oct 2023 | |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹5.67 Cr 28.3%Development · ₹14.38 Cr 71.7%
| Estimated cost | ₹20.05 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹20.05 Cr, same as the filing | |
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (22) 55%Unsold (18) 45%
| Flats sold, at completion | 22 | |
|---|---|---|
| Flats unsold, at completion | 18 | |
| Flats in the phase | 40 |
| Escrow bank | HDFC · Mathikere | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 21 Jan 2023 | Review |
| Building plan (BBMP) | Sanctioned 29 Mar 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | HDFC · Mathikere | |
| 4square Park Sierra | about 4.5 km | Locked |
|---|
| Godrej Aveline | about 5.5 km | Locked |
|---|
| Assetz Soho & Sky | about 5.5 km | Locked |
|---|
| Cumins Sanctum | about 6 km | Locked |
|---|
| Assetz Miru & Miyo | about 6 km | Locked |
|---|
| Vruksha Greens | about 6.5 km | Locked |
|---|
| Assetz Soho & Sky Phase 1b | about 7 km | Locked |
|---|
| Rubby Castle 1 |
|---|
| about 2.5 km |
| 30 Apr 2029 |
| 25% (8 of 32) |
| Locked |
| Sri Rama Enclave | about 3.5 km | 30 Sep 2026 | 61% (39 of 64) | Locked |
|---|
| Legacy Salvador | about 4.5 km | 31 Dec 2026 | 71% (119 of 167) | Locked |
|---|
| 4square Park Sierra | about 4.5 km | 31 Dec 2029 | 8% (14 of 170) | Locked |
|---|
| Projects within 4 km, counted | 33 (33 with an approximate location) | |
|---|---|---|
| Flats in them | 6,661 | |
| Booked | 3,732 of 6,661 (56%) | |
| Unsold | 2,929 | |
| Booked a month, pooled | 104 flats | |
| Months to sell, pooled | 28 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | Not verified yet | |
| Metro, under construction | about 4.5 km, Yelahanka | |
| Kempegowda Airport | 25 | 19 |
| MG Road (CBD) | 18.5 | 14.5 |
| Manyata Tech Park | 14 | 9 |
| ITPL, Whitefield | 31 | 23 |
| Ecospace, Bellandur ORR | 34 | 23.5 |
| Electronic City Ph 1 | 38 | 31.5 |
| Landfill or waste transfer station | about 2.5 km to the north-west, named Mavallipura BBMP Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 2 km, named Yelahanka Waste Water Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | about 3 km to the west, named MS Palya Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km, named Yelahanka on OpenStreetMap |