| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| 100 TreesCompleted · OC 08-06-2021 | ADIGA PROPERTY DEVELOPERS | Apartment | – | Completed |
| Akshaya RegaliaCompleted (regulator flag) | AKSHAYA BUILDERS AND DEVELOPERS | Apartment | – | Completed |
| Anitha RegencyLapsed · completion date passed | SHAKTHI INFRASTRUCTURE | Apartment | 794 sqft carpet (as filed) | Mar 2024 |
| Anu GreensLapsed · completion date passed | Jyothi P | Plot | ~1,200–1,670 sqft (estimate: filed carpet plus 25%) | Jun 2024 |
| Arkha SanctuaryCompleted (regulator flag) | ARKHA DEVELOPERS | Apartment | 793–945 sqft carpet (as filed) | Completed |
| Casper ValleyRegistered · no quarterly update yet | AURA WAVE ESTATES LLP | Plot | ~1,060–2,000 sqft (estimate: filed carpet plus 25%) | Jun 2027 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us. 21 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Location & risks | – | – | – | – |
|---|
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Century CentralCompleted (regulator flag) | Century joint Development Private Limited | Mixed development | – | Completed |
| Comfot HeightsLapsed · completion date passed | Comfort Builders and Developers | Apartment | 1,015 sqft carpet (as filed) | Oct 2020 |
8 of 59 other projects in Uttarahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Green Earth Phase-I in the interactive atlas
Approval or registration
Land use converted
DC Bengaluru · Survey 63/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/TPM/PRL-18/2022/23- 3104/2022/23
K-RERA filing, approvals
Transfer of the land
Sale deed
in favour of Annragh International LLP · Survey 63/1
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · 0 · Survey 63/1
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/080823/006132
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Charges on the land | Not verified yet | |
|---|---|---|
| Developer's project loan | None declared | |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 63/1 | |
|---|---|---|
| Land extent, Sy 63/1 | 3 Acres, 4 Guntas | |
| Area on the KGIS map | Not verified yet | |
| Khata | E Khatha · 0 · 16 Jul 2023 | |
| Sale deed | Dated 3 Mar 2023 | |
| Sale deed in favour of | Annragh International LLP | |
| Building plan (BDA) | Sanctioned 7 Feb 2023 · No. BDA/TPM/PRL-18/2022/23- 3104/2022/23 | |
|---|---|---|
| Power NOC (BESCOM) | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 31 Dec 2024 |
| Land conversion | Converted 15 Mar 2017 · DC Bengaluru | |
|---|---|---|
| Survey numbers | 63/1 |
₹99 for this report opens Disputes & cases for this project, yours to read for good.
| Samaya Sunshine | about 0.5 km | Locked | |
|---|---|---|---|
| Sumadhura Pramoda | about 3 km | Locked | |
| Good Earth Ochre | about 3.5 km | Locked | |
| Good Earth Cadence | about 4.5 km | Locked | |
| Sobha Royal Crest | about 4.5 km | Locked |
| Green Earth Phase-I This project | This project is the point the others are measured from | 31 Dec 2024 | Not filed | Not verified yet |
|---|---|---|---|---|
| Samaya Sunshine | about 0.5 km | 31 Dec 2026 | 33% (8 of 24) | Locked |
| Sumadhura Pramoda | about 3 km | 31 Dec 2029 | 50% (148 of 297) | Locked |
| Good Earth Ochre |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Not verified yet | |
|---|---|---|
| Nearest high-tension line | Not verified yet | |
| Nearest government-flagged flood location | about 1.5 km, Bandemata-Near Kengeri | |
| Height above nearest drain | Not verified yet | |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank | |
| Height above nearest drain | Not verified yet | |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Across Bengaluru South, the water table sat 16.9 m below ground in July 2023 (KSNDMC, a taluk average), shallower than the ten-year July mean of 23.2 m, and it fell 4.2 m over the year.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | Not verified yet | |
| Water below ground | 16.9 m, the taluk average | |
| Through the year | Not verified yet | |
| Water supply, as filed | BWSSB | |
| Nearest city water main | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 31 Dec 2024 | |
| Work began, as filed | 7 Feb 2023 | |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹21.70 Cr 83.4%Development · ₹4.33 Cr 16.6%
| Estimated cost | ₹26.03 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
| Escrow bank | IDFC FIRST BANK · Basavanagudi Branch | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan (BDA) | Sanctioned 7 Feb 2023 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | IDFC FIRST BANK · Basavanagudi Branch | |
| Garden Square | about 5 km | Locked |
|---|
| Jhanavi Trishul Alaska | about 6 km | Locked |
|---|
| Song Of Wind | about 6 km | Locked |
|---|
| Srivara Vasudha | about 6 km | Locked |
|---|
| Mahindra Eden Phase-2 | about 6.5 km | Locked |
|---|
| Adarsh Premia | about 7.5 km | Locked |
|---|
| Sattva Forest Ridge | about 8 km | Locked |
|---|
| about 3.5 km |
| 31 Oct 2027 |
| 92% (35 of 38) |
| Locked |
| Good Earth Cadence | about 4.5 km | 31 Dec 2028 | 72% (104 of 145) | Locked |
|---|
| Sobha Royal Crest | about 4.5 km | 31 Dec 2028 | 100% (329 of 329) | Locked |
|---|
| Garden Square | about 5 km | 30 Jun 2026 | 84% (193 of 230) | Locked |
|---|
| Projects within 4 km, counted | 23 (23 with an approximate location) | |
|---|---|---|
| Flats in them | 5,549 | |
| Booked | 3,175 of 5,549 (57%) | |
| Unsold | 2,374 | |
| Booked a month, pooled | 68 flats | |
| Months to sell, pooled | 35 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Height above nearest drain | Not verified yet | |
|---|---|---|
| Nearest drain | about 0.5 km, tertiary drain | |
| Ground level | Not verified yet | |
| Metro, operational | about 1.5 km, Kengeri Bus Terminal | |
| Metro, under construction | Not verified yet | |
| Kempegowda Airport | 50.5 | 40 |
| MG Road (CBD) | 18 | 14 |
| Manyata Tech Park | 28.5 | 21 |
| ITPL, Whitefield | 35 | 28 |
| Ecospace, Bellandur ORR | 24.5 | 20 |
| Electronic City Ph 1 | 29 | 21 |
| Landfill or waste transfer station | about 1.5 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Vrishabhavathi Valley 180MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | about 2.5 km to the north-west, named Hindu Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km |